2021-05-24 10:01:47 | CONDO REMODEL |
| REVIEWED BY ROGER MCPHERSON |
| 561-805-6716 |
| [email protected]. |
| CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| AMENDMENT |
| |
| CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 |
| 1) PLEASE PROVIDE A MIAMI DADE OR FLORIDA STATE PRODUCT |
| APPROVAL FOR THE NEW EXTERIOR SWING DOORS. MAYBE THE |
| SWING DOORS SHOWN FROM THE BEDROOMS ARE CASEMENT |
| WINDOWS - PLEASE PROVIDE A WINDOW AND DOOR SCHEDULE |
| SHOWING THE SIZES AND TYPES OF EXTERIOR WINDOWS AND |
| DOORS. |
| 2) ALL DRAWINGS NEED TO BE SIGNED AND SEALED BY THE |
| ARCHITECT OR ENGINEER WHO DESIGNED THEM. FBC WPB 107.1 |
| 3) DRAWING A-13 SHOWS THE ELEVATOR LOBBY DOORS REMOVED |
| - PLEASE REVISE TO MATCH ALL OTHER DRAWINGS. |
| 4) THE FOLLOWING ACUSTICAL TEST REPORTS ARE REQUIRED: |
| FOR THE NEW TILE FLOOORING |
| |
| MANUFACTURER SPEC SHEETS ARE NOT ACCEPTABLE DUE TO |
| DISCREPANCIES BETWEEN SPEC SHEETS/BROCHURES AND TEST |
| REPORTS FOR SOME MANUFACTURERS (NOT NECESSARILY THE |
| MANUFACTURER SELECTED; THIS IS A GENERAL COMMENT) |
| |
| A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING |
| DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR |
| SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS |
| (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR |
| BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90. |
| THE TEST REPORT CANNOT INCLUDE A DROPPED GYPSUM |
| CEILING. PROVIDE A COPY OF THE TEST REPORT. |
| |
| B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN |
| DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC |
| OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN |
| IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN |
| 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH |
| ASTM E 492. THE TEST REPORT CANNOT INCLUDE A DROPPED |
| GYPSUM CEILING. PROVIDE A COPY OF THE TEST REPORT. |
| |
| C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE |
| BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL |
| INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID |
| DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED |
| TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE |
| 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84 |
| OR UL 723. (DO NOT NEED THIS REPORT IF THE PADDING IS |
| ATTACHED TO THE FLOORING) |
| |
| 5) WINDOW AND DOOR PRODUCT APPROVALS MAY BE DEFERRED |
| SUBMITTALS BY LISTING ITEMS TO BE DEFERRED ON THE |
| CONSTRUCTION DOCUMENTS - 107.3.4.1 DEFERRED SUBMITTALS. |
| FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS |
| ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE |
| NOT SUBMITTED AT THE TIME OF THE APPLICATION AND THAT |
| ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A |
| SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL |
| HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE |
| REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION |
| DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. |
| DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| OFFICIAL. |
| |