Date |
Text |
2021-06-29 11:34:56 | UTILITY BUILDING |
| REVIEWED BY ROGER MCPHERSON |
| 561-805-6716 |
| [email protected]. |
| CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| AMENDMENT |
| |
| CORRECTIONS NEEDED - |
| 1) PLEASE SHOW THE ROOF SHEATHING ATTACHMENT (NAILING |
| SIZE AND TYPE) FBC 2304.10.1 |
| 2) PRODUCT APPROVAL PROVIDED FOR THE SKY LIGHT DOES NOT |
| MEET THE REQUIRED WIND DESIGN PRESSURES SHOWN ON |
| DRAWING A-3. |
| 3) PRODUCT APPROVAL PROVIDED FOR THE SWING DOOR DOES |
| NOT MEET THE REQUIRED WIND DESIGN PRESSURES SHOWN ON |
| DRAWING A-3. |
| 4) PRODUCT APPROVAL PROVIDED FOR THE OVERHEAD DOOR DOES |
| NOT MEET THE REQUIRED WIND DESIGN PRESSURES SHOWN ON |
| DRAWING A-3. |
| 5) THE INSTALLATION DRAWINGS FOR THE SWING DOOR |
| (DRAWING NUMBER D015726) IS NOT PART OF THE PRODUCT |
| APPROVAL (FRONT PAGE PROVIDED FL16708 R13) - PLEASE |
| PROVIDE A COMPLETE PRODUCT APPROVAL FOR THE SWING DOOR. |
| 6) PRODUCT APPROVAL (FL14672-R6) FOR THE FLAT DECK |
| ROOFING = NEED TO CHOOSE A ROOFING SYSTEM IN THE |
| PRODUCT APPROVAL INSTALLATION INSTRUCTIONS THAT SHOWS |
| THE REQUIRED WIND DESIGN PRESSURE AS SHOWN ON DRAWING |
| (A-3) - PLEASE CIRCLE THE ROOFING SYSTEM TO BE USED IN |
| THE PRODUCT APPROVAL - IF NEEDED PLEASE PROVIDE |
| ADDITIONAL ATTACHMENT DETAILS FROM AN ARCHITECT OR |
| ENGINEER FOR THE ROOF ZONES 2 AND 3 WHICH MAY REQUIRE A |
| HIGHER WIND PRESSURE THEN THE CHOSEN ROOFING SYSTEM - |
| SEE NOTES ON THE PRODUCT APPROVAL. |
| 7) PLEASE PROVIDE A PRODUCT APPROVAL FOR THE WINDOWS, |
| LOUVERS OR SHUTTERS - DRAWINGS NEED TO SAY WHETHER THE |
| SIDE OPENINGS ARE WINDOWS, LOUVERS OR SHUTTERS. |
| 8) ROOFING SYSTEM AND WINDOW AND DOOR PRODUCT APPROVALS |
| MAY BE DEFERRED SUBMITTALS BY LISTING ITEMS TO BE |
| DEFERRED ON THE CONSTRUCTION DOCUMENTS - 107.3.4.1 |
| DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, |
| DEFERRED SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF |
| THE DESIGN THAT ARE NOT SUBMITTED AT THE TIME OF THE |
| APPLICATION AND THAT ARE TO BE SUBMITTED TO THE |
| BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL |
| OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF |
| THE BUILDING OFFICIAL. THE REGISTERED DESIGN |
| PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE |
| DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR |
| REVIEW BY THE BUILDING OFFICIAL. DOCUMENTS FOR DEFERRED |
| SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE REGISTERED |
| DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL |
| REVIEW THEM AND FORWARD THEM TO THE BUILDING OFFICIAL |
| WITH A NOTATION INDICATING THAT THE DEFERRED SUBMITTAL |
| DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL |
| CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED |
| SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE |
| DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE |
| BUILDING OFFICIAL. |