Plan Review Notes
Plan Review Notes For Permit 21080535
Permit Number 21080535
Review Stop P
Sequence Number 1
Notes
Date Text
2022-04-14 13:18:53CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1
 WPB CCCM=WEST PALM BEACH CROSS-CONNECTION CONTROL
 MANUAL REVISED 2017
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC ACC = FLORIDA ACCESSIBILITY CODE 2017 6TH EDITION
 FBC EX = FLORIDA EXISTING BUILDING CODE 2017 6TH
 EDITION
 FBC PL = FLORIDA PLUMBING CODE 2017 6TH EDITION
 FBC FG = FLORIDA FUEL GAS CODE 2017 6TH EDITION
 FAC= FLORIDA ADMINISTRATIVE CODE
 FS = FLORIDA STATUTES
  
 21080535 622 7TH ST
 MASTER 19120504 LOT 7A REVISION
  
 1ST REVIEW
  
 PLUMBING COMMENTS: DENIED
  
 GENERAL COMMENT: DUE TO A CHANGE IN PROCESS, THE
 BACKFLOW PERMIT AND GREASE INTERCEPTOR PERMITS ARE
 REQUIRED TO BE SUBMITTED PRIOR TO ISSUANCE OF THE
 PRIMARY PERMIT (AS APPLICABLE). YOU CAN SUBMIT AN
 APPLICATION "TBD" (TO BE DETERMINED) IF YOU DO NOT HAVE
 A CONTRACTOR SELECTED BY EMAILING A COMPLETED PERMIT
 APPLICATION TO [email protected] . YOU WILL
 RECEIVE INSTRUCTIONS TO PAY FEES AND UPLOAD PLANS. YOU
 MAY UPLOAD PLANS AND PAY FEES AT A FUTURE DATE, BUT THE
 APPLICATION IS REQUIRED AT THIS TIME. WE RECOMMEND THAT
 YOU PAY FEES AND UPLOAD PLANS AT THE SAME TIME. AFTER
 YOU HAVE THE PERMIT(S) GENERATED, NOTIFY ME VIA EMAIL
 AND I WILL CHANGE THE REVIEW STATUS TO PASS.
  
 A REVIEW OF MINIMUM PLUMBING FIXTURE REQUIREMENTS AS
 REQUIRED BY FBC ACC IS PART OF THE PLUMBING REVIEW
 PROCESS BUT IS TYPICALLY ADDRESSED ON THE ARCHITECTURAL
 PLANS. ANY COMMENTS CONCERNING THESE REQUIREMENTS MUST
 BE SATISFACTORILY ADDRESSED PRIOR TO A PLUMBING REVIEW
 APPROVAL.
  
 1.PER WPB FBC 107.2.1, TO SHOW COMPLIANCE WITH FBC ACC
 CHAPTERS 2, 3 AND 6 PROVIDE PLAN AND ELEVATION DETAILS
 FOR NEW TOILET ROOM INDICATING THE FOLLOWING:
 ***A) PROVIDE DIMENSIONS OF CLEARANCE AROUND A WATER
 CLOSET; SHALL BE 60 INCHES MINIMUM MEASURED
 PERPENDICULAR FROM THE SIDE WALL AND 56 INCHES DEEP
 MINIMUM FOR WALL HUNG WATER CLOSETS AND 59 INCHES DEEP
 MINIMUM FOR FLOOR MOUNTED WATER CLOSETS MEASURED
 PERPENDICULAR TO THE REAR WALL PER FBC ACC 604.3.1 AND
 604.8.1.1.
 ***B) PER FBC 606.5 EXPOSED PIPES AND SURFACES. WATER
 SUPPLY & DRAINPIPES UNDER LAVATORIES AND SINKS SHALL BE
 INSULATED OR OTHERWISE CONFIGURED TO PROTECT AGAINST
 CONTACT.
 ***C) MIRRORS LOCATED ABOVE LAVATORIES OR COUNTERTOPS
 SHALL BE INSTALLED WITH THE BOTTOM EDGE OF THE
 ?REFLECTING? SURFACE 40 INCHES MAXIMUM ABOVE THE FINISH
 FLOOR OR GROUND PER FBC ACC 603.3.
 ***D) FLUSH CONTROLS SHALL BE HAND OPERATED OR
 AUTOMATIC. HAND OPERATED FLUSH CONTROLS SHALL COMPLY
 WITH 309. FLUSH CONTROLS SHALL BE LOCATED ON THE OPEN
 SIDE OF THE WATER CLOSET PER FBC ACC 604.6
  
 2.SHOW TOE AND KNEE CLEARANCE FOR THE LAVATORY AS
 REQUIRED BY FBC ACC 306.2 AND 306.3
  
 3. A1.1A: PLUMBING FIXTURE SCHEDULE DOES NOT SHOW
 DRINKING FOUNTAIN AS A REQUIRED FIXTURE. PER WPB FBC
 107.2.1 AND, PROVIDE A NOTE STATING "IN ACCORDANCE WITH
 FBC PL 410.4, THIS RESTAURANT WILL PROVIDE DRINKING
 WATER IN A FLAT BOTTOM CONTAINER FREE OF CHARGE."
  
 4. P701/SANITARY RISER: PER FBC PL 1002.1, PROVIDE A
 WATER SEAL TRAP FOR THE MOP SINK.
  
 5. P801: REGARDING THE PLUMBING FIXTURE SCHEDULE
 COMMENT REFERRING TO ARCHITECT, OWNERSHIP OR INTERIOR
 DESIGN FOR SELECTION OF ALL FIXTURES AND ACCESSORIES,
 PER WPB FBC 107.2.1, SUBMIT MANUFACTURER"S
 SPECIFICATION/INSTALLATION MANUALS FOR ALL SCHEDULED
 PLUMBING FIXTURES AND ACCESSORIES.
  
