Date |
Text |
2021-04-29 08:06:34 | GENERATOR AND FUEL TANK |
| REVIEWED BY ROGER MCPHERSON |
| 561-805-6716 |
| [email protected]. |
| CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| AMENDMENT |
| |
| CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 |
| 1) DRAWING LS-2 SHOWS FUEL TANK ROOM AS (S-2) PLEASE |
| PROVIDE INFORMATION AS TO WHY AN (S-2) OCCUPANCY AND |
| NOT AN (H-?) OCCUPANCY CONTROL AREA FBC 414.2 |
| AND FBC 414.1.3 INFORMATION REQUIRED. |
| A REPORT SHALL BE SUBMITTED TO THE BUILDING OFFICIAL |
| IDENTIFYING THE MAXIMUM EXPECTED QUANTITIES OF |
| HAZARDOUS MATERIALS TO BE STORED, USED IN A CLOSED |
| SYSTEM AND USED IN AN OPEN SYSTEM, AND SUBDIVIDED TO |
| SEPARATELY ADDRESS HAZARDOUS MATERIAL CLASSIFICATION |
| CATEGORIES BASED ON TABLES 307.1(1) AND 307.1(2). THE |
| METHODS OF PROTECTION FROM SUCH HAZARDS, INCLUDING BUT |
| NOT LIMITED TO CONTROL AREAS, FIRE PROTECTION SYSTEMS |
| AND GROUP H OCCUPANCIES SHALL BE INDICATED IN THE |
| REPORT AND ON THE CONSTRUCTION DOCUMENTS. THE OPINION |
| AND REPORT SHALL BE PREPARED BY A QUALIFIED PERSON, |
| FIRM OR CORPORATION APPROVED BY THE BUILDING OFFICIAL |
| AND PROVIDED WITHOUT CHARGE TO THE ENFORCING AGENCY. |
| |
| FOR BUILDINGS AND STRUCTURES WITH AN OCCUPANCY IN GROUP |
| H, SEPARATE FLOOR PLANS SHALL BE SUBMITTED IDENTIFYING |
| THE LOCATIONS OF ANTICIPATED CONTENTS AND PROCESSES SO |
| AS TO REFLECT THE NATURE OF EACH OCCUPIED PORTION OF |
| EVERY BUILDING AND STRUCTURE. |