Date |
Text |
2021-02-19 15:25:30 | DATE: TUES. JAN. 26TH/2021 |
| ACTION: BUILDING PROVISO |
| |
| 1)BUILDING PROVISO: LEASE CONTACT THE ENGINEERING |
| DEPARTMENT, A RIGHT OF WAY PERMIT MAY NEED TO BE |
| OBTAINED TO DO WORK, OR SET UP SCAFFOLDING IN THE RIGHT |
| OF WAY. MAIN PHONE: (561) 822-1200. 107.2.1.2. |
| ADDITIONAL INFORMATION IS REQUIRED. |
| |
| 2A) BUILDING PROVISO DEFERRED SUBMITTAL: NEW FLAT ROOF |
| SECTION PLEASE SHOW COMPLIANCE WITH THE 2020 FBC-B |
| SECTIONS 1609.6.4.4.1 COMPONENTS & CLADDING. FLORIDA |
| DEPARTMENT OF COMMUNITY AFFAIRS, ADMINISTRATIVE CODE |
| 61G20-3.005, RULE 9N-3 NOV. 01/ 2010 (31) SUB-CATEGORY |
| OF PRODUCTS OR CONSTRUCTION SYSTEMS THAT WILL REQUIRE |
| PRODUCT APPROVALS: (31) (D) ROOFING PRODUCTS AND |
| ASSEMBLIES. |
| |
| 2B) BUILDING PROVISO DEFERRED SUBMITTAL: W. P. B. |
| 107.3.4. PRODUCT APPROVALS. THOSE PRODUCTS WHICH ARE |
| REGULATED BY FLORIDA ADMINISTRATIVE CODE RULE 61G20 |
| SHALL BE REVIEWED AND APPROVED IN WRITING (SHOP DRAWING |
| STAMP OF APPROVAL) BY THE DESIGNER OF RECORD PRIOR TO |
| SUBMITTAL FOR JURISDICTIONAL APPROVAL. |
| FL 61G1-23.015 (2) THE ARCHITECT IS RESPONSIBLE FOR |
| SUPERVISING AND REVIEWING ALL PROJECT DATA, REPORTS, |
| SHOP DRAWINGS ETC. |
| |
| 2C) BUILDING PROVISO DEFERRED SUBMITTAL: ROOFING: FOR |
| ALL ROOFING PRODUCTS PLEASE IDENTIFY ALL ROOFING |
| SUB-SYSTEMS AND THEIR ASSOCIATED PRESSURES FOR ROOF |
| ZONE # 1. REVIEW THE PRODUCT APPROVAL LIMITATIONS, IF |
| ENHANCED FASTENING IS ALLOWED FOR ROOF ZONES 2 & 3. |
| FASTENER DENSITIES SHALL BE INCREASED FOR BOTH |
| INSULATION & THE BASE SHEET AS CALCULATED IN COMPLIANCE |
| WITH ROOFING APPLICATION STANDARDS RAS 117. CALCULATION |
| PREPARED, SIGNED AND |
| SEALED BY A FLORIDA REGISTERED PROFESSIONAL ENGINEER OR |
| REGISTERED ARCHITECT. 1609.6.4.4.1 COMPONENTS & |
| CLADDING. |
| |
| 3) BUILDING PROVISO DEFERRED SUBMITTAL: SHEET A4.0.1. |
| SHOWS A DECORATIVE ALUMINUM FRAME TO BE DESIGNED BY A |
| DELEGATED FABRICATOR, THIS CAN BE A DEFERRED SUBMITTAL. |
| DELEGATED ENGINEERING. 61G15-30.003 ENGINEERING |
| DOCUMENT CLASSIFICATION. FL 61G-15-30.006 (3) THE |
| DELEGATED ENGINEER SHALL FORWARD THE DELEGATED |
| ENGINEERING DOCUMENTS TO THE ENGINEER OF RECORD FOR |
| REVIEW. |
| |
| 4) BUILDING PROVISO: THE ARCHITECTURAL AND STRUCTURAL |
| SHEETS BOTH SHOW THE USE OF EITHER WELDED AND OR BOLTED |
| STEEL CONNECTIONS. WELDED OR BOLTED CONNECTIONS. THE |
| CONTRACTOR IS REQUIRED TO PROVIDE WELD PROCEDURE |
| SPECIFICATIONS & WELDER OPERATOR PERFORMANCE |
| QUALIFICATION RECORDS IN ACCORDANCE WITH THE REFERENCED |
| STANDARDS AT TIME OF INSPECTION FOR FIELD WIELDING, ON |
| THE JOB-SITE WIELDING. THIRD PARTY CERTIFICATION WILL |
| BE REQUIRED. REPORTS SUBMITTED TO BUILDING INSPECTOR AT |
| TIME OF FRAMING INSPECTION. |
| 2020 FBC-B 2204.1 WELDING |
| 1. WELD PROCEDURES SPECIFICATIONS |
| 2. QUALIFICATIONS OF WELDING PERSONAL |
| 2020 FBC-B 2204.2 BOLTING. |
| IF FURTHER CLARIFICATION AND OR QUESTIONS IS REQUIRED, |
| PLEASE CONTACT THE CHIEF BUILDING INSPECTOR KEN CONRAD |
| AT 561-805-6666. |
| |
| 5) BUILDING PROVISO DEFERRED SUBMITTAL: SHEET A4.01 |
| DETAILS INDICATE THE USE OF IRONSPOT BRICK VENEER |
| CLADDING, PLEASE PROVIDE COMPLIANCE WITH 1405.10.1.4 |
| ADHERED MASONRY VENEERS. PLEASE PROVIDE INSTALLATION |
| INSTRUCTIONS AND LIMITATIONS FOR THIS PRODUCT. |
| |
| JAMES A. WITMER BN, PX, SFP, CBO |
| SENIOR COMMERCIAL COMBINATION PLANS EXAMINER |
| |