Date |
Text |
2021-06-04 12:56:56 | FLOORING |
| REVIEWED BY ROGER MCPHERSON |
| 561-805-6716 |
| [email protected] |
| CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| AMENDMENTS |
| |
| CORRECTIONS NEEDED - |
| I LOOKED UP THE BUILDINGS PLANS AND I SEE THAT THE |
| STRUCTURAL FLOOR SYSTEM IS BAR JOIST WITH A 2.5 INCH |
| CONCRETE SLAB. THE TEST REPORT THAT YOU PROVIDED IS FOR |
| AN 6 INCH SLAB. THE ACOUSTICAL TEST REPORT WILL NEED TO |
| BE FOR A SIMILAR TYPE FLOOR SYSTEM. YOU CAN ALSO |
| PROVIDE AN ANALYSIS FROM A DESIGN PROFESSIONAL TO |
| COMPLY WITH THE SOUND REQUIREMENTS OF FBC 1207 |
| 1) THE FOLLOWING ACUSTICAL TEST REPORTS ARE REQUIRED: |
| |
| MANUFACTURER SPEC SHEETS ARE NOT ACCEPTABLE DUE TO |
| DISCREPANCIES BETWEEN SPEC SHEETS/BROCHURES AND TEST |
| REPORTS FOR SOME MANUFACTURERS (NOT NECESSARILY THE |
| MANUFACTURER SELECTED; THIS IS A GENERAL COMMENT) |
| |
| A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING |
| DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR |
| SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS |
| (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR |
| BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90.. |
| PROVIDE A COPY OF THE TEST REPORT. |
| |
| B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN |
| DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC |
| OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN |
| IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN |
| 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH |
| ASTM E 492. PROVIDE A COPY OF THE TEST REPORT. |
| |
| C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE |
| BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL |
| INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID |
| DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED |
| TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE |
| 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84 |
| OR UL 723. (DO NOT NEED THIS REPORT IF THE PADDING IS |
| ATTACHED TO THE FLOORING) |
| |
| 2). PLEASE EMAIL ME THE PROPOSED TEST REPORTS TO VERIFY |
| BEFORE RESUBMITTING TO PROJECTDOX ( [email protected] |
| ) |
| |
| |
| |