Date |
Text |
2022-07-21 08:48:15 | PETER E VALENTI |
| BUILDING PLANS EXAMINER II |
| [email protected] |
| 561 805 6673 |
| |
| FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| FBC B = FBC BUILDING |
| FBC R = FBC RESIDENTIAL |
| FBC EB = EXISTING BUILDING |
| FBC A = FBC ACCESSIBILITY |
| FBC EC = FBC ENERGY CONSERVATION |
| FBC M = FBC MECHANICAL |
| FBC FG = FBC FUEL GAS |
| |
| BUILDING REVIEW DENIED: |
| |
| 2. PROVIDE A SITE DRAINAGE PLAN. |
| PROVIDE A SITE DRAINAGE PLAN PER FBC R401.3 |
| IT SHALL BE DRAWN IN ACCORDANCE WITH AN ACCURATE AND |
| INCLUDED BOUNDARY LINE SURVEY. |
| FBC R401.3 SITE DRAINAGE |
| SURFACE DRAINAGE SHALL BE DIVERTED TO A STORM SEWER |
| CONVEYANCE OR OTHER APPROVED POINT OF COLLECTION THAT |
| DOES NOT CREATE A HAZARD. |
| LOTS SHALL BE GRADED TO DRAIN SURFACE WATER AWAY FROM |
| FOUNDATION WALLS. THE GRADE SHALL FALL A MINIMUM OF 6 |
| INCHES WITHIN THE FIRST 10 FEET. |
| |
| 3. PROVIDE PRODUCT APPROVALS FOR WINDOWS AND EXT. |
| DOORS. |
| FBC 107.3.4 PROVIDE PRODUCT APPROVALS FOR THOSE |
| PRODUCTS WHICH ARE REGULATED BY FAC RULE 9N?3 REVIEWED |
| AND APPROVED IN WRITING BY THE DESIGNER OF RECORD. |
| |
| DEFERRAL OPTION: |
| |
| 107.3.4.1 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS |
| SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE |
| PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE |
| TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO |
| THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. |
| DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE |
| PRIORAPPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED |
| DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST |
| THE DEFERRED SUBMITTALS ON |
| THE CONSTRUCTION DOCUMENTS FOR REVIEW BY THE BUILDING |
| OFFICIAL. |
| DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| OFFICIAL. |
| |
| PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| |
| |