 6. RE: P701/DETAIL 5; WATER HEATER DETAIL. DETAIL
 INDICATES CONCRETE ANCHORS FOR WALL MOUNTED WATER
 HEATER SUPPORT. A2.0B ENLARGED FLOOR PLANS INDICATE
 METAL FRAMED PARTITIONS, NOT CONCRETE WALLS. PER WPB
 FBC 107.2.1, CLARIFY AND CORRECT AS NECESSARY.
  
 7.P701/DETAIL 5 NOTES PAN DRAIN TO THE MOP SINK;
 P801/WATER HEATER SCHEDULE NOTE 3 CALLS FOR PAN DRAIN
 TO NEAREST FLOOR DRAIN. PER WPB FBC 107.2.1, PLEASE
 CLARIFY AND RECONCILE; IT IS NOTED THAT THERE IS NO
 FLOOR DRAIN ON THE PLANS.
  
 8.P701/DETAIL 5 SHOWS T&P RELIEF VALVE DISCHARGE
 INDIRECTLY TO THE MOP SINK BUT SHOWS IT DISCHARGING TO
 THE PAN DRAIN THROUGH AN AIR GAP. PER WPB FBC 107.2.1,
 PLEASE CLARIFY AND RECONCILE; IT IS NOTED THAT THERE IS
 NO FLOOR DRAIN ON THE PLANS. PLEASE NOTE THAT ANY
 DISCHARGE TO A RECEPTACLE WILL REQUIRE AN AIR GAP PER
 FBC PL 504.2.
  
 9. N/A
  
 10. ALL COMPONENTS IN THE DOMESTIC WATER SYSTEM SHALL
 BE LEAD FREE IN ACCORDANCE WITH FBC PL 605.2 AND
 605.2.1. PER WPB FBC 107.2.1, PROVIDE NOTE ON PLANS
 STATING THE SAME.
  
 11. GREASE INTERCEPTOR: PLEASE NOTE THAT PER FBC PL
 301.7 AND 303.2, THE INSTALLATION OF THE SCHIER GB-75
 GREASE INTERCEPTOR SHALL CONFORM TO A MINIMUM OF THE
 MANUFACTURER'S RECOMMENDATIONS. IN ACCORDANCE WITH THE
 GB-75 INSTALLATION GUIDE PAGE 8, 9 AND 10 OF 10, A
 TWO-WAY CLEANOUT IS REQUIRED ON BOTH THE INLET AND
 OUTLET SIDE OF THE GREASE INTERCEPTOR.
  
 12. PER WPB FBC 107.2.1, PROVIDE DETAIL FOR TIEDOWN OF
 GREASE INTERCEPTOR. PROVIDE DETAIL OF BURIED TANK.
 PROVIDE INFORMATION SHOWING THAT BOTTOM EDGE OF
 EXCAVATION WILL NOT ADVERSELY AFFECT OR UNDERMINE THE
 FOOTERS. SEE FBC PL 307.5 AND FBC 1803.5.7. SEE THE
 FOLLOWING:
 ***A) PLEASE NOTE THAT PER FBC PL 301.7 AND 303.2, THE
 INSTALLATION OF THE SCHIER GB-75 GREASE INTERCEPTOR
 SHALL CONFORM TO A MINIMUM OF THE MANUFACTURER'S
 RECOMMENDATIONS.
 ***B) TO BE CLEAR, PROVIDE A DETAIL FOR THE UNDERGROUND
 INSTALLATION OF THE SCHIER GB-75 GREASE INTERCEPTOR.
 PLEASE REFER TO THE SCHIER GB-75 INSTALLATION GUIDE
 PAGE 3, 8, 9 AND 10 OF 10 FOR DETAILS. PLEASE NOTE THE
 REFERENCE TO TIE DOWNS AND MAKE A FINAL DETERMINATION
 AS TO THE APPLICABILITY TO THIS PROJECT.
 ***C) PROVIDE INFORMATION SHOWING THAT BOTTOM EDGE OF
 EXCAVATION WILL NOT ADVERSELY AFFECT OR UNDERMINE THE
 FOOTERS. SEE FBC PL 307.5 AND FBC 1803.5.7.
  
 13. REGARDING THE SAMPLING POINT INSTALLED UPSTREAM OF
 THE GB-75:
 ***A) IN ACCORDANCE WITH THE SCHIER SV-10 INSTALLATION
 GUIDE (SEE FBC PL 301.7 AND 303.2), THE SAMPLING POINT
 SHALL BE DOWNSTREAM OF THE INTERCEPTOR.
 ***B) PER WPB FBC 107.2.1, PLEASE SPECIFY THE SAMPLING
 POINT DEVICE TO BE INSTALLED (SCHIER PRODUCT IS SV-10)
 ***C) PLEASE NOTE THAT THE JURISDICTION ACCEPTS A
 TWO-WAY CLEANOUT FOR USE AS A SAMPLING POINT
  
 14. PER FBC PL 606.2(2), PROVIDE A SHUT-OFF VALVE ON
 THE WATER SUPPLY PIPE TO EACH SILLCOCK/HOSE BIB.
  
  
 END OF COMMENTS.
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS. ALL PLANS TO BE SIGNED
 AND SEALED BY THE DESIGNER AS REQUIRED BY FAC AND FS.
  
 JERALD SMITH
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
 EMAIL [email protected]
 MOBILE 561-246-0882
 PLEASE NOTE THAT I TYPICALLY WORK ON TUESDAYS AND
 THURSDAYS
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved