Date |
Text |
2021-09-14 14:29:58 | NEW 2 STORY OFFICE/ CAFE BUILDING |
| REVIEWED BY ROGER MCPHERSON |
| 561-805-6716 |
| [email protected]. |
| CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| AMENDMENT |
| |
| CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 |
| 1) REVISED DRAWINGS LOADED TO PROJECTDOX SHOULD BE |
| NAMED THE SAME IN PROJECTDOX AS THE PREVIOUS DRAWING SO |
| THAT THE NEW REVISED DRAWING WILL OVERLAP AND BECOME |
| (V2, 3, 4 ETC) - PLEASE CONTACT THE |
| [email protected] TO HELP YOU WITH THE CORRECT |
| UPLOADING TO PROJECTDOX. SAVES TIME FOR THE PLAN REVIEW |
| AND PREVENTS OLD DRAWINGS FROM GETTING APPROVED. |
| 2) PLEASE PROVIDE COMPLETE COPIES OF THE PRODUCT |
| APPROVALS FOR THE EXTERIOR WINDOWS, DOORS, ROOFING |
| SYSTEMS, ETC. - ALL PRODUCT APPROVALS NEED TO BE |
| REVIEWED AND MARKED APPROVED BY THE BUILDING DESIGNER |
| OF RECORD OR BE LISTED ON THE DRAWINGS BY THE PRODUCT |
| APPROVAL NUMBER. FBC WPB 107.2.1 |
| 3) PLEASE SHOW THE RESTROOM WALL FINISH TO COMPLY WITH |
| FBC 1210.2.2 (DRYWALL IS NOT CONSIDERED A HARD |
| SURFACE). |
| 4) PLEASE PROVIDE DETAILS FOR THE ROOF TOP CANOPY, |
| ALUMINUM CANOPY, GUARD RAILS, TILT WALL PANELS, FAUX |
| WOOD ROOF DECK, SOLAR PANELS, ROOF TOP EQUIPMENT |
| SCREENING ETC - PLEASE LIST THESE ITEMS ON THE DRAWINGS |
| AS TO BE DEFERRED PER 107.3.4.1 |
| 5) SEPARATE PERMIT WILL BE REQUIRED FOR PARKING LOT, |
| DUMPSTER ENCLOSURE, SIGNS, GENERATOR, FENCE. - PLEASE |
| ACKNOWLEDGE THIS. |
| 6) DRAWINGS A4.04 AND A4.03 ACCESSIBLE RESTROOM FLOOR |
| PLAN NEEDS TO SHOW THE GRAB BARS. |
| 7) 107.3.4.1 DEFERRED SUBMITTALS. FOR THE PURPOSES OF |
| THIS SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE |
| PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE |
| TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO |
| THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. |
| DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR |
| APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED |
| DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST |
| THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS |
| FOR REVIEW BY THE BUILDING OFFICIAL. DOCUMENTS FOR |
| DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE |
| REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| WHO SHALL REVIEW THEM AND FORWARD THEM TO THE BUILDING |
| OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED |
| SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE |
| IN GENERAL CONFORMANCE TO THE DESIGN OF THE BUILDING. |
| THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED |
| UNTIL THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN |
| APPROVED BY THE BUILDING OFFICIAL. |
| |
| |