2021-07-23 10:38:03 | 1) THE FLOORS AND WALL BASES OF THE TOILET ROOMS SHALL |
| COMPLY WITH FBC-BUILDING SEC. 1210.2.1.SHOW THE WALL |
| FINISH ON THE PLANS. EPOXY PAINT ON DRYWALL DOES NOT |
| COMPLY WITH THE CODE. |
| 2) SHOW THE RESTROOM AND MOP SINK WALL FINISH ON THE |
| PLANS. THE WALL FINISH SHALL COMPLY WITH FBC-PLUMBING |
| SEC.1210.2.2. EPOXY PAINT ON DRYWALL DOES NOT COMPLY |
| WITH THE CODE. |
| 3) THE MIRROR IN THE TOILET ROOM SHALL BE MEASURED A |
| MAXIMUMOF 40 INCHES FROM THE FINISH FLOOR TO THE BOTTOM |
| OF THE REFLECTIVE SURFACE PER FBC-ACCESS. SEC.603.3. |
| 4) SHT. A2.0 - DETAIL #8 - RECESSED SOAP DISPENSER - |
| THE OPERABLE PARTS SHALL BE WITHIN THE REACH RANGES PER |
| SEC. 308 OF FBC-ACCESS. SHOW THE HEIGHT ON THE DETAIL. |
| 5) SHT. A2.0 - DETAIL #6 - THE OPERABLE PARTS OF THE |
| HCPT SHALL BE WITHIN THE REACH RANGES PER SEC. 308 OF |
| FBC-ACCESS. SHOW THE HEIGHT ON THE DETAIL. |
| 6) SHT. A2.0 - THE TOILET PAPER DISPENSER SHALL COMPLY |
| WITH FBC-ACCESS. SEC. 309.4 AND SHALL BE 7 INCHES |
| MINIMUM AND 9 INCHES MAXIMUM IN FRONT OF THE WATER |
| CLOSET MEASURED TO THE CENTERLINE OF THE DISPENSER ( |
| NOT TO THE CENTER OF THE FIRST DISPENSER.) |
| 7) SHT. A2.0 - DETAIL #1 - THE GRAB BAR BEHIND THE |
| WATER CLOSET IS SHOWN AS BEING MEASURED TO THE |
| CENTERLINE OF THE GRAB BAR FROM THE FINISH FLOOR AND |
| ALSO TO THE TOP OF THE BAR. THE GRAB BAR SHALL BE |
| MEASURED TO THE TOP OF THE GRIPPING SURFACE PER |
| FBC-ACCESS SEC. 609.4. |
| 8) SHT. A2.0 - DETAIL #1 - THE GRAB BAR BEHIND THE |
| WATER CLOSET SHALL BE LOCATED PER FBC-ACCESS. SEC. |
| 604.5.2 & FIGURE 604.5.2.SHOW THE DIMENSIONS ON THE |
| DETAIL. |
| 9) SHT. A2.0 - THE PLANS REFERENCE DETAILS #1 & #2 ON |
| SHT. A2.1. THERE IS NO SHT. A2.1 IN THIS SUBMITTAL. |
| CLARIFY. |
| 10) SHOW THE INSIDE CLEAR DIMENSIONS OF THE TOILET |
| ROOMS AND ALSO OF THE CLEAR FLOOR SPACES FOR THE WATER |
| CLOSETS AND LAVATORIES.COMPLY WITH FBC-ACCESS. |
| SECS.604.3, 606.2. |
| 11) SHOW THE DISTANCE OF THE CENTERLINE WATER CLOSET |
| FROM THE ADJACENT WALL. COMPLY WITH FBC-ACCESS. |
| SEC.604.2. |
| 12) SUBMIT A SANITARY AND WATER RISER FOR REVIEW FOR |
| THE NEW PLUMBING WORK TO BE INSTALLED. WPB AMEND. TO |
| FBC SEC. 1107.3.5.1.3. |
| 13) SUBMIT A SLAB REPAIR DETAIL FOR REVIEW. SHOW THE |
| WIDTH OF THE REPAIR, THE MINIMUM THICKNESS OF THE |
| CONCRETE TO BE REPLACED, AND THE PSI OF THE CONCRETE. |
| SHOW THE SIZE AND LENGTH OF THE DOWELS, THE MINIMUM |
| EMBEDMENT DEPTH INTO THE EXISTING SLAB, THE ANCHORING |
| MATERIAL FOR THE DOWELS AND THE SPACING OF THE DOWELS |
| ON CENTER. THE REPAIR SHALL ALSO INCLUDE TERMITE |
| TREATMENT OF THE SOIL AND THE REQUIRED VAPOR BARRIER |
| OVER WELL COMPACTED SOIL. A COPY OF THE TERMITE |
| CERTIFICATE SHALL BE ONSITE FOR FINAL INSPECTION. |
| |
| |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| PLUMBING PLAN REVIEW |
| 561-805-6692 |
| [email protected] |
| |