Date |
Text |
2021-07-30 08:24:45 | PLAN |
| REVIEW COMMENTS |
| |
| 1ST REVIEW: FBC SEVENTH EDITION (2020) |
| ROBERT MCDOUGAL, CBO |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| (561) 805-6714 |
| [email protected] |
| |
| DENIED BY BUILDING |
| PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| |
| 1) THE PLANS SPECIFY THIS PROJECT AS BEING EXPOSURE |
| CATEGORY B. THE DEFAULT EXPOSURE CATEGORY IS C. DUE TO |
| THE OPEN AREAS OF THE GOLF COURSE, THE LAKES AND CANALS |
| THAT ARE IN CLOSE PROXIMITY TO THE PROJECT SHOULD BE |
| CONSIDERED EXPOSURE CATEGORY C. IF YOU DISAGREE, |
| PROVIDE AN ANALYSIS OF ALL OF THE WIND DIRECTIONS AT |
| THE PROJECT THAT WILL SUPPORT YOUR DETERMINATION. |
| FBC-R301.2.1.4 EXPOSURE CATEGORY |
| |
| 2) THE PRODUCT APPROVALS THAT WERE SUBMITTED FOR THE |
| HORIZONTAL ROLLING WINDOW AND THE SLIDING GLASS DOOR DO |
| NOT SHOW THAT THEY ARE IN COMPLIANCE WITH THE 2020 FBC. |
| THEY ARE ALSO REQUIRED TO BE APPROVED IN WRITING BY THE |
| DESIGNER OF RECORD. FBC AMEND. 107.3.4 - PROVIDE TWO |
| SETS OF PRODUCT APPROVALS FOR THOSE PRODUCTS WHICH ARE |
| REGULATED BY FAC 61G20-3.001 PER FLORIDA STATUTE |
| 553.842 (5) THAT HAVE BEEN REVIEWED AND APPROVED IN |
| WRITING BY THE DESIGNER OF RECORD. PROVIDE TWO COMPLETE |
| PRODUCT APPROVALS WITH FL OR NOA NUMBERS INCLUDING |
| INSTALLATION INSTRUCTIONS AND MAXIMUM DESIGN PRESSURES |
| FOR EACH OF THE DIFFERENT ROOFING MATERIALS, WINDOW |
| (GLASS TYPES), STRUCTURAL MULLIONS AND EXTERIOR DOOR |
| TYPES. THESE ITEMS CAN BE DEFERRED IF REQUESTED ON THE |
| PLANS, HOWEVER, THE DOCUMENTS MUST BE SUBMITTED AND |
| APPROVED BY THE BUILDING DEPARTMENT BEFORE THEY CAN BE |
| INSTALLED. ONLY ONE SET IS REQUIRED TO BE UPLOADED FOR |
| ELECTRONICALLY SUBMITTED DOCUMENTS. |
| |
| 3) SUBMIT PRODUCT APPROVALS FOR THE METAL ROOFING THAT |
| HAVE BEEN REVIEWED AND APPROVED BY THE DESIGNER OF |
| RECORD. FBC AMEND. 107.3.4 |
| |
| 4) SHOW COMPLIANCE WITH FBC-R806 FOR ROOF VENTILATION. |
| |
| 5) SPECIFY THE ROOF COMPONENT AND CLADDING PRESSURES ON |
| THE PLANS. R301.2.1 WIND DESIGN CRITERIA |
| |
| 6) PROVIDE A FLASHING DETAIL FOR NEW METAL ROOF TO THE |
| EXISTING GABLE WALL. FBC-R903.2 FLASHING |
| |
| 7) SUBMIT ENERGY CODE COMPLIANCE FORMS. FBC ENERGY |
| COMPLIANCE CHAPTER 4 [RE] RESIDENTIAL ENERGY EFFICIENCY |
| |
| 8) WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A |
| RESPONSE LETTER ADDRESSING EACH ITEM ALONG WITH THE |
| CITY RE-SUBMITTAL FORM. |
| |
| |
| |