Date Text
2021-07-19 14:08:33CHRISTOPHER S. THROOP, C.B.O., CFM
 PLANS EXAMINER II PX3169/SFP306
 INSPECTOR BN4338
 BUILDING OFFICIAL BU1635
 ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935
 DEVELOPMENT SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 (561) 805-6726
 [email protected]
  
 CODES IN EFFECT:
 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 2017 NEC
  
 1ST REVIEW
  
 RESULTS: DENIED
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
 1. PROVIDE SPECIFICATIONS FOR MAIN DRAINS PER FBC
 454.1.6.;5.10.2.
 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS
 SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH
 107.2.5.
  
 2. REF. PLAN PAGE P1.0 FOR THE FOLLOWING:
 CODE REFERENCES 454.1.3.1.2/.6 AND .9 ARE NOT PER
 CURRENT 2020 FBC. PLEASE UPDATE THESE CODE REFERENCES.
  
 3. PROVIDE SPECIFICATIONS THAT COMPLY WITH THE 2020 FBC
 FOR THE CHAIR LIFTS.
 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS
 SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH
 107.2.5.
  
 4. REF. PLAN PAGE P1.0 FOR THE FOLLWOING:
 PROVIDE STATEMENT THAT THE CHAIR LIFTS SHALL COMPLY
 WITH THE 2020 FBC SEC. 1009.2 THRU 1009.9.
  
 5. REF. PLAN PAGE P1.1 FOR THE FOLLWING:
 P1.1 & P1.2: A COMPLETE REVIEW OF THE REQUIRED PLUMBING
 FIXTURE COUNTS FOR THE DAY POOL AND SALT SPA CANNOT BE
 COMPLETED AT THIS TIME DUE TO A LACK OF INFORMATION ON
 THE PLANS- THE NUMBER OF PLUMBING FIXTURES HAS NOT BEEN
 CALCULATED BY THE SQUARE FOOTAGE AREAS OF THE POOL AND
 SPA AS REQUIRED BY TABLE 454.16.1 FBC B. BECAUSE
 RESTROOM FACILITIES FOR THE DAY POOL AND SALT SPA ARE
 BEING PROVIDED BY THE HOTEL BUILDING, PLEASE REVIEW THE
 EXCEPTION UNDER SECTION 454.1.6.1.1 FBC B AND PROVIDE:
 A) THE FIXTURE REQUIREMENT FOR THE BUILDING. IF IT
 EXCEEDS THE REQUIREMENT IN TABLE 454.1.6.1 THEN THE
 BUILDING REQUIREMENT SHALL REGULATE THE FIXTURE COUNT,
 OTHERWISE THE FIXTURE COUNT SHALL BE BASED ON THE
 REQUIREMENT FOR THE POOL. UNDER NO CIRCUMSTANCES SHALL
 THE FIXTURE COUNTS BE CUMULATIVE. B) WOMEN'S RESTROOMS
 SHALL HAVE A RATIO OF THREE TO TWO WATER CLOSETS
 PROVIDED FOR WOMEN AS THE COMBINED TOTAL OF WATER
 CLOSETS AND URINALS PROVIDED FOR MEN. LAVATORY COUNTS
 SHALL BE EQUAL.
 A COMPLETE ACCESSIBILITY REVIEW CANNOT BE PERFORMED AT
 THIS TIME. PROVIDE COMPLETE ADA SPECIFICATIONS FOR
 SANITARY FACILITIES PER FBC ACCESS. CHPT. 6.
  
 6. REF. PLAN PAGE P1.3 FOR THE FOLLOWING:
 DECK DRAINS APPEAR TO BE MISSING FOR THE DAY SPA AND
 SALT SPA PER FBC 454.1.3.1.2.
 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS
 SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH
 107.2.5.
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 WHEN RESUBMITING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
  
2021-07-19 14:05:23PLAN REVIEW BUILDING
  
 CHRISTOPHER S. THROOP, C.B.O., CFM
 PLANS EXAMINER II PX3169/SFP306
 INSPECTOR BN4338
 BUILDING OFFICIAL BU1635
 ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935
 DEVELOPMENT SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 (561) 805-6726
 [email protected]
  
 CODES IN EFFECT:
 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 2017 NEC
  
 1ST REVIEW
  
 RESULTS: DENIED
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
 1. PROVIDE SPECIFICATIONS FOR MAIN DRAINS PER FBC
 454.1.6.;5.10.2.
 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS
 SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH
 107.2.5.
  
 2. REF. PLAN PAGE P1.0 FOR THE FOLLOWING:
 CODE REFERENCES 454.1.3.1.2/.6 AND .9 ARE NOT PER
 CURRENT 2020 FBC. PLEASE UPDATE THESE CODE REFERENCES.
  
 3. PROVIDE SPECIFICATIONS THAT COMPLY WITH THE 2020 FBC
 FOR THE CHAIR LIFTS.
 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS
 SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH
 107.2.5.
  
 4. REF. PLAN PAGE P1.0 FOR THE FOLLWOING:
 PROVIDE STATEMENT THAT THE CHAIR LIFTS SHALL COMPLY
 WITH THE 2020 FBC SEC. 1009.2 THRU 1009.9.
  
 5. REF. PLAN PAGE P1.1 FOR THE FOLLWING:
 PLUMBING FACILITIES APPEAR TO NOT COMPLY WTH TABLE
 454.1.6.1. WOMEN'S WATER CLOSETS SHALL BE AT A RATIO OF
 3 TO 2 FOR MEN'S WATER CLOSETS AND URINALS COMBINED. A
 COMPLETE ACCESSIBILITY REVIEW CANNOT BE PERFORMED AT
 THIS TIME. PROVIDE COMPLETE ADA SPECIFICATIONS FOR
 SANITARY FACILITIES PER FBC ACCESS. CHPT. 6.
  
 6. REF. PLAN PAGE P1.2 FOR THE FOLLOWING:
 IDENTIFY LOCATION OF THE DAY SPA AND SALT SPA.
 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS
 SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH
 107.2.5.
  
 7. REF. PLAN PAGE P1.2 FOR THE FOLLOWING:
 DECK DRAINS APPEAR TO BE MISSING AT THE ADULT POOL PER
 FBC 454.1.3.1.2.
  
 8. GUTTER SPECIFICATIONS:
 GUTTER SPECS ON PG. AP2.0 SPECIFIES A PENTAIR MODEL
 GUTTER. DETAIL ON PG. AP2.2 SHOWS A HAYWARD MODEL OF
 GUTTER.
 PLEASE CLARIFY.
 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS
 SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH
 107.2.5.
  
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 WHEN RESUBMITING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved