2021-10-16 10:49:30 | PLAN REVIEW BUILDING |
| |
| CHRISTOPHER S. THROOP, C.B.O., CFM |
| PLANS EXAMINER II PX3169/SFP306 |
| INSPECTOR BN4338 |
| BUILDING OFFICIAL BU1635 |
| ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935 |
| DEVELOPMENT SERVICES DEPARTMENT |
| CITY OF WEST PALM BEACH |
| (561) 805-6726 |
| [email protected] |
| |
| CODES IN EFFECT: |
| 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST |
| PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| CHAPTER 1 ADMINISTRATION |
| 2017 NEC |
| |
| 3RD REVIEW - FREE STANDING 2-CAR GARAGE |
| |
| RESULTS: DENIED |
| ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| |
| NOTICE #1: |
| PROVISO ON SITE PLAN A0.0: SEPERATE PERMIT REQUIRED FOR |
| SITE WALLS. |
| |
| NOTICE #2: |
| PROPERTY IS LOCATED IN A SPECIAL FLOOD HAZARD AREA |
| (SFHA). IT IS LOCATED IN ZONE AE WITH A BASE FLOOD |
| ELEVATION OF 6.0 FEET NAVD. DESIGN FLOOD ELEVATIN SHALL |
| BE 8.0' NAVD OR HIGHER. |
| PROPOSED TOP OF SLAB IS 6.56' NAVD. FLOOD OPENINGS ARE |
| REQUIRED PER R322. |
| |
| |
| NOTICE #3: |
| PROVIDE AN ELEVATION CERTIFICATE WITH AN ACCURATELY |
| COMPLETED BOUNDY LINE SURVEY FOR THE FREE STANDING |
| 2-CAR GARAGE. |
| |
| 3 EC S REQUIRED: |
| |
| A CONSTRUCTION DRAWING ELEVATION CERTIFICATE IS |
| REQUIRED AT TIME OF PERMIT APPLICATION. |
| |
| A BUILDING UNDER CONSTRUCTION ELEVATION CERTIFICATE IS |
| REQUIRED AT PLACEMENT OF 1ST FLOOR. |
| |
| A FINISHED CONSTRUCTION ELEVATION CERTIFICATE IS |
| REQUIRED AND SHALL BE SUBMITTED FOR REVIEW AND APPROVAL |
| PRIOR TO THE ISSUANCE OF THE CERTIFICATE OF OCCUPANCY. |
| NOTE: YOU MAY SUBMIT THIS EC FOR REVIEW AFTER FINAL |
| GRADE AND PLACEMENT OF EQUIPMENT SERVICING THE |
| BUILDING. |
| |
| COMMENTS: |
| |
| 1. PROVIDE A CURRENT FLORIDA PRODUCT APPROVAL OR THE |
| ICC-ES REPORT FOR THE PROPOSED ENGINEERED FLOOD VENTS |
| MODEL 1540-521. |
| FBC 107.3.4 PROVIDE PRODUCT APPROVALS FOR THOSE |
| PRODUCTS WHICH ARE REGULATED BY FAC RULE 9N-3 REVIEWED |
| AND APPROVED IN WRITING BY THE DESIGNER OF RECORD. |
| |
| 2. FLOOD OPENINGS SHALL BE INSTALLED PER R322.2.2. |
| R322.2.2.1INSTALLATION OF OPENINGS. |
| THE WALLS OF ENCLOSED AREAS SHALL HAVE OPENINGS |
| INSTALLED SUCH THAT: |
| 1. FLOOD OPENINGS SHALL BE INSTALLED ON ADJACENT SIDES |
| OF EACH ENCLOSED AREA; IF A BUILDING HAS MORE THAN ONE |
| ENCLOSED AREA BELOW THE DESIGN FLOOD ELEVATION, EACH |
| AREA SHALL HAVE OPENINGS. |
| 2. THE BOTTOM OF EACH OPENING SHALL BE NOT MORE THAN 1 |
| FOOT (305 MM) ABOVE THE HIGHER OF THE FINAL INTERIOR |
| GRADE OR FLOOR AND THE FINISHED EXTERIOR GRADE |
| IMMEDIATELY UNDER EACH OPENING. |
| 3. OPENINGS SHALL BE PERMITTED TO BE INSTALLED IN DOORS |
| AND WINDOWS; DOORS AND WINDOWS WITHOUT INSTALLED |
| OPENINGS DO NOT MEET THE REQUIREMENTS OF THIS SECTION. |
| |
| |
| PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| |