2021-09-14 09:53:55 | 09/14/21 2ND POOL PLUMBING REVIEW**DENIED** WITH |
| COMMENTS |
| |
| NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| |
| 1. THE TOTAL DYNAMIC HEAD CALCULATIONS FOR THE MAXIMUM |
| SYSTEM FLOW COMPONENTS IS MISSING THE HEAT PUMP. THE |
| TDH CALCULATIONS MUST INCLUDE ALL THE SYSTEM |
| COMPONENTS, INCLUDING SUCTION AND RETURN PIPING, |
| FITTINGS, VALVES, HEATER, FILTER, AND CHLORINATOR. ALL |
| SYSTEM COMPONENTS EXCEPT THE PUMP PER THE ANSI/APSP/ICC |
| 7 - 2015 SECS. 4.4.9, 4.4.9.1 MAXIMUM SYSTEM FLOW |
| RATE?UNSECURED CONTROL SYSTEMS. |
| |
| 2. INDICATE ON THE PUMP CURVE WHICH CURVE KEY IS FOR |
| THE PUMP BEING INSTALLED ON THIS SYSTEM PER THE WPB |
| AMEND. TO FBC SEC. 107.2.1. |
| |
| 3. ALL POOL HEATERS SHALL BE EQUIPPED WITH A READILY |
| ACCESSIBLE ON-OFF SWITCH THAT IS MOUNTED OUTSIDE THE |
| HEATER TO ALLOW SHUTTING OFF THE HEATER WITHOUT |
| ADJUSTING THE THERMOSTAT SETTING PER THE 2020 |
| FBC-ENERGY ? SEC. R403.10.1 |
| |
| WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION & |
| REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES. |
| A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW |
| COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION |
| MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| THE CHANGES CAN BE FOUND WILL HELP EXPEDITE YOUR |
| PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| |
| HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA |
| |
| LUIS A. CRESPO |
| PLUMBING PLAN EXAMINER / INSPECTOR |
| EMAIL: [email protected] OFFICE: 561 805-6720 |
| |