Plan Review Notes
Plan Review Notes For Permit 20121415
Permit Number 20121415
Review Stop P
Sequence Number 1
Notes
Date Text
2021-01-06 14:14:3501/06/21 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. THE CITY OF WEST PALM BEACH HAS NO RECORD OF ANY
 PERMITS THAT PERTAIN TO EXISTING PLUMBING OR GAS AT
 THIS ADDRESS. IN A CONVERSATION WITH THE BUILDING
 OFFICIAL, HE SAID THAT HE HAS SPOKEN WITH THE OWNER OF
 THIS STRUCTURE, AND HE AND I DISCUSSED THE VIOLATION.
 IT WAS NOTED THAT THIS WOULD BE TURNED BACK INTO A
 SINGLE-FAMILY HOUSE. PLEASE SHOW AND PUT A NARRATIVE ON
 THE PLANS OF THE SCOPE OF WORK. ANY PLUMBING THAT IS
 GOING TO RETURN TO ITS ORIGINAL STATE WILL HAVE TO BE
 DOCUMENTED. THE FIELD INSPECTOR MAY FIND OTHER
 VIOLATIONS, AND IN THIS REVIEW, THE EXAMINED VIOLATIONS
 FOR THIS REVIEW WILL NEED TO BE ADDRESSED.
  
 2. PLEASE REFER TO ANY PLUMBING APERTURES AS NEW, NOT
 EXISTING, AS THERE WAS NEVER PERMITTED IN THE FORM OF A
 PERMIT FOR THEM PER THE WPB AMENDMENTS TO THE FBC
 SEC.107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 3. THERE SEEM TO BE OTHER DRAWINGS, 01, 02, AND 03,
 SECTIONS OF THE FLOOR PLANS WITH NOTES AND WATER LINE
 AND NOT SIGNED OR SEALED BY THE ENGINEER OF RECORD IN
 ACCORDANCE WITH FLORIDA ADMINISTRATIVE CODE
 61G10-11.010 SEALS.
  
 4. SIGNED AND SEALED DRAWINGS NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR
 ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW - OR -
 IF YOUR ENGINEER DOES NOT HAVE AN ELECTRONIC OR DIGITAL
 SIGNATURE - PLEASE DROP OFF (CITY HALL DROPBOX) THE
 ORIGINAL SIGNED AND SEALED DOCUMENT ALONG WITH A "PLAN
 REVIEW REQUEST FORM" EXPLAINING THE REASON FOR
 SUBMITTING THE DOCUMENT OR DRAWINGS. THE PLAN REVIEW
 REQUEST FORM CAN BE OBTAINED BY EMAILING [email protected] AND
 ASKING FOR THE FORM.
  
 5. THE PLANS SUBMITTED STATE AN EXISTING GAS HEATER,
 BUT THE CITY OF WEST PALM BEACH DOES NOT HAVE ANY
 RECORD OF PERMIT OR INSPECTIONS ON THE GAS HEATER. THIS
 IS UP TO THE HOMEOWNER TO MAKE AN APPLICATION TO THE
 BUILDING OFFICIAL AND OBTAIN THE REQUIRED PERMIT PER
 THE WPB AMENDMENTS TO THE FBC SEC. 105.1.
 6. A SUB GAS PERMIT IS REQUIRED BY A LICENSED
 CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS
 TO THE FBC SEC. 105.1. PLEASE REFER TO THE COMMENTS ON
 THE GAS.
  
 7. PLEASE PROVIDE A DETAILED WORK SCOPE ON SHEET 1-1
 AND REFER TO COMMENT TWO AND SUBMITTED SCOPE OF WORK
 PER THE WPB AMENDMENTS TO THE FBC SEC. 107.2.1.
 INFORMATION ON CONSTRUCTION.
  
 8. THE WASHING MACHINE IS OUTSIDE THE RESIDENTIAL
 STRUCTURE, AND PER MANUFACTURER SPECIFICATION, THEY ARE
 NOT MADE FOR OUTSIDE USE. ARE THEY IN A STRUCTURE, AND
 IS THE STRUCTURE APPROVED? PLEASE FIND A LOCATION
 INSIDE THE HOUSE OR PROVIDE AN ENGINEERED STRUCTURE
 WITH A WIND LOAD CALCULATION ACCORDING TO PER THE 2017
 FLORIDA RESIDENTIAL CODE.
  
 9. HOT WATER LINES NOT IN CONDITION SPACE NEED TO BE
 INSULATED WITH A MINIMUM R-3 PER THE 2017 FBC SEC. RE
 403.5.3.
  
 WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES.
 A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION,
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGES CAN BE FOUND WILL HELP EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved