2021-09-11 12:08:11 | PLAN REVIEW / NFIP |
| |
| CHRISTOPHER S. THROOP, C.B.O., CFM |
| PLANS EXAMINER II PX3169/SFP306 |
| INSPECTOR BN4338 |
| BUILDING OFFICIAL BU1635 |
| ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935 |
| DEVELOPMENT SERVICES DEPARTMENT |
| CITY OF WEST PALM BEACH |
| (561) 805-6726 |
| [email protected] |
| |
| CODES IN EFFECT: |
| 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST |
| PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| CHAPTER 1 ADMINISTRATION |
| CITY ORDINANCE NO. 4658-16 |
| |
| 2ND REVIEW |
| |
| RESULTS: DENIED |
| ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| |
| 1. SECTION C2 (E) LOWEST ELEVATION OF MACHINERY OR |
| EQUIPMENT SERVICING THE BUILDING SHALL BE AT OR ABOVE |
| THE DESIGN FLOOD ELEVATION (DFE) OF 8.0' NAVD. |
| |
| 2. SECTION D-COMMENTS - THE INFORMATION PROVIDE IS NOT |
| RELEVANT. SEE BELOW FOR THE TYPICAL NOTES ENTERED IN |
| THE COMMENTS SECTION: |
| |
| 2A. PER EC INSTRUCTIONS FOR SECTION A5 - "THE METHOD |
| USED TO DETERMINE THE LATITUDE AND LONGITUDE WAS |
| OBTAINED USING GOOGLE EARTH" |
| |
| 2B. PER SECTION D COMMENTS "THE LOWEST ELEVATION OF |
| EQUIPMENT HVAC CU-1 AND CU-2 SHALL COMPLY WITH |
| SECTIONC2(E)" |
| |
| 2C. "THE TOP OF SLAB FOR THE PROPOSED GENERATOR ON SITE |
| PLAN A-0.1 SHALL COMPLY WITH SECTION C2(E)" |
| |
| TBD - SEE EC INSTRUCTIONS FOR SECTION A9.B-D FLOOD |
| OPENINGS "IF THE INTERIOR GRADE ELEVATION IS USED, NOTE |
| THIS IN THE COMMENTS SECTION" |
| |
| 3. PER EC INSTRUCTIONS FOR A9.B-D - ENGINEERED FLOOD |
| VENTS - PROVIDE A COPY OF THE INDIVIDUAL ENGINEERED |
| FLOOD OPENING CERTFICATION (PRODUCT APPROVAL) OR |
| PROVIDE A COPY OF THE EVALUATION REPORT FROM THE |
| INTERNATIONAL CODE COUNCIL EVALUATION SERVICE (ICC-ES). |
| |
| |
| NOTICE: |
| |
| PROPERTY IS LOCATED IN A SPECIAL FLOOD HAZARD AREA |
| (SFHA). IT IS LOCATED IN ZONE AE WITH BASE FLOOD |
| ELEVATIONS OF 6.0 FEET NAVD. DESIGN FLOOD ELEVATION |
| SHALL BE NOT LESS THAN 8.0 FEET NAVD. |
| |
| 3 ELEVATION CERTIFICATES (EC) ARE REQUIRED |
| |
| A CONSTRUCTION DRAWING ELEVATION CERTIFICATE IS |
| REQUIRED AT TIME OF PERMIT APPLICATION. |
| |
| A BUILDING UNDER CONSTRUCTION ELEVATION CERTIFICATE IS |
| REQUIRED AT PLACEMENT OF 1ST FLOOR. |
| SUBMIT TO BUILDING DEPARTMENT FOR REVIEW. |
| |
| A FINISHED CONSTRUCTION ELEVATION CERTIFICATE IS |
| REQUIRED AND SHALL BE SUBMITTED FOR REVIEW AND APPROVAL |
| PRIOR TO THE ISSUANCE OF THE CERTIFICATE OF OCCUPANCY. |
| NOTE: YOU MAY SUBMIT THIS EC FOR REVIEW AFTER FINAL |
| GRADE AND PLACEMENT OF EQUIPMENT SERVICING THE |
| BUILDING. |
| |
| |
| PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| |