2022-02-16 09:29:32 | 2ND PLUMBING REVIEW |
| |
| V7 FPC - 2020 FLORIDA PLUMBING CODE |
| 2017 WPB CHPT 1 AMEND - 2017 WEST PALM BEACH AMENDMENTS |
| TO THE FBC CHAPTER 1 |
| |
| THIS PLAN WAS REVIEWED FOR CODE COMPLIANCE AND FAILED |
| BY RYAN BROWN WITH THE FOLLOWING COMMENTS. |
| |
| 3) 2ND REQUEST-- SHT. A-403 - MOUNTING HEIGHTS FOR |
| ACCESSIBILITY - THE PLAN REFERS TO THE 2014 FBC. THE |
| 2020 EDITION OF THE CODE IS IN EFFECT. PLEASE REVISE |
| THIS NOTE. |
| 4) 2ND REQUEST-- SHT. A-403 - WATER CLOSET REAR GRAB |
| BAR. THE LAYOUT OFF THE REAR GRAB BAR SHALL COMPLY WITH |
| FBC-ACCESS SEC.604.5.2 AND FIGURE 604.5.2. |
| 9) 2ND REQUEST-- SUBMIT SIZING CALCULATIONS AND THE |
| CAPACITY OF THE GREASE INTERCEPTOR. SIZING CALCULATIONS |
| WERE NEVER DONE UNDER THE GREASE INTERCEPTOR PERMIT |
| #19110598 AND WERE DEFERRED TO THE BUILDOUT. PROVIDE |
| THE MAKE AND MODEL OF THE INTERCEPTOR ON THE PLANS. |
| FBC-PLUMBING SEC. 1003.2. |
| 11) 2ND REQUEST-- THE HAND SINKS AND DUMP SINK SHALL |
| DISCHARGE TO THE SANITARY SYSTEM PER FBC-PLUMBING |
| SEC.1003.2. |
| 12) 2ND REQUEST-- THE CLEAR WATER WASTE FROM |
| EVAPORATORS, ICE MACHINES, ETC. SHALL NOT DISCHARGE TO |
| THE GREASE WASTE SYSTEMS PER FBC - PLUMBING SEC.1003.2. |
| 14) 2ND REQUEST-- SHT.P-4 - PLUMBING FIXTURE LIST - |
| IN-LINE BACKFLOW DEVICES - THE TABLE LISTS 1022 |
| APPROVED BACKFLOW DEVICES. THESE BACKFLOWS ARE ONLY |
| APPROVED FOR CARBONATED BEVERAGE MACHINES. BACKFLOW |
| DEVICES FOR NON-CARBONATED MACHINES/DISPENSERS SHALL |
| COMPLY WITH ASSE 1024. PLACE THIS NOTE ON THE PLANS. |
| WPB AMEND. TO FBC SEC. 107.2.1. |
| 15) NEW COMMENT: IT APPEARS THAT SHEET A-203 WAS NOT |
| UPDATED. THE FLOOR PLAN ON THE EQUIPMENT PLAN DOES NOT |
| MATCH THE FLOOR LAYOUT. PLEASE UPDATE AND MAKE SURE ALL |
| EQUIPMENT IS LISTED INCLUDING ICE MAKERS AND |
| APPLIANCES. |
| |
| |
| RYAN W. BROWN |
| CHIEF PLUMBING INSPECTOR |
| OFFICE: 561-805-6692 |
| CELL: 561-517-4293 |
| EMAIL: [email protected] |
| |
| |