Date |
Text |
2021-02-27 08:25:58 | PLAN REVIEW / BUILDING |
| |
| CHRISTOPHER S. THROOP, C.B.O. |
| PLANS EXAMINER ? PX3169 / 1&2 FAMILY - SFP306 |
| INSPECTOR ? BN4338 |
| BUILDING OFFICIAL ? BU1635 |
| CONSTRUCTION SERVICES DIVISION |
| TEL: 561-805-6726 |
| FAX: 561-805-6676 |
| E-MAIL: [email protected] |
| |
| CODES IN EFFECT: |
| 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST |
| PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| CHAPTER 1 ADMINISTRATION |
| 2017 NEC |
| |
| 2ND REVIEW |
| |
| RESULTS: DENIED |
| ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| |
| PREVIOUS COMMENTS THAT HAVE BEEN ADDRESSED |
| SATISFACTORILY ARE MARKED AS CORRECTED. |
| PREVIOUS COMMENTS THAT HAVE NOT BEEN ADDRESSED |
| SATISFACTORILY MAY HAVE ADDITIONAL COMMENTS IN |
| PARENTHESES. ANY NEW COMMENT WILL BE LISTED AFTER |
| PREVIOUS COMMENTS. |
| |
| |
| RE: METAL ROOF |
| 1. DESIGNER SHALL SELECT MODEL, NUMBER OR NAME OF |
| ROOFING SYSTEM FROM SUMMARY OF PRODUCTS. |
| (CONTRACT SPECIFIES A 1 INCH, 24 GAUGE SNAP LOCK |
| SYSTEM. FL27499-R2 DOES NOT PROVIDE THIS SYSTEM AS AN |
| OPTION) |
| (SUBMIT PRODUCT APPROVAL WITH SYSTEM SPECIFIED IN |
| CONTRACT) |
| FBC 107.3.4 PROVIDE PRODUCT APPROVALS FOR THOSE |
| PRODUCTS WHICH ARE REGULATED BY FAC RULE 9N-3 REVIEWED |
| AND APPROVED IN WRITING BY THE DESIGNER OF RECORD. |
| |
| RE: FLAT ROOF |
| 2. PROVIDE ENHANCED FASTENER DENSITIES FOR ZONES 2 AND |
| 3 PER NOTE 5.7.2 OF THE LIMITATIONS. CALCULATIONS SHALL |
| BE PREPARED BY A DESIGN PROFESSIONAL. |
| (ZONE 3 DP IS -89.4 PER FBC TABLE R301.2(2), 1-STORY |
| STRUCTURE, EXPOSURE B) |
| (CONTRACT SPECIFIES 45 MIL. FIBERTITE ROOFING PVC WITH |
| A MDP OF -90PSF PER FL4930-R16, SYSTEM W-20, PG. 7 OF |
| 50) |
| (PRODUCT APPROVAL SUBMITTED FOR REVIEW IS FL4930-R17 |
| WITH A MDP OF -45PSF PER SYSTEM W-20, PG. 2 OF 43, |
| LIMITATIONS) |
| 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS |
| SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH |
| 107.2.5. |
| |
| 3. UPLOAD EACH NOA SEPERATELY. USE PROPER NAMING |
| CONVENTIONS. (2ND REQUEST) |
| 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS |
| SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH |
| 107.2.5. |
| |
| PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |