Plan Review Notes For Permit 21021410 |
Permit Number |
21021410 |
|
Review Stop |
M |
Sequence Number |
2 |
|
Notes |
Date |
Text |
2021-03-18 09:43:27 | THE AIR BALANCE REPORT SUBMITTED DATED MARCH 10,2021 IS | | NOT FROM THE ENGINEER THAT ORIGINALLY SUBMITTED THE AIR | | BALANCE SCHEDULE ON SHEET 1 OF 7 OF THE DRAWINGS. | | NEITHER AIR BALANCE REPORTS INCLUDES THE BATHROOM | | EXHAUST FANS. THE BATHROOM EXHAUST FANS MUST BE | | INCLUDED IN THE AIR BALANCE REPORT. | | | | FBC M 508.1.2AIR BALANCE. | | DESIGN PLANS FOR A FACILITY WITH A COMMERCIAL KITCHEN | | VENTILATION SYSTEM SHALL INCLUDE A SCHEDULE OR DIAGRAM | | INDICATING THE DESIGN OUTDOOR AIR BALANCE. THE DESIGN | | OUTDOOR AIR BALANCE SHALL INDICATE ALL EXHAUST AND | | REPLACEMENT AIR FOR THE FACILITY, PLUS THE NET | | EXFILTRATION IF APPLICABLE. THE TOTAL REPLACEMENT AIR | | AIRFLOW RATE SHALL EQUAL THE TOTAL EXHAUST AIRFLOW RATE | | PLUS THE NET EXFILTRATION. | | | | MICHAEL EDWARDS | | MECHANICAL EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL. 33401 | | 561-805-6728 | | [email protected] | | |
|