Date |
Text |
2021-01-06 17:12:48 | 01/06/20 2ND GAS REVIEW**DENIED** WITH COMMENTS |
| |
| NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| |
| 1. PLEASE SHOW ON GAS ISOMETRIC DRAWING THE LENGTH OF |
| ALL CUT SECTIONS OF PIPE PER 2017 FBC RES. SECS. |
| G2413.4.1, G2413.4.2. |
| |
| 2. PLEASE SHOW WHAT TYPE OF GAS (LP OR NATURAL) PER THE |
| WPB AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON |
| CONSTRUCTION DOCUMENTS. |
| |
| 3. PLEASE SUBMIT CALCULATIONS FOR COMBUSTION AIR PER |
| THE 2017 FBC FG SEC. 304.1, 614.5 (CLOTHES DRYERS), OR |
| 2017 FBC RES. SEC. G2407.1 AND G2439.4 (CLOTHES |
| DRYERS). |
| |
| 4. IF USING LOUVER FOR COMBUSTION AIR, PLEASE SHOW THE |
| SIZE OF THE LOUVER(S) ON THE PLANS PER THE WPB |
| AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON |
| CONSTRUCTION DOCUMENTS. |
| |
| 5. INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM |
| ON THE ISOMETRIC PER THE 2017 FBC RES. SEC. G2413.2. |
| |
| 6. SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE, |
| TERMINATION POINT, HEIGHT ABOVE THE ROOF, AND ANCHORING |
| DETAILS OF THE GAS VENT(S) PER THE 2017 FBC FG SECS. |
| 502 THRU 505 OR 2017 FBC RES. SECS. G2426 THRU G2429.1. |
| |
| 7. PLEASE PROVIDE MANUFACTURER?S SPECIFICATION |
| SHEETS/INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO |
| VERIFY COMPLIANCE WITH 2017 FBC RES. SEC. G2408.1. |
| |
| 8. PLEASE SUBMIT THE MANUFACTURER?S SPECIFICATIONS FOR |
| THE PRESSURE REGULATORS. REGULATORS INSTALLED ON THE |
| BUILDING'S EXTERIOR SHALL BE APPROVED FOR OUTDOOR |
| INSTALLATION PER THE 2017 FBC FG SEC. 410.1 OR 2017 FBC |
| RES. SEC. G2421.1. |
| |
| 9. PLEASE SHOW AND LABEL ALL SHUTOFF VALVES ON GAS |
| ISOMERIC PER THE 2017 FBC RES. SEC. G2401.1.3, SHUTOFF |
| VALVE FOR EACH APPLIANCE