Plan Review Notes
Plan Review Notes For Permit 21060222
Permit Number 21060222
Review Stop P
Sequence Number 1
Notes
Date Text
2021-07-14 08:08:52PLAN REVIEW PLUMBING FUEL GAS
  
 CHRISTOPHER S. THROOP, C.B.O., CFM
 PLANS EXAMINER II PX3169/SFP306
 INSPECTOR BN4338
 BUILDING OFFICIAL BU1635
 ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935
 DEVELOPMENT SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 (561) 805-6726
 [email protected]
  
 CODES IN EFFECT:
 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 2017 NEC
  
 1ST REVIEW
  
 RESULTS: DENIED
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
 1. PROVIDE A PLUMBING PLAN. WATER HEATER REMOVED ON
 DEMO PLAN.
 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS
 SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH
 107.2.5.
  
  
 2. PROVIDE SOURCE OF HOT WATER.
 PLEASE PROVIDE THE SOURCE OF HOT WATER PER THE WPB
 AMENDMENTS TO THE FBC SEC. 107.2.1. INFORMATION ON
 CONSTRUCTION DOCUMENTS.
 P2804.1RELIEF VALVES REQUIRED. SECTION P2801.1 FBC RES.
 APPLIANCES AND EQUIPMENT USED FOR HEATING WATER OR
 STORING HOT WATER SHALL BE PROTECTED BY ONE OF THE
 FOLLOWING:
 1. 1.A SEPARATE PRESSURE-RELIEF VALVE AND A SEPARATE
 TEMPERATURE-RELIEF VALVE.
 2. 2.A COMBINATION PRESSURE-AND-TEMPERATURE RELIEF
 VALVE.
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved