Date |
Text |
2021-06-03 16:40:39 | FBC = FLORIDA BUILDING CODE 2020 7TH EDITION |
| WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017 |
| 6TH ED, CHAPTER 1 |
| WPB CCCM=WEST PALM BEACH CROSS-CONNECTION CONTROL |
| MANUAL REVISED 2017 |
| FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 |
| 7TH EDITION |
| FBC ACC = FLORIDA ACCESSIBILITY CODE 2020 7TH EDITION |
| FBC EX = FLORIDA EXISTING BUILDING CODE 2020 7TH |
| EDITION |
| FBC PL = FLORIDA PLUMBING CODE 2020 7TH EDITION |
| FBC FG = FLORIDA FUEL GAS CODE 2020 7TH EDITION |
| NFPA 54 = NATIONAL FUEL GAS CODE |
| NFPA 96 = STANDARD FOR VENTILATION CONTROL AND FIRE |
| PROTECTION OF COMMERCIAL COOKING OPERATIONS 2017FAC= |
| FLORIDA ADMINISTRATIVE CODE |
| FS = FLORIDA STATUTES |
| |
| |
| 1ST REVIEW |
| |
| GAS COMMENTS: DENIED |
| |
| PROVISO: WATER HEATER SCHEDULE INDICATES THAT AN |
| ALTERNATE MANUFACTURER MAY BE SUBMITTED TO A/E FOR |
| APPROVAL AND USE. PLEASE NOTE THAT A MANUFACTURER?S |
| SPECIFICATION INSTALLATION MANUAL SHALL BE SUBMITTED TO |
| THE BUILDING DEPARTMENT FOR REVIEW AND APPROVAL AND IF |
| DIFFERENT FROM THE CURRENT SCHEDULE A PLAN REVISION |
| SHALL BE SUBMITTED TO THE BUILDING DEPARTMENT FOR |
| REVIEW AND APPROVAL. BOTH SHALL BE ON SITE FOR FINAL |
| INSPECTION. |
| |
| PROVISO: REGULATOR SCHEDULE INDICATES THAT AN ALTERNATE |
| MANUFACTURER MAY BE SUBMITTED TO A/E FOR APPROVAL AND |
| USE. PLEASE NOTE THAT A MANUFACTURER?S SPECIFICATION |
| INSTALLATION MANUAL SHALL BE SUBMITTED TO THE BUILDING |
| DEPARTMENT FOR REVIEW AND APPROVAL AND IF DIFFERENT |
| FROM THE CURRENT SCHEDULE A PLAN REVISION SHALL BE |
| SUBMITTED TO THE BUILDING DEPARTMENT FOR REVIEW AND |
| APPROVAL. BOTH SHALL BE ON SITE FOR FINAL INSPECTION. |
| |
| |
| 1.WATER HEATER DETAIL; PER WPB FBC 107.2.1, CLARIFY THE |
| FOLLOWING. |
| A.SHOWS GAS SUPPLIED FROM FPU TANKS |
| B.SHOWS GAS- REGULATOR TO REDUCE PRESSURE TO 2 PSI. |
| |
| 2.SUBMIT CALCULATIONS FOR COMBUSTION AIR (NOT TO BE |
| CONFUSED WITH MAKE-UP AIR.) PER FBC FG 304.1 |
| |
| 3.GAS RISER: CLEARLY SHOW THE LOCATION OF ALL MP |
| (STEP-DOWN) REGULATORS, VALVES AND UNIONS . A LISTED |
| SHUTOFF VALVE SHALL BE INSTALLED IMMEDIATELY AHEAD OF |
| EACH MP REGULATOR. FBC FG 409.4 |
| |
| 4.NOTES ON P0.0 ARE UNCLEAR AS TO INTENT. WHERE DOES |
| THE 2PSI SYSTEM END AND THE LESS THAN 2PSI BEGIN. PER |
| WPB FBC 107.2.1, CLARIFY. IS A REGULATOR TO BE PROVIDED |
| IMMEDIATELY DOWNSTREAM OF THE FPU METER/ REGULATOR TO |
| REDUCE PRESSURE AND THEN AN APPLIANCE REGULATOR TO BE |
| SUPPLIED AT THE APPLIANCE; PER WPB FBC 107.2.1, |
| CLARIFY. PROVIDE TABLES FOR SIZING FOR 2 PSI AS WELL AS |
| LESS THAN 2 PSI. CLEARLY INDICATE ON THE PIPING PLAN, |
| THE 2 PSI PIPING AND WHICH GAS NOTE (2 OR 7) APPLIES TO |
| WHICH SECTIONS OF PIPE. |
| |
| 5.SUBMIT MANUFACTURER?S SPECIFICATION SHEETS / |
| INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY |
| COMPLIANCE FBC FG 402.2, AND 301.3. GAS APPLIANCES |
| SHALL BE LISTED AND LABELED. THE INSTALLATION MANUALS |
| FOR ALL GAS APPLIANCES / EQUIPMENT SHALL BE ONSITE AT |
| THE TIME OF INSPECTION. FBC FG 305.1 |
| |
| 6.GAS RISER: CLEARLY SHOW THE LOCATION OF THE EMERGENCY |
| HOOD SHUT DOWN SHUT OFF VALVE SHALL BE BELOW THE |
| CEILING. THE MANUAL SHUTOFF VALVE SHALL BE UPSTREAM. |
| UNION TO BE DOWN STREAM OF MANUAL VALVE. SECS. 10.4, |
| 10.5 OF NFPA 96-08. PROVIDE DETAIL. |
| |
| 7.PER WPB FBC 107.2.1, SPECIFY THE UNDERGROUND PIPING |
| MATERIAL AND PROVIDE SIZING TABLE. |
| |
| 8.PER WPB FBC 107.2.1, EXPLAIN THE DESIGNATION LNG ON |
| THE RISER DIAGRAM. IS THIS LIQUIFIED NATURAL GAS? |
| CLARIFY. |
| |
| 9.WHEN ADDING UP THE MBTU IN THE GAS FIXTURE LOAD |
| SUMMARY, I COME UP WITH 967 MBH. THE SUMMARY INDICATES |
| 588 MBH. PER WPB FBC 107.2.1, CLARIFY. |
| |
| 10.PER WPB FBC 107.2.1, SHOW LOCATION OF THE FPU |
| METER/REGULATOR ON THE PLAN VIEW. |
| |
| 11.EQUIPMENT SCHEDULE ON P2.0 IS PARTIALLY OBSCURED BY |
| A STAMP. PER WPB FBC 107.2.1, REMOVE OR RELOCATE THE |
| STAMP SO THAT THE ENTIRE SCHEDULE IS LEGIBLE. |
| |
| |
| END OF COMMENTS. |
| PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| THE PREVIOUSLY REVIEWED SHEETS.ALL PLANS TO BE SIGNED |
| AND SEALED BY THE DESIGNER AS REQUIRED BY FAC AND FS. |
| |
| |
| |
| JERALD SMITH |
| PLUMBING PLANS EXAMINER |
| CITY OF WEST PALM BEACH |
| EMAIL [email protected] |
| MOBILE 561-246-0882 |
| PLEASE NOTE THAT I TYPICALLY WORK ON TUESDAYS AND |
| THURSDAYS |
| |
| 21041277 7402 S DIXIE HWY |