Date |
Text |
2021-08-06 06:57:29 | 1) SHT. CVR - SHT. #A-403 IS NOT LISTED IN THE INDEX OF |
| DRAWINGS. PLEASE INCLUDE. |
| 2) BASED ON THE OCCUPANT LOAD LISTED ON SHT. A-202, A |
| MINIMUM OF TWO WATER CLOSETS ARE REQUIRED FOR THE MALES |
| AND TWO FOR THE FEMALES PER FBC-PLUMBING SEC. 403.1 AND |
| TABLE 403.1. |
| 3) SHT. A-403 - MOUNTING HEIGHTS FOR ACCESSIBILITY - |
| THE PLAN REFERS TO THE 2014 FBC. THE 2020 EDITION OF |
| THE CODE IS IN EFFECT. PLEASE REVISE THIS NOTE. |
| 4) SHT. A-403 - WATER CLOSET REAR GRAB BAR. THE LAYOUT |
| OFF THE REAR GRAB BAR SHALL COMPLY WITH FBC-ACCESS. |
| SEC.604.5.2 AND FIGURE 604.5.2. |
| 5) THE NAMING CONVENTIONS OF THE UPLOADED PLANS DOES |
| NOT CORRELATE WITH THE DESCRIPTION OF THE PLANS ON THE |
| COVER SHEET. CLARIFY. |
| 6) INDICATE THE WALL FINISH FOR THE MOP SINK ON THE |
| FINISH SCHEDULE. THE WALL FINISH SHALL COMPLY WITH FBC |
| -BUILDING SEC. 1210.2.2. EPOXY PAINT ON DRYWALL DOES |
| NOT MEET THE INTENT OF THE CODE. |
| 7) SHT. A-403 - THE CIRCULAR TURNING SPACE IN THE |
| TOILET ROOMS APPEARS TO HITTING THE WATER |
| CLOSETS.CLARIFY. |
| 8) A SECTION OF THE BAR SHALL COMPLY WITH |
| FBC-ACCESS.902.1, 902.2 & 902.3. |
| 9) SUBMIT SIZING CALCULATIONS AND THE CAPACITY OF THE |
| GREASE INTERCEPTOR. SIZING CALCULATIONS WERE NEVER DONE |
| UNDER THE GREASE INTERCEPTOR PERMIT #19110598 AND WERE |
| DEFERRED TO THE BUILDOUT. PROVIDE THE MAKE AND MODEL OF |
| THE INTERCEPTOR ON THE PLANS. FBC-PLUMBING SEC. 1003.2. |
| 10) SHT. M-4 - DETAIL #J - THE PVC PIPE ON THE ROOF |
| SHALL BE PRROTECTED AGAINST UV RAYS.FBC-PLUMBING |
| SEC.303.2 |
| 11) THE HAND SINKS AND DUMP SINK SHALL DISCHARGE TO THE |
| SANITARY SYSTEM PER FBC-PLUMBING SEC.1003.2. |
| 12) THE CLEAR WATER WASTE FROM EVAPORATORS, ICE |
| MACHINES, EETC. SHALL NOT DISCHARGE TO THE GREASE WASTE |
| SUSTEMS PER FBC=PLUMBING SEC.1003.2. |
| 13) SHT.P-3 - SIZE ALL THE VENTS ON THE SANITARY RISER |
| DIAGRAM. WPB AMEND. TO FBC SECS. 107.2.1, 107.3.5.1.3. |
| 14) SHT.P-4 - PLUMBING FIXTURE LIST - IN-LINE BACKFLOW |
| DEVICES - THE TABLE LISTS 1022 APPROVED BACKFLOW |
| DEVICES. THESE BACKFLOWS ARE ONLY APPROVED FOR |
| CARBONATED BEVERAGE MACHINES. BACKFLOWW DEVICES FOR |
| NON-CARBONATED MACHINES/DISPENSERS SHALL COMPLY WITH |
| ASSE 1024. PLACE THIS NOTE ON THE PLANS.WPB AMEND. TO |
| FBC SEC. 107.2.1. |
| 15) A BACKFLOW DEVICE IS REQUIRED ON THE DISHWASHER PER |
| FBC-PLUMBING SEC.608.2. |
| 16) HEATED - WATER CIRCULATION SYSTEMS SHALL BE |
| PROVIDED WITH A CIRCULATION PUMP PER FBC-ENERGY |
| SEC.C404.6.1.THE PUMP INSTALLATION AND CONTROLS SHALL |
| COMPLY WITH FBC-ENERGY SEC. C404.6.1. |
| 17) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS FOR THE |
| KHS FLOW SPLITTERS. WPB AMEND. TO FBC SEC. 107.2.1. |
| 18) SUBMIT DETAILS FOR THE BEER STORAGE AREA. WILL |
| THERE BE ANY ADDITIONAL PIPING OTHER THAN THE KEG |
| TUBING SEVING THE PRODUCT? |
| |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| PLUMBING PLAN REVIEW |
| 561-805-6692 |
| [email protected] |
| |