Plan Review Notes
Plan Review Notes For Permit 21070509
Permit Number 21070509
Review Stop G
Sequence Number 1
Notes
Date Text
2021-08-02 10:54:221) SUBMIT A GAS ISOMETRIC DRAWING THAT CLEARLY SHOWS
 THE LENGTH OF ALL CUT SECTIONS OF PIPE PER FBC-FUEL
 GAS, SECS. 402.4.1, 402.4.2.
 2) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL
 PIPE SIZES, TYPE OF GAS (LP OR NATURAL).WPB AMEND. TO
 FBC SEC. 107.2.1.
 3) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL
 BTU LOAD ON THE SYSTEM. REFER TO THE FBC-FUEL GAS
 SECS.401.8, 402.2, AND TABLES 402.4 (1) THRU 402.4
 (37).
 4) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS
 METER / MP REGULATOR) TO THE MOST REMOTE OUTLET IN THE
 BUILDING AND / OR SYSTEM PER THE FBC-FUEL GAS
 SEC.402.4.1, 402.4.2.
 5) SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE
 FBC-FUEL GAS CODE SEC.304.1.
 6) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM
 ON THE PLAN PER FBC-FUEL GAS SEC.402.1, 402.4.3 THRU
 402.6.
 7) SUBMIT A DETAIL SHOWING THE TYPE OF VENT, LOCATION,
 SIZE, TERMINATION POINT, HEIGHT ABOVE THE ROOF AND
 ANCHORING DETAILS OF THE GAS VENT(S) PER FBC-FUEL GAS
 SECS. 502 THRU 505.
 8) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS /
 INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY
 COMPLIANCE WITH STANDARDS NFPA 54, AND FBC- FUEL GAS
 CODE SEC. 402.2, AND 301.3. GAS APPLIANCES SHALL BE
 LISTED AND LABELED. THE INSTALLATION MANUALS FOR ALL
 GAS APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME
 OF INSPECTION. FBC-FUEL GAS CODE SEC.305.1.
 9) EMERGENCY HOOD SHUT DOWN SHUT OFF VALVE SHALL BE
 BELOW THE CEILING. THE MANUAL SHUTOFF VALVE SHALL BE
 UPSTREAM. UNION TO BE DOWN STREAM OF MANUAL VALVE. NFPA
 96-14. SECS. 10.4.1, 10.4.3, 10.4.4, 10.5.1.
 10) SUBMIT THE APPLICABLE SIZING TABLES USED TO SIZE
 THE GAS SYSTEM OR PLACE A NOTE ON THE PLANS/DRAWINGS
 SPECIFYING WHICH SIZING TABLE(S) FROM THE FBC-FUEL GAS
 CODE OR OTHER STANDARD THAT WERE USED IN THE DESIGN OF
 THIS GAS SYSTEM. REFER TO THE FBC-FUEL GAS SECS. 401.4,
 401.8, 402.3, AND TABLES 402.4 (1) THRU 402.4 (37).
 11) SHOW THE LOCATION OF ALL MP (STEP-DOWN) REGULATORS
 ( IF APPLICABLE). A LISTED SHUTOFF VALVE SHALL BE
 INSTALLED IMMEDIATELY AHEAD OF EACH MP REGULATOR AND A
 UNION SHALL BE INSTALLED WITHIN ONE FOOT UPSTREAM OR
 DOWNSTREAM OF EACH REGULATOR. FBC-FUEL GAS SEC.409.4,
 410.2 (7).
 12) ) SUBMIT MANUFACTURER?S SPECIFICATIONS AND
 INSTALLATION INSTRUCTIONS FOR THE PRESSURE REGULATORS
 (IF APPLICABLE). REGULATORS INSTALLED ON THE EXTERIOR
 OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR
 INSTALLATION. IDENTIFY ON THE SPECIFICATION SHEETS
 WHICH MODEL REGULATOR IS BEING INSTALLED AND THE
 ORIFICE SIZE TO ENSURE THE REGULATOR CAN ACCOMMODATE
 THE BTU LOAD THROUGH THE REGULATOR. FGC SEC.410.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  
  
  