Date |
Text |
2022-01-06 10:58:32 | BUILDING PLAN REVIEW |
| |
| CHRISTOPHER S. THROOP, C.B.O., CFM |
| PLANS EXAMINER II PX3169/SFP306 |
| INSPECTOR BN4338 |
| BUILDING OFFICIAL BU1635 |
| ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935 |
| DEVELOPMENT SERVICES DEPARTMENT |
| CITY OF WEST PALM BEACH |
| (561) 805-6726 |
| [email protected] |
| |
| CODES IN EFFECT: |
| 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST |
| PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| CHAPTER 1 ADMINISTRATION |
| NFPA 70 2017 EDITION NEC 2017 |
| |
| 2ND REVIEW |
| |
| RESULTS: DENIED |
| ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| |
| NOTICE: CHANGE IN SOW. DEMO EXISTING STRUCTURE. BUILD |
| NEW SFR. |
| |
| 1. A SEPERATE DEMO PERMIT IS REQUIRED. SUBMIT DEMO |
| APPLICATION TO [email protected] |
| |
| DEMO CHECKLIST: |
| |
| THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A |
| DEMO PERMIT PER FLORIDA BUILDING CODE, BUILDING 3303: |
| |
| 1. UTILITY RELEASE - FLORIDA POWER & LIGHT (ELECTRIC) |
| RELEASE OF SERVICE CONFIRMATION |
| |
| 2. UTILITY RELEASE - FLORIDA PUBLIC UTILITIES (GAS) |
| RELEASE OF SERVICE CONFIRMATION |
| |
| 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER |
| DEPARTMENT, REQUEST FOR METER PULL, ON THEIR FORM |
| "DEMOLITION APPLICATION" |
| |
| HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B |
| UILDING-PERMIT-FORMS |
| |
| IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED, |
| THEN A PARTIAL RELEASE WILL BE NOTED ON THEIR FORM. |
| |
| 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT |
| APPLICATION TO BUILDING DIVISION); SCHEDULE A FINAL |
| PLUMBING INSPECTION #703. |
| |
| 5. EXTERMINATION LETTER - LETTER FROM A LICENSED PEST |
| CONTROL COMPANY STATING THAT DEMOLITION ADDRESS HAS |
| BEEN INSPECTED AND/OR TREATED FOR RODENTS. |
| |
| 6. COMPLETE THE DEMO DEBRIS FORM: |
| |
| HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B |
| UILDING-PERMIT-FORMS |
| |
| 7. PROVIDE A SITE PLAN OR SURVEY SHOWING LOCATION OF |
| THE STRUCTURE(S) TO BE DEMOLISHED, FBC 107. |
| |
| 8.PROVIDE A STORMWATER POLLUTION PREVENTION PLAN. |
| YOU MAY USE THE SURVEY. SHOW SILT FENCEING OR OTHER |
| APPROVED METHODS |
| |
| 9.ASBESTOS |
| |
| PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE CONTRACTOR, |
| ON LETTERHEAD, STATING THAT: |
| |
| THE INSTRUCTIONS ON THE WEBSITE OF THE ASBESTOS PROGRAM |
| COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH |
| COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE |
| GIVEN TIMELY. |
| |
| ADDITIONAL INFORMATION REGARDING ASBESTOS REQUIREMENTS |
| CAN BE FOUND ON THEIR WEBSITE: |
| |
| HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE |
| S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- |
| RENOVATION.HTML |
| |
| |
| COMMENTS FOR NEW SFR: |
| |
| NOTICE: VALUE HAS BEEN ADJUSTED TO $142,974.00 PER THE |
| ICC BUILDING VALUATION DATA. |
| |
| 1. PROVIDE A SITE DRAINAGE PLAN WITH A BOUNDRY LINE |
| SURVEY PER FBC R401.3 |
| IT SHALL BE DRAWN IN ACCORDANCE WITH AN ACCURATE AND |
| INCLUDED BOUNDARY LINE SURVEY. |
| FBC R401.3 SITE DRAINAGE |
| SURFACE DRAINAGE SHALL BE DIVERTED TO A STORM SEWER |
| CONVEYANCE OR OTHER APPROVED POINT OF COLLECTION THAT |
| DOES NOT CREATE A HAZARD. |
| LOTS SHALL BE GRADED TO DRAIN SURFACE WATER AWAY FROM |
| FOUNDATION WALLS. THE GRADE SHALL FALL A MINIMUM OF 6 |
| INCHES WITHIN THE FIRST 10 FEET. |
| |
| |
| 2. PROVIDE THE FINISHED FLOOR ELEVATION |
| R403.1.7.3 FOUNDATION ELEVATION. |
| ON GRADED SITES, THE TOP OF ANY EXTERIOR FOUNDATION |
| SHALL EXTEND ABOVE THE ELEVATION OF THE STREET GUTTER |
| AT POINT OF DISCHARGE OR THE INLET OF AN APPROVED |
| DRAINAGE DEVICE A MINIMUM OF 12 INCHES (305 MM) PLUS 2 |
| PERCENT. ALTERNATE ELEVATIONS ARE PERMITTED SUBJECT TO |
| THE APPROVAL OF THE BUILDING OFFICIAL, PROVIDED IT CAN |
| BE DEMONSTRATED THAT REQUIRED DRAINAGE TO THE POINT OF |
| DISCHARGE AND AWAY FROM THE STRUCTURE IS PROVIDED AT |
| ALL LOCATIONS ON THE SITE. |
| FINISHED FLOOR ELEVATIONS SHALL BE PLACED ON FOUNDATION |
| PLAN AND/OR FLOOR PLAN. |
| |
| PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| |
| |
| |
| |
| |
| |
| |
| |