2021-07-26 13:55:04 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| MARSHAL, WITH THE FOLLOWING COMMENTS: |
| |
| 1) THERE ARE NO INDICATIONS THAT THE BUILDINGS WILL |
| REMIAN OCCUPIED, OR NOT OCCUPIED, DURING THE ANY PART |
| OR ENTIRE CONSTUCTION PROCESS. |
| |
| PLEASE PROVIDE A DETAILED LIFE SAFETY PLAN AND INCLUDE |
| AN APPLICABLE NOTE AS TO THE INTENT TO OCCUPY OR VACATE |
| UNTIL ALL FINAL INSPECTIONS. |
| |
| SHOULD THE INTENT BE TO OCCUPY THE LIFE SAFETY PLAN |
| SHALL INCLUDE SPECIFIC DETAILS TO PROTECT THE OCCUPANTS |
| AND THAT ALL EXITS SHALL ARE FUNCTIONAL OR ALTENATE |
| EXITS ARE PROVIDE WITHIN THE REQUIRMENTS OF THE LIFE |
| SAFETY CODE. |
| |
| PER NFPA 241 |
| |
| CHAPTER 1 ADMINISTRATION |
| |
| 1.1* SCOPE. THIS STANDARD SHALL APPLY TO STRUCTURES IN |
| THE |
| COURSE OF CONSTRUCTION, ALTERATION, OR DEMOLITION, |
| INCLUDING |
| THOSE IN UNDERGROUND LOCATIONS. |
| 1.2 PURPOSE. THIS STANDARD IS INTENDED TO PRESCRIBE |
| MINIMUM |
| SAFEGUARDS FOR CONSTRUCTION, ALTERATION, AND DEMOLITION |
| OPERATIONS |
| IN ORDER TO PROVIDE REASONABLE SAFETY TO LIFE AND |
| PROPERTY |
| FROM FIRE DURING SUCH OPERATIONS. |
| 1.3 APPLICATION. |
| 1.3.1* THIS STANDARD PROVIDES MEASURES FOR PREVENTING |
| OR |
| MINIMIZING FIRE DAMAGE DURING CONSTRUCTION, ALTERATION, |
| AND |
| DEMOLITION OPERATIONS. |
| |
| CHAPTER 7 FIRE PROTECTION |
| |
| 7.1 FIRE SAFETY PROGRAM. |
| 7.1.1 AN OVERALL CONSTRUCTION OR DEMOLITION FIRE SAFETY |
| PROGRAM |
| SHALL BE DEVELOPED. |
| 7.1.2 ALL OF THE FOLLOWING ITEMS SHALL BE ADDRESSED IN |
| THE FIRE |
| SAFETY PROGRAM: |
| (1) GOOD HOUSEKEEPING |
| (2) ON-SITE SECURITY |
| (3) FIRE PROTECTION SYSTEMS |
| (A) FOR CONSTRUCTION OPERATIONS, INSTALLATION OF NEW |
| FIRE |
| PROTECTION SYSTEMS AS CONSTRUCTION PROGRESSES |
| (B) FOR DEMOLITION OPERATIONS, PRESERVATION OF EXISTING |
| FIRE PROTECTION SYSTEMS DURING DEMOLITION |
| (4) ORGANIZATION AND TRAINING OF AN ON-SITE FIRE |
| BRIGADE |
| (5) DEVELOPMENT OF A PREFIRE PLAN WITH THE LOCAL FIRE |
| DEPARTMENT |
| (6) RAPID COMMUNICATION |
| (7) CONSIDERATION OF SPECIAL HAZARDS RESULTING FROM |
| PREVIOUS |
| OCCUPANCIES |
| (8) PROTECTION OF EXISTING STRUCTURES AND EQUIPMENT |
| FROM EXPOSURE |
| FIRES RESULTING FROM CONSTRUCTION, ALTERATION, AND |
| DEMOLITION OPERATIONS |
| 7.2 OWNER?S RESPONSIBILITY FOR FIRE PROTECTION. |
| 7.2.1* THE OWNER SHALL DESIGNATE A PERSON WHO SHALL BE |
| RESPONSIBLE |
| FOR THE FIRE PREVENTION PROGRAM AND WHO SHALL ENSURE |
| THAT IT IS CARRIED OUT TO COMPLETION. |
| |
| 8.2* SCAFFOLDING, SHORING, AND FORMS. |
| 8.2.1 ACCUMULATIONS OF UNNECESSARY COMBUSTIBLE FORMS OR |
| FORM LUMBER SHALL BE PROHIBITED. |
| 8.2.2 COMBUSTIBLE FORMS OR FORM LUMBER SHALL BE BROUGHT |
| INTO THE STRUCTURE ONLY WHEN NEEDED. |
| 8.2.3 COMBUSTIBLE FORMS OR FORM LUMBER SHALL BE REMOVED |
| FROM THE STRUCTURE AS SOON AS STRIPPING IS COMPLETE. |
| 8.2.4 THOSE PORTIONS OF THE STRUCTURE WHERE COMBUSTIBLE |
| FORMS ARE PRESENT SHALL NOT BE USED FOR THE STORAGE OF |
| OTHER |
| COMBUSTIBLE BUILDING MATERIALS. |
| |
| CHAPTER 10 SAFEGUARDING DEMOLITION OPERATIONS |
| 10.1 GENERAL. IN ADDITION TO THE SPECIFIC REQUIREMENTS |
| OF THIS |
| CHAPTER, THE PROVISIONS OF CHAPTER 1 AND CHAPTERS 3 |
| THROUGH 7 |
| SHALL BE FOLLOWED, AS APPLICABLE, FOR ALL DEMOLITION |
| OPERATIONS. |
| |
| PLEASE REVIEW AND PROVIDE SPECIFIC DETAILS AS |
| APPLICABLE. |
| |
| |
| |
| 2) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| ABOVE. |
| |
| |
| 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| RE-SUBMITTAL OF THE ABOVE. |
| |
| |
| PETER LEDUC |
| FIRE MARSHAL |
| 561-804-4709 |
| [email protected] |
| |