Date |
Text |
2021-04-06 11:27:22 | COMMERCIAL ALTERATION |
| REVIEWED BY ROGER MCPHERSON |
| 561-805-6716 |
| [email protected] |
| CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| AMENDMENTS |
| |
| CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 |
| 1) PLEASE SHOW THE ROOF SLOPE TO COMPLY WITH FBC |
| 1507.10.1 |
| 2) CANNOT SET ROOF TOP EQUIPMENT ON EMBEDDED 4X4'S - |
| PLEASE SHOW MECHANICAL EQUIPMENT ON THE ROOF TO COMPLY |
| WITH FBC 1510.10 MECHANICAL UNITS. |
| ROOF MOUNTED MECHANICAL UNITS SHALL BE MOUNTED ON CURBS |
| RAISED A MINIMUM OF 8 INCHES (203 MM) ABOVE THE ROOF |
| SURFACE, OR WHERE ROOFING MATERIALS EXTEND BENEATH THE |
| UNIT, ON RAISED EQUIPMENT SUPPORTS PROVIDING A MINIMUM |
| CLEARANCE HEIGHT IN ACCORDANCE WITH TABLE 1510.10. |
| 3) ADDING R30 BAT INSULATION IN 2X10 JOIST WILL NOT |
| ALLOW FOR THE REQUIRED AIR GAP SEE FBC 1203.2 |
| VENTILATION REQUIRED. |
| ENCLOSED ATTICS AND ENCLOSED RAFTER SPACES FORMED WHERE |
| CEILINGS ARE APPLIED DIRECTLY TO THE UNDERSIDE OF ROOF |
| FRAMING MEMBERS SHALL HAVE CROSS VENTILATION FOR EACH |
| SEPARATE SPACE BY VENTILATION OPENINGS PROTECTED |
| AGAINST THE ENTRANCE OF RAIN AND SNOW. BLOCKING AND |
| BRIDGING SHALL BE ARRANGED SO AS NOT TO INTERFERE WITH |
| THE MOVEMENT OF AIR. AN AIRSPACE OF NOT LESS THAN 1 |
| INCH (25 MM) SHALL BE PROVIDED BETWEEN THE INSULATION |
| AND THE ROOF SHEATHING. |
| 4) SOFFIT SCREEN VENT FOR ENCLOSED RAFTER SPACES SHOULD |
| BE CONTINUOUS TO COMPLY WITH FBC 1203.2 VENTILATION |
| REQUIRED. |
| ENCLOSED ATTICS AND ENCLOSED RAFTER SPACES FORMED WHERE |
| CEILINGS ARE APPLIED DIRECTLY TO THE UNDERSIDE OF ROOF |
| FRAMING MEMBERS SHALL HAVE CROSS VENTILATION FOR EACH |
| SEPARATE SPACE BY VENTILATION OPENINGS PROTECTED |
| AGAINST THE ENTRANCE OF RAIN AND SNOW. BLOCKING AND |
| BRIDGING SHALL BE ARRANGED SO AS NOT TO INTERFERE WITH |
| THE MOVEMENT OF AIR. |
| 5) THE CODE IN EFFECT CHANGED ON 1/1/2021 - PLEASE |
| REVISE THE DRAWINGS TO SHOW THE DESIGN PER THE CODE IN |
| EFFECT (2020 FBC USING ASCE 7-16). |
| 6) PLEASE PROVIDE COMPLETE MIAMI DADE OR FLORIDA STATE |
| PRODUCT APPROVALS FOR THE NEW EXTERIOR WINDOWS, DOORS |
| AND ROOFING SYSTEMS. |
| 7) ALL PRODUCT APPROVALS NEED TO BE REVIEWED AND MARKED |
| APPROVED BY THE BUILDING DESIGNER OF RECORD OR BE |
| LISTED BY PERMIT NUMBER ON THE DRAWINGS. |
| 8) PLEASE SHOW THE WIND DESIGN CRITERIA USED PER FBC |
| 1603.1.4 |
| 9) PLEASE SHOW THE STRAPPING FOR THE 2X10 JOIST TO THE |
| 2X8 BEAMS FBC 1604.8.1 |
| 10) PLEASE ACKNOWLEDGE ON THE DRAWINGS THAT THE PARKING |
| AREA WILL BE ON A SEPARATE PERMIT. WILL NEED TO SHOW |
| ACCESSIBLE PARKING AND ACCESS AISLE TO COMPLY WITH FBC |
| CHAPTER 5. |
| 11) PLEASE SHOW THE ACCESSIBLE RESTROOM DETAILS PER FBC |
| ACCESSIBILITY CHAPTER 6 - SHOW GRAB BAR HEIGHTS, |
| LENGTHS AND LOCATIONS, SHOW MIRROR HEIGHT TO THE |
| REFLECTING SURFACE, SHOW PAPER DISPENSER HEIGHTS AND |
| DISTANCE FROM WATER CLOSETS ETC.. |
| 12) JOB COST SHOWN ON THE BUILDING PERMIT APPLICATION |
| APPEARS TO BE LOW - PLEASE REVISE THE BUILDING PERMIT |
| APPLICATION SHOWING THE CORRECT JOB VALUE - FBC WPB |
| 109.3 BUILDING PERMIT VALUATIONS. IF, IN THE OPINION OF |
| THE BUILDING OFFICIAL, THE CLAIMED VALUATION |
| OF BUILDING, ALTERATION, STRUCTURE, ELECTRICAL, GAS, |
| MECHANICAL OR PLUMBING SYSTEMS APPEARS TO BE |
| UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE |
| DENIED, UNLESS THE APPLICANT CAN SHOW |
| DETAILED, QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED |
| CONTRACTS (EXCLUDING LAND VALUE) TO MEET THE |
| APPROVAL OF THE BUILDING OFFICIAL. FOR PERMITTING |
| PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL |
| BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING |
| ONLY LAND VALUE. |
| |