2021-05-21 13:06:49 | 05/21/21 2ND GAS REVIEW**DENIED** WITH COMMENTS |
| |
| NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| |
| 1. SECOND REQUEST; THE ADDRESS FOR THIS STRUCTURE HAS |
| NO CHANGE OF OCCUPANCY IN THE CITY RECORDS AND NO |
| BUILDING PERMIT ON FILE. ANY OWNER OR AGENT AUTHORIZED |
| IN ACCORDANCE WITH FLORIDA STATUTE 489 WHO INTENDS TO |
| CONSTRUCT, ENLARGE, ALTER, REPAIR, MOVE, DEMOLISH, OR |
| CHANGE THE OCCUPANCY OF A BUILDING OR STRUCTURE, OR TO |
| ERECT, INSTALL, ENLARGE, ALTER, REPAIR, REMOVE, CONVERT |
| OR REPLACE ANY IMPACT-RESISTANT COVERINGS, ELECTRICAL, |
| GAS, MECHANICAL, PLUMBING OR FIRE PROTECTION SYSTEM, OR |
| ACCESSIBLE OR FLOOD-RESISTANT SITE ELEMENT, THE |
| INSTALLATION OF WHICH IS REGULATED BY THIS CODE, OR TO |
| CAUSE ANY SUCH WORK TO BE DONE, SHALL FIRST MAKE |
| APPLICATION TO THE BUILDING OFFICIAL AND OBTAIN THE |
| REQUIRED PERMIT PER THE WPB AMENDMENTS TO THE FBC SEC. |
| 105.1. |
| |
| 2. SECOND REQUEST; PLEASE PROVIDE A DESCRIPTIVE SCOPE |
| OF WORK THAT WILL BE PERFORMED ON THE PLANS, LIST |
| FIXTURE APPURTENANCES BEING INSTALLED, AND THE EXTENT |
| OF WORK YOU ARE DOING PER THE WPB AMENDMENTS TO THE FBC |
| SEC. 101.2 SCOPE. |
| |
| 3. SECOND REQUEST; THE CLAIMED VALUE APPEARS TO BE |
| UNDERESTIMATED ON THE APPLICATION. PLEASE PROVIDE A |
| BONA FIDE SIGNED CONTRACT PER THE WPB AMENDMENTS TO THE |
| FBC SEC. 109.3 BUILDING PERMIT VALUATIONS. IF, IN THE |
| OPINION OF THE BUILDING OFFICIAL, THE CLAIMED VALUATION |
| OF THE BUILDING, ALTERATION, STRUCTURE, ELECTRICAL, |
| GAS, MECHANICAL, OR PLUMBING SYSTEMS APPEARS TO BE |
| UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE |
| DENIED UNLESS THE APPLICANT CAN SHOW DETAILED, QUANTITY |
| ESTIMATES, AND/OR BONA FIDE SIGNED CONTRACTS (EXCLUDING |
| LAND VALUE) TO MEET THE APPROVAL OF THE BUILDING |
| OFFICIAL. FOR PERMITTING PURPOSES, THE VALUATION OF |
| BUILDINGS AND SYSTEMS SHALL BE TOTAL REPLACEMENT VALUE |
| TO INCLUDE STRUCTURAL, ELECTRIC, PLUMBING, MECHANICAL, |
| INTERIOR FINISH, RELATIVE SITE WORK, ARCHITECTURAL AND |
| DESIGN FEES, MARKETING COSTS, OVERHEAD, AND PROFIT, |
| EXCLUDING ONLY LAND VALUE. VALUATION REFERENCES MAY |
| INCLUDE THE LATEST PUBLISHED DATA OF NATIONAL |
| CONSTRUCTION COST ANALYSIS SERVICES (MARSHALL-SWIFT, |
| MEANS, ETC.), AS PUBLISHED BY INTERNATIONAL CODE |
| CONGRESS. THE BUILDING OFFICIAL SHALL SET THE FINAL |
| BUILDING PERMIT VALUATION. |
| |
| 4. PLEASE SHOW EMERGENCY HOOD SHUT DOWN SHUTOFF VALVE |
| AND IT SHALL BE BELOW THE CEILING. THE MANUAL SHUTOFF |
| VALVE SHALL BE UPSTREAM. UNION TO BE DOWNSTREAM OF |
| MANUAL VALVE. SECS. 10.4, 10.5 OF NFPA 96-08. AT LEAST |
| ONE MANUAL ACTUATION DEVICE SHALL BE LOCATED A MINIMUM |
| OF 3 M (10 FT) AND A MAXIMUM OF 6 M (20 FT) FROM THE |
| PROTECTED HOOD EXHAUST SYSTEM(S) WITHIN A PATH OF |
| EGRESS OR AT AN ALTERNATIVE LOCATION ACCEPTABLE TO THE |
| AHJ. |
| |
| 5. SECOND REQUEST; PLEASE SUBMIT AN ISOMETRIC DRAWING |
| THAT CLEARLY SHOWS THE LENGTH OF ALL CUT SECTIONS OF |
| PIPE PER 2020 FBC FG SECS. 402.4.1, 402.4.2. |
| |
| 6. SECOND REQUEST; SHOW THE TYPE OF PIPE MATERIAL BEING |
| INSTALLED, ALL PIPE SIZES, AND THE CORRESPONDING EHD |
| NUMBER OF THE CORRUGATED STAINLESS-STEEL TUBING (IF |
| APPLICABLE) FOR EACH PIPE SIZE PER THE WPB AMENDMENTS |
| FBC SEC.107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. |
| |
| 7. SECOND REQUEST; TYPE OF GAS (LP OR NATURAL) PER THE |
| WPB AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON |
| CONSTRUCTION DOCUMENTS. |
| |
| 8. SECOND REQUEST; INDICATE THE DELIVERY PRESSURE (PSI) |
| OF THE SYSTEM ON THE PLAN PER THE 2020 FBC FG SEC. |
| 402.2. |
| |
| 9. SECOND REQUEST; SUBMIT MANUFACTURER'S SPECIFICATION |
| SHEETS/INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO |
| VERIFY COMPLIANCE WITH 2020 FBC FG SEC.305.1. |
| |
| 10. SECOND REQUEST; GAS APPLIANCES SHALL BE LISTED AND |
| LABELED. THE INSTALLATION MANUALS FOR ALL GAS |
| APPLIANCES/EQUIPMENT SHALL BE ONSITE AT THE TIME OF |
| INSPECTION PER THE 2020 FBC FG SECS. 402.2 AND 301.3. |
| |
| 11. SECOND REQUEST; LIST THE BTU LOAD OF EACH APPLIANCE |
| AND THE TOTAL BTU LOAD ON THE SYSTEM. REFER TO THE 2020 |
| FBC FG SECS. 401.8 THROUGH 402.6.1 AND TABLES 402.4 (1) |
| THROUGH 402.4 (37). |
| |
| 12. SECOND REQUEST; SHOW THE DISTANCE FROM THE POINT OF |
| DELIVERY (GAS METER / MP REGULATOR / LP TANK) TO THE |
| MOST REMOTE OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| THE 2020 FBC FG SEC. 402.4.1. |
| |
| 13. SECOND REQUEST; PLEASE SUBMIT THE SIZING TABLE USED |
| IN THE DESIGN FOR THE GAS SYSTEM OR PLACE A NOTE ON |
| BOTH SETS OF PLANS LISTING THE SIZING TABLES FROM GAS |
| CODES OR ANOTHER STANDARD THAT WERE USED IN THE DESIGN |
| OF THIS SYSTEM PER THE 2020 FBC FG SEC. 402.3. |
| |
| 14. PLEASE SUBMIT CALCULATIONS FOR COMBUSTION AIR PER |
| THE 2020 FBC FG SEC. 304.1. WHERE IS COMBUSTION AIR |
| PROVIDED BY THE BUILDING?S MECHANICAL VENTILATION |
| SYSTEM, THE SYSTEM SHALL PROVIDE THE SPECIFIED |
| COMBUSTION AIR RATE IN ADDITION TO THE REQUIRED |
| VENTILATION AIR PER THE 2020 FBC FG SEC. 304.9.3. |
| COMBINED COMBUSTION AIR AND VENTILATION AIR SYSTEM. |
| |
| 15. SECOND REQUEST; PLEASE SUBMIT THE MANUFACTURER'S |
| SPECIFICATIONS FOR THE PRESSURE REGULATORS. REGULATORS |
| INSTALLED ON THE EXTERIOR OF THE BUILDING SHALL BE |
| APPROVED FOR OUTDOOR INSTALLATION PER THE 2020 FBC FG |
| SEC. 410.1. |
| |
| 16. SECOND REQUEST; PLEASE SHOW ALL UNIONS IN FRONT OF |
| REGULATOR 1' OF EITHER SIDE PER THE 2020 FBC FG SEC |
| 410.2. |
| |
| 17. SECOND REQUEST; SHOW DRIP LEG ON EQUIPMENT |
| INSTALLED, EXCEPT FOR APPLIANCES, RANGE, DRYERS & OD |
| GRILLS PER THE 2020 FBC FG 408.2. |
| |
| 18. SECOND REQUEST; PLEASE PROVIDE THE SIGNATURE OF ALL |
| INFORMATION, DRAWINGS, SPECIFICATIONS, AND ACCOMPANYING |
| DATA THAT SHALL BEAR THE PRINTED NAME AND SIGNATURE OF |
| THE PERSON RESPONSIBLE FOR THE DESIGN PER THE WPB |
| AMENDMENTS TO THE FBC SEC.107.2.1 INFORMATION ON |
| CONSTRUCTION DOCUMENTS. |
| |
| WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION & |
| REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES. |
| A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW |
| COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION |
| MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| THE CHANGES CAN BE FOUND WILL HELP EXPEDITE YOUR |
| PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| |
| HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA |
| |
| LUIS A. CRESPO |
| PLUMBING PLAN EXAMINER / INSPECTOR |
| EMAIL: [email protected] OFFICE: 561 805-6720 |
| |