Date |
Text |
2021-07-27 10:41:14 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| MARSHAL, WITH THE FOLLOWING COMMENTS: |
| |
| 1) PLEASE PROVIDE A DETAILED REVIEW OF THE CONCERN OF |
| FALLING CONSTRUCTION DEBRIS AND WHAT LIFE SAFETY |
| FEATURES WILL BE PROVIDED/INSTALLED TO PROTECT |
| PEDESTRIANS AND THOSE ON THE AMENTITY DECK THROUGHOUT |
| THE REPAIR PROCESS. |
| |
| PER NFPA 1: |
| |
| 4.5.1.2 WHERE IT IS EVIDENT THAT A REASONABLE DEGREE OF |
| SAFETY |
| IS PROVIDED, ANY REQUIREMENT SHALL BE PERMITTED TO BE |
| MODIFIED |
| IF ITS APPLICATION WOULD BE HAZARDOUS UNDER NORMAL |
| OCCUPANCY |
| CONDITIONS IN THE JUDGMENT OF THE AHJ. |
| |
| 4.5.6 CONSTRUCTION, REPAIR, AND IMPROVEMENT OPERATIONS. |
| 4.5.6.1 BUILDINGS OR PORTIONS OF BUILDINGS SHALL BE |
| PERMITTED |
| TO BE OCCUPIED DURING CONSTRUCTION, REPAIR, |
| ALTERATIONS, OR ADDITIONS |
| ONLY WHERE REQUIRED MEANS OF EGRESS AND REQUIRED FIRE |
| PROTECTION FEATURES ARE IN PLACE AND CONTINUOUSLY |
| MAINTAINED |
| FOR THE PORTION OCCUPIED OR WHERE ALTERNATIVE LIFE |
| SAFETY MEASURES |
| AND BUILDING PROTECTION MEASURES ACCEPTABLE TO THE AHJ |
| ARE IN PLACE. |
| |
| PER NFPA 241, INCLUDING BUT NOT LIMITED TO: |
| |
| CHAPTER 8 SAFEGUARDING CONSTRUCTION AND ALTERATION |
| OPERATIONS |
| 8.1 GENERAL. IN ADDITION TO THE SPECIFIC REQUIREMENTS |
| OF THIS |
| CHAPTER, THE PROVISIONS OF CHAPTER 1 AND CHAPTERS 3 |
| THROUGH 7 |
| SHALL BE FOLLOWED, AS APPLICABLE, FOR ALL CONSTRUCTION. |
| |
| CHAPTER 9 SAFEGUARDING ROOFING OPERATIONS |
| 9.1 GENERAL. ALL ROOFING OPERATIONS INVOLVING HEAT |
| SOURCES |
| AND HOT PROCESSES SHALL BE CONDUCTED BY A QUALIFIED |
| AGENCY. |
| |
| |
| 2) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| ABOVE. |
| |
| |
| 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| RE-SUBMITTAL OF THE ABOVE. |
| |
| |
| PETER LEDUC |
| FIRE MARSHAL |
| 561-804-4709 |
| [email protected] |
| |