2021-04-27 15:41:28 | 04/27/21 1ST GAS REVIEW**DENIED** WITH COMMENTS |
| |
| NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| |
| 1. A SUB GAS PERMIT IS REQUIRED BY A LICENSED |
| CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS |
| TO THE FBC SEC. 105.1. |
| |
| 2. PLEASE CLEARLY SHOWS THE LENGTH OF ALL CUT SECTIONS |
| OF PIPE PER 2020 FBC RES. SECS. G2413.4.1, G2413.4.2. |
| |
| 3. PLEASE PROVIDE THE TYPE OF GAS (LP OR NATURAL) PER |
| THE WPB AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION |
| ON CONSTRUCTION DOCUMENTS. |
| |
| 4. PLEASE INDICATE THE DELIVERY PRESSURE (PSI) OF THE |
| SYSTEM ON THE PLAN PER THE 2020 FBC RES. SEC. G2413.2. |
| |
| 5. THE HEATER SHOWS 199 CFH, AND THIS IS USUALLY FOR A |
| TANK-LESS PLEASE CLARIFY AND IF IT IS, PLEASE SEE THE |
| COMMENT BELOW PER THE WPB AMENDMENTS TO THE FBC SEC. |
| 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. |
| |
| 6. THIS TANK-LESS UNIT CALL FOR A 10.5? WATER COLUMN, |
| AND THE SERVICE METER DISCHARGES IS A 12? WATER COLUMN |
| REQUIRING A REGULATOR FOR THIS UNIT AS PER THE |
| MANUFACTURER'S SPECIFICATION. SUBMIT MANUFACTURER?S |
| SPECIFICATIONS FOR THE PRESSURE REGULATORS. REGULATORS |
| INSTALLED ON THE BUILDING'S EXTERIOR SHALL BE APPROVED |
| FOR OUTDOOR INSTALLATION PER THE 2020 FBC RES. SEC. |
| G2421.1. |
| |
| 7. PLEASE SUBMIT THE MANUFACTURER?S SPECIFICATIONS FOR |
| THE PRESSURE REGULATORS. REGULATORS INSTALLED ON THE |
| BUILDING'S EXTERIOR SHALL BE APPROVED FOR OUTDOOR |
| INSTALLATION PER THE 2020 FBC RES. SEC. G2421.1. |
| |
| 8. PLEASE SHOW ALL UNIONS IN FRONT OF REGULATOR 1? OF |
| EITHER SIDE PER THE 2020 FBC RES. SEC G2421.2. |
| |
| 9. PLEASE SHOW DRIP LEG ON GAS HEATER PER THE 2020 FBC |
| RES. SEC. G2419.2. |
| |
| 10. PLEASE SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, |
| SIZE, TERMINATION POINT, HEIGHT ABOVE THE ROOF, AND |
| ANCHORING DETAILS OF THE GAS VENT(S) PER THE 2020 FBC |
| RES. SECS. G2426 THRU G2429.1. |
| |
| 11. PLEASE SHOW THAT THE SHUTOFF VALVE WILL BE |
| ACCESSIBLE WITHOUT MOVING THE APPLIANCE PER THE 2020 |
| FBC RES. SEC. G2420.5. |
| |
| 12. PLEASE PROVIDE VENTING DIAGRAMS SHOWING THE TYPE |
| AND SIZE OF GAS VENTS, GAS VENT RUNS, AND TERMINATION |
| LOCATIONS- SECTION 503 FBC FG. |
| |
| 13. PLEASE SUBMIT CALCULATIONS FOR COMBUSTION AIR PER |
| THE 2020 FBC RES. SEC. G2407.1 AND G2439.4 (CLOTHES |
| DRYERS). SHOW THE LOCATION OF THE METAL LOUVERS THAT |
| ARE BEING INSTALLED FOR THE COMBUSTION AIR. IF USING |
| LOUVERS, THEY CANNOT BE LOCATED ON AN EXTERIOR WALL |
| THAT IS FIRE RATED AS THE FIRE RATING OF THE WALL MUST |
| BE MAINTAINED PER THE WPB AMENDMENTS TO FBC |
| SEC.107.2.1. |
| |
| 14. PLEASE SHOW THE SIZE OF THE LOUVER(S) ON THE PLANS |
| PER THE WPB AMENDMENTS TO THE FBC SEC. 107.2.1 |
| INFORMATION ON CONSTRUCTION DOCUMENTS. |
| |
| 15. PLEASE SUBMIT MANUFACTURER?S SPECIFICATION |
| SHEETS/INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO |
| VERIFY COMPLIANCE WITH 2020 FBC RES. SEC. G2408.1. |
| |
| 16. GAS APPLIANCES SHALL BE LISTED AND LABELED. THE |
| INSTALLATION MANUALS FOR ALL GAS APPLIANCES/EQUIPMENT |
| SHALL BE ONSITE AT THE TIME OF INSPECTION PER THE 2020 |
| FBC RES. SEC. G2413.2 AND G2404.3. |
| |
| 17. THE GAS TABLES USED TO REFERENCE THE PLUMBING CODE, |
| PLEASE PROVIDE UNDER CODES, THE YEAR, GAS REFERENCED |
| USED PER THE WPB AMENDMENTS TO THE FBC SEC. 101.4 |
| REFERENCED CODES. |
| WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION & |
| REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES. |
| A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW |
| COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION |
| MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| THE CHANGES CAN BE FOUND WILL HELP EXPEDITE YOUR |
| PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| |
| HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA |
| |
| LUIS A. CRESPO |
| PLUMBING PLAN EXAMINER / INSPECTOR |
| EMAIL: [email protected] OFFICE: 561 805-6720 |
| |
| |