2021-05-04 08:41:03 | 05/04/21 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS |
| |
| NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| |
| 1. PLEASE SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR |
| THE MAXIMUM SYSTEM FLOW. THE TDH CALCULATIONS MUST |
| INCLUDE ALL THE SYSTEM COMPONENTS, INCLUDING SUCTION |
| AND RETURN PIPING, FITTINGS, VALVES, HEATER, AND |
| FILTER. ALL SYSTEM COMPONENTS EXCEPT THE PUMP. |
| |
| 2. PLEASE THE POOL PUMP CURVE. IDENTIFY ON THE PUMP |
| CURVE WHICH CURVE KEY IS SPECIFIC TO THE PUMP BEING |
| INSTALLED ON THIS POOL. THIS IS NEEDED TO CONFIRM THE |
| MAXIMUM SYSTEM FLOW FROM THE TDH CALCULATIONS PER THE |
| ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, 4.4.9.1. INDICATE |
| ON THE PUMP CURVE WHICH CURVE KEY IS FOR THE PUMP BEING |
| INSTALLED ON THIS SYSTEM PER THE WPB AMEND. TO FBC SEC. |
| 107.2.1. |
| |
| 3. PLEASE SUBMIT THE MANUFACTURER'S SPECIFICATIONS FOR |
| THE HEATER, FILTER, AND PUMP PER THE WPB AMENDMENTS TO |
| FBC SEC. 107.2.1. |
| |
| 4. HEATED SWIMMING POOLS AND INGROUND PERMANENTLY |
| INSTALLED SPAS SHALL BE EQUIPPED WITH A VAPOR-RETARDANT |
| COVER ON OR AT THE WATER SURFACE OR A LIQUID COVER OR |
| OTHER MEANS PROVEN TO REDUCE HEAT LOSS PER THE 2017 |
| FBC- ENERGY- SEC. R 403.10.3. |
| |
| WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION & |
| REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES. |
| A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW |
| COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION |
| MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| THE CHANGES CAN BE FOUND WILL HELP EXPEDITE YOUR |
| PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| |
| HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA |
| |
| LUIS A. CRESPO |
| PLUMBING PLAN EXAMINER / INSPECTOR |
| EMAIL: [email protected] OFFICE: 561 805-6720 |
| |