Plan Review Notes
Plan Review Notes For Permit 21031243
Permit Number 21031243
Review Stop B
Sequence Number 1
Notes
Date Text
2021-05-03 11:45:36PLAN REVIEW BUILDING
  
 CHRISTOPHER S. THROOP, C.B.O.
 PLANS EXAMINER PX3169 1&2 FAMILY - SFP306
 INSPECTOR BN4338
 BUILDING OFFICIAL BU1635
 CONSTRUCTION SERVICES DIVISION
 TEL: 561-805-6726
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
 CODES IN EFFECT:
 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 2017 NEC
  
 1ST REVIEW
  
 RESULTS: DENIED
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
 1. PROVIDE A SITE DRAINAGE PLAN.
 FBC R401.3 SITE DRAINAGE
 PROVIDE A SITE DRAINAGE PLAN SHOWING COMPLIANCE WITH
 FBC R401.3 DRAINAGE.
 SURFACE DRAINAGE SHALL BE DIVERTED TO A STORM SEWER
 CONVEYANCE OR OTHER APPROVED POINT OF COLLECTION THAT
 DOES NOT CREATE A HAZARD.
 LOTS SHALL BE GRADED TO DRAIN SURFACE WATER AWAY FROM
 FOUNDATION WALLS. THE GRADE SHALL FALL A MINIMUM OF 6
 INCHES WITHIN THE FIRST 10 FEET.
  
 2. PROVIDE AN ENERGY SUBMITTAL.
 FBCE-101.5.1.1.2 SIMULATED PERFORMANCE ALTERNATIVE.
 AN ACCURATELY COMPLETED RESIDENTIAL BUILDING FORM R405
 (GENERATED BY COMMISSION APPROVED SOFTWARE) SHALL BE
 SUBMITTED TO THE BUILDING OFFICIAL TO DEMONSTRATE CODE
 COMPLIANCE BY SECTION 405.
  
 3. PROVIDE FL PRODUCT APPROVALS FOR WINOWS AND DOORS.
 FBC 107.3.4 PROVIDE PRODUCT APPROVALS FOR THOSE
 PRODUCTS WHICH ARE REGULATED BY FAC RULE 9N-3 REVIEWED
 AND APPROVED IN WRITING BY THE DESIGNER OF RECORD.
  
 4. PROVIDE THE ICC-ES REPORT OR A FL PRODUCT APPROVAL
 FOR THE SPRAY APPLIED INSULATION.
 FBC 107.3.4 PROVIDE PRODUCT APPROVALS FOR THOSE
 PRODUCTS WHICH ARE REGULATED BY FAC RULE 9N-3 REVIEWED
 AND APPROVED IN WRITING BY THE DESIGNER OF RECORD.
  
 5. PROVIDE A ROOF SHEATHING FASTENER SCHEDULE PER THE
 ROOF ZONE PRESSURE CALCULATIONS ON PLAN PAGE S-3.
 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS
 SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH
 107.2.5.
 TABLE R301.2.1.2 WINDBORNE DEBRIS PROTECTION FASTENING
 SCHEDULE FOR WOOD STRUCTURAL PANELS.
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved