Date |
Text |
2021-04-05 13:53:45 | BATH REMODEL |
| REVIEWED BY ROGER MCPHERSON |
| 561-805-6716 |
| [email protected] |
| CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| AMENDMENTS |
| |
| CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 |
| 1) FOR THE TILE FLOORING REPLACEMENT PLEASE PROVIDE THE |
| FOLLOWING DOCUMENTS - |
| THE FOLLOWING ACUSTICAL TEST REPORTS ARE REQUIRED: |
| |
| MANUFACTURER SPEC SHEETS ARE NOT ACCEPTABLE DUE TO |
| DISCREPANCIES BETWEEN SPEC SHEETS/BROCHURES AND TEST |
| REPORTS FOR SOME MANUFACTURERS (NOT NECESSARILY THE |
| MANUFACTURER SELECTED; THIS IS A GENERAL COMMENT) |
| |
| A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING |
| DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR |
| SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS |
| (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR |
| BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90. |
| THE TEST REPORT CANNOT INCLUDE A DROPPED GYPSUM |
| CEILING. PROVIDE A COPY OF THE TEST REPORT. |
| |
| B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN |
| DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC |
| OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN |
| IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN |
| 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH |
| ASTM E 492. THE TEST REPORT CANNOT INCLUDE A DROPPED |
| GYPSUM CEILING. PROVIDE A COPY OF THE TEST REPORT. |
| |
| C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE |
| BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL |
| INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID |
| DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED |
| TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE |
| 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84 |
| OR UL 723. |
| |
| PLEASE EMAIL ME THE PROPOSED TEST REPORTS TO VERIFY |
| BEFORE RESUBMITTING TO PROJECTDOX ([email protected]) |
| |
| 2) JOB VALUE SHOWN ON THE BUILDING PERMIT APPLICATION |
| APPEARS TO BE LOW - (JOB VALUE IS MATERIAL AND LABOR) |
| FBC 109.3 - PLEASE PROVIDE A SIGNED CONTRACT SHOWING |
| THE JOB VALUE. |
| |
| 109.3 BUILDING PERMIT VALUATIONS. IF, IN THE OPINION OF |
| THE BUILDING OFFICIAL, THE CLAIMED VALUATION |
| OF BUILDING, ALTERATION, STRUCTURE, ELECTRICAL, GAS, |
| MECHANICAL OR PLUMBING SYSTEMS APPEARS TO BE |
| UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE |
| DENIED, UNLESS THE APPLICANT CAN SHOW |
| DETAILED, QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED |
| CONTRACTS (EXCLUDING LAND VALUE) TO MEET THE |
| APPROVAL OF THE BUILDING OFFICIAL. FOR PERMITTING |
| PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL |
| BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING |
| ONLY LAND VALUE. |
| |
| |
| |