2021-06-30 17:11:14RESIDENTIAL (R3) ADDITION, BUILDING REVIEW COMMENTS
 CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS.
 PERMIT #21050513
  
 1-PROVIDE ENERGY CALCULATIONS AS REQUIRED BY SEC. 606
 FBC-EXISTING BUILDING AND SEC. R101.5 FBC-ENERGY
 CONSERVATION.
 NOTE: PLEASE MAKE SURE FORRMS ARE PROPERLY SIGNED BY
 ALL REQUIRED PARTIES AND IS COORDINATED WITH PLANS TO
 AVOID CONFLICTS/DELAYS.
  
 2- LOT DRAINAGE (SEC. 606 FBC-EXISTING BUILDING)
 PROVIDE DRAINAGE PLAN SHOWING COMPLIANCE WITH THE
 FOLLOWING:
 R401.3 FBC-RESIDENTIAL.
 SEC. 107.2.5 CITY AMENDMENTS.
 SEC. 110.9 CITY AMENDMENTS.
  
 3-PROVIDE SITE PLAN SHOWING THE LOCATION OF NEW
 CONSTRUCTION AND EXISTING STRUCTURES ON THE SITE AND
 DISTANCES FROM LOT LINES. SITE PLAN TO BE DRAWN IN
 ACCORDANCE WITH AN ACCURATE AND INCLUDED ON A BOUNDARY
 LINE SURVEY.
 SEC. 606 FBC-EXISTING BUILDING. SEC. 107.2.5 CITY
 AMENDMENTS.
  
 4- SHEET S1.1:
 (A)PARTIAL FLOOR PLAN: PROVIDE LAYOUT OF ROOMS ADJACENT
 TO THE PROPOSED ADDITION. NEED THIS TO VERIFY IF THERE
 ARE BEDROOMS ADJACENT TO THE ADDITION AND EXISTING
 EGRESS REQUIREMENTS ARE NOT CHANGED OR BLOCKED.
 SEC. 606 FBC-EXISTING BUILDING. SEC. 107.3.5.3 CITY
 AMENDMENTS.
  
 (B)PARCEL CONTROL NUMBER SHOWN UNDER DATA GATHERED FROM
 PAPA IS INCORRECT. REVISE AS REQUIRED.
 SEC. 107.2.1 CITY AMENDMENTS.
  
 (C)REVISE DESIGN CRITERIA: WIND EXPOSURE DOESN'T MATCH
 WIND EXPOSURE IN TRUSS NOTE #1 ON SHEET S1.2. REVISE AS
 REQUIRED.
 SEC. 606 FBC-EXISTING BUILDING. SEC. 107.2.1 CITY
 AMENDMENTS.
  
 (D)DESIGN CRITERIA SPECIFIES: FULLY OPEN DESIGN AND
 INTERNAL PRESSURE COEFFICIENT = N/A. THIS BUILDING IS
 NOT OPEN. REVISE AS REQUIRED.
 SEC. 606 FBC-EXISTING BUILDING. SEC. R301.2.1
 FBC-RESIDENTIAL.
  
 (E)REVISE BUILDING CATEGORY. THIS BUILDING IS NOT
 CATEGORY I. IT IS CATEGORY II. SEE SEC. 1604.5
 FBC-BUILDING.
 SEC. 606 FBC-EXISTING BUILDING.
  
 (F) FOUNDATION PLAN DOESN'T PROVIDE SPECIFICATIONS FOR
 CONCRETE SLAB. PROVIDE COMPLETE SPECIFICATIONS. FOOTING
 SIZE, REINFORCEMENT, VAPOR BARRIER, ETC.
 SEC. 606 FBC-EXISTING BUILDING. SEC. 107.3.5.3 CITY
 AMENDMENTS.
  
 (G)WALL SECTION AND EXTERIOR ELEVATIONS DON'T SPECIFY
 THE ROOF PITCH.
 PROVIDE INFORMATION.
 SEC. 606 FBC-EXISTING BUILDING. SEC. R905.2
 FBC-RESIDENTIAL.
  
