Date |
Text |
2021-08-20 10:36:18 | 1) THE FLOORS AND WALL BASES OF THE TOILET ROOMS SHALL |
| COMPLY WITH FBC-BUILDING SEC. 1210.2.1.SHOW THE WALL |
| FINISH ON THE PLANS. EPOXY PAINT ON DRYWALL DOES NOT |
| COMPLY WITH THE CODE.2ND REQUEST. |
| 2) SHOW THE RESTROOM AND MOP SINK WALL FINISH ON THE |
| PLANS. THE WALL FINISH SHALL COMPLY WITH FBC-PLUMBING |
| SEC.1210.2.2. EPOXY PAINT ON DRYWALL DOES NOT COMPLY |
| WITH THE CODE. 2ND REQUEST. |
| 3) THE MIRROR IN THE TOILET ROOM SHALL BE MEASURED A |
| MAXIMUMOF 40 INCHES FROM THE FINISH FLOOR TO THE BOTTOM |
| OF THE REFLECTIVE SURFACE PER FBC-ACCESS. SEC.603.3. |
| 2ND REQUEST. |
| 4) SHT. A2.0 - DETAIL #8 - RECESSED SOAP DISPENSER - |
| THE OPERABLE PARTS SHALL BE WITHIN THE REACH RANGES PER |
| SEC. 308 OF FBC-ACCESS. SHOW THE HEIGHT ON THE DETAIL. |
| 2ND REQUEST. |
| 5) SHT. A2.0 - DETAIL #6 - THE OPERABLE PARTS OF THE |
| HCPT SHALL BE WITHIN THE REACH RANGES PER SEC. 308 OF |
| FBC-ACCESS. SHOW THE HEIGHT ON THE DETAIL. 2ND REQUEST. |
| 6) SHT. A2.0 - DETAIL #2 - THE TOILET PAPER DISPENSER |
| SHALL COMPLY WITH FBC-ACCESS. SEC. 309.4 AND SHALL BE 7 |
| INCHES MINIMUM AND 9 INCHES MAXIMUM IN FRONT OF THE |
| WATER CLOSET MEASURED TO THE CENTERLINE OF THE |
| DISPENSER ( NOT TO THE CENTER OF THE FIRST DISPENSER. |
| 2ND REQUEST. |
| 7) SHT. A2.0 - DETAIL #1 & DETAIL #2 - THE GRAB BAR |
| BEHIND THE WATER CLOSET IS SHOWN AS BEING MEASURED TO |
| THE CENTERLINE OF THE GRAB BAR FROM THE FINISH FLOOR |
| AND ALSO TO THE TOP OF THE BAR. THE GRAB BAR SHALL BE |
| MEASURED TO THE TOP OF THE GRIPPING SURFACE PER |
| FBC-ACCESS SEC. 609.4. 2ND REQUEST. |
| 8) SHT. A2.0 - DETAIL #1 - THE GRAB BAR BEHIND THE |
| WATER CLOSET SHALL BE LOCATED PER FBC-ACCESS. SEC. |
| 604.5.2 & FIGURE 604.5.2.SHOW THE DIMENSIONS ON THE |
| DETAIL. 2ND REQUEST. |
| 9) SUBMIT A SANITARY AND WATER RISER FOR REVIEW FOR THE |
| NEW PLUMBING WORK TO BE INSTALLED. WPB AMEND. TO FBC |
| SEC. 1107.3.5.1.3. |
| 10) SUBMIT A SLAB REPAIR DETAIL FOR REVIEW. SHOW THE |
| WIDTH OF THE REPAIR, THE MINIMUM THICKNESS OF THE |
| CONCRETE TO BE REPLACED, AND THE PSI OF THE CONCRETE. |
| SHOW THE SIZE AND LENGTH OF THE DOWELS, THE MINIMUM |
| EMBEDMENT DEPTH INTO THE EXISTING SLAB, THE ANCHORING |
| MATERIAL FOR THE DOWELS AND THE SPACING OF THE DOWELS |
| ON CENTER. THE REPAIR SHALL ALSO INCLUDE TERMITE |
| TREATMENT OF THE SOIL AND THE REQUIRED VAPOR BARRIER |
| OVER WELL COMPACTED SOIL. A COPY OF THE TERMITE |
| CERTIFICATE SHALL BE ONSITE FOR FINAL INSPECTION. |
| |
| |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| PLUMBING PLAN REVIEW |
| 561-805-6692 |
| [email protected] |
| |