2021-07-15 12:18:57 | NEW 2 STORY OFFICE/ CAFE BUILDING |
| REVIEWED BY ROGER MCPHERSON |
| 561-805-6716 |
| [email protected]. |
| CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| AMENDMENT |
| |
| CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 |
| 1) OCCUPANCY CLASSIFICATION SHOULD BE SHOWN AS MIXED |
| B/A2 FBC CHAPTER 3 |
| 2) PLEASE SHOW THE ACCESSIBLE PATH AND SEATING IN THE |
| CAFE AND EXTERIOR GARDEN AREA TO COMPLY WITH FBC |
| A206.2.2 AND 226.1 |
| 3) PLEASE PROVIDE COMPLETE COPIES OF THE PRODUCT |
| APPROVALS FOR THE EXTERIOR WINDOWS, DOORS, ROOFING |
| SYSTEMS, ETC. - ALL PRODUCT APPROVALS NEED TO BE |
| REVIEWED AND MARKED APPROVED BY THE BUILDING DESIGNER |
| OF RECORD OR BE LISTED ON THE DRAWINGS BY THE PRODUCT |
| APPROVAL NUMBER. FBC WPB 107.2.1 |
| 4) PLEASE SHOW THE RESTROOM WALL FINISH TO COMPLY WITH |
| FBC 1210.2.2 (DRYWALL IS NOT CONSIDERED A HARD |
| SURFACE). |
| 5) DRAWING A4.04 RESTROOM SHOWS A PARTITION IN FRONT OF |
| THE TOILET ROOM AND NO DOOR - PLEASE SHOW DOOR |
| LOCATION. |
| 6) DRAWING A4.11 - LEVEL 1 ENLARGED PLAN @ WEST STAIR - |
| NEEDS TO SHOW HAND RAILS ON BOTH SIDES OF THE STAIRS - |
| FBC 1011.11 |
| 7) DRAWING A1.01 - SITE DATA - SHOULD SAY 4 ACCESSIBLE |
| PARKING SPACES. FBC ACCESSIBILITY TABLE 208.2 |
| 8) DRAWING A5.02 - METAL PAN STAIR- SHOULD SHOW THE |
| BOTTOM SLOPING HAND RAIL TO CONTINUE 11" PER FBC 1014.6 |
| 9) THE LIFE SAFETY PLANS SHOW FIRE WALLS AT STAIRWAYS/ |
| ELEVATOR AND "COMMUNITY BOARD RM" THE WALL DESIGNATIONS |
| ON THE CONSTRUCTION PLANS DOES NOT SHOW FIRE RATED |
| WALLS - PLEASE CLARIFY. |
| 10) DRAWING S-0.00 SHOWS WIND DATA - EXPOSURE "C" USED |
| - BEING NEAR THE LAKE MANGONIA IT APPEARS THAT EXPOSURE |
| "D" SHOULD BE USED PER FBC 1609.4.3 |
| 11) PLEASE SHOW THAT TERMITE PROTECTION IS REQUIRED PER |
| FBC 1816 |
| 12) PLEASE PROVIDE DETAILS FOR THE ROOF TOP CANOPY, |
| ALUMINUM CANOPY, GUARD RAILS, TILT WALL PANELS FAUX |
| WOOD ROOF DECK. |
| 13) SEPARATE PERMIT WILL BE REQUIRED FOR PARKING LOT, |
| DUMPSTER ENCLOSURE, SIGNS, GENERATOR, FENCE. |
| 14) 107.3.4.1 DEFERRED SUBMITTALS. FOR THE PURPOSES OF |
| THIS SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE |
| PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE |
| TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO |
| THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. |
| DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR |
| APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED |
| DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST |
| THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS |
| FOR REVIEW BY THE BUILDING OFFICIAL. DOCUMENTS FOR |
| DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE |
| REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| WHO SHALL REVIEW THEM AND FORWARD THEM TO THE BUILDING |
| OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED |
| SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE |
| IN GENERAL CONFORMANCE TO THE DESIGN OF THE BUILDING. |
| THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED |
| UNTIL THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN |
| APPROVED BY THE BUILDING OFFICIAL. |
| |
| |