 (H) WINDOW AND DOOR SCHEDULE. CLEARLY SPECIFY THE
 DESIGN PRESSURES FOR ALL DOORS AND WINDOWS. MISSING
 SOME. REVISE/UPDATE PRODUCT APPROVALS NUMBERS. SOME ARE
 EXPIRED.
 SEC. 606 FBC-EXISTING BUILDING. SEC. R301.2.1
 FBC-RESIDENTIAL.
  
 (I)WALL SECTION: SPECIFY ROOFING UNDERLAYMENT SHOWING
 COMPLIANCE WITH ANY OF THE OPTIONS OF SEC. R905.1.1.1
 FBC-RESIDENTIAL.
 SEC. 606 FBC-EXISTING BUILDING.
  
 (J)WALL SECTION TO PROVIDE COMPLETE INFORMATION FOR
 SOFFIT CONSTRUCTION.
 SEC. 606 FBC-EXISTING BUILDING. SEC. R703.1.2.1
 FBC-RESIDENTIAL.
  
 (K)WALL SECTION TO PROVIDE COMPLETE INFORMATION FOR
 ATTIC VENT.
 SEC. 606 FBC-EXISTING BUILDING. SEC. R806
 FBC-RESIDENTIAL.
  
 (L)REVISE MASONRY BUCK DETAIL. BEVELED BUCKS ARE NOT
 ALLOWED. 2X4 BUCKS DON'T PROVIDE FULL SUPPORT TO THE
 DOOR FRAME AS REQUIRED BY R609.7.2.1 FBC-RESIDENTIAL.
 REVISE AS REQUIRED.
 SEC. 606 FBC-EXISTING BUILDING.
  
 5- PROVIDE COMPLETE INFORMATION FOR ATTACHMENT OF
 PROPOSED ADDITION TO EXISTING STRUCTURE AT WALLS AND
 ROOFING AREAS.
 SEC. 606 FBC-EXISTING BUILDING. SEC. R301.1
 FBC-RESIDENTIAL.
  
 6- CLARIFY SHEET S1.2:
 PROVIDE COMPLETE DETAILS AND SPECIFICATIONS FOR GABLE
 END CONSTRUCTION. IS THERE A RAKED BEAM?. IF SO,
 PROVIDE SPECS. SHOW BEAM IN THE ROOF FRAMING PLAN.
 SEC. 606 FBC-EXISTING BUILDING. SEC. R301.2.1
 FBC-RESIDENTIAL.
  
 7-PROVIDE PRODUCT APPROVAL AS REQUIRED BY FAC
 61G20-3.001 FOR
 (NOTE: THIS MAY BE SUBMITTED LATER AS A DEFERRED
 SUBMITTAL. PROVIDE COMPLETE INFORMATION PRIOR TO
 INSTALLATION TO AVOID CONFLICTS/DELAYS. ALL PRODUCT
 APPROVALS NEED TO BE APPROVED IN WRITING BY DESIGNER OF
 RECORD PRIOR TO SUBMITTAL):
 A)EXTERIOR DOORS.
 B)WINDOWS.
 C)HURRICANE SHUTTERS IF DOORS AND WINDOWS DON'T HAVE
 IMPACT GLAZING. AND, PROVIDE COMPLETE INSTALLATION
 SCHEDULE. SEE CITY SAMPLE.
 D)SHINGLES.
 E)ROOFING UNDERLAYMENT SPECIFIED ON TWO STORY WALL
 SECTION.
  
 WHEN RESUBMITTING, A TRANSMITTAL LETTER LISTING THE
 ORIGINAL REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF
 THE REVISION MADE, IDENTIFYING THE SHEET OR
 SPECIFICATION PAGE WHERE THE CHANGES CAN BE FOUND WILL
 HELP TO EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR
 ANTICIPATED COOPERATION.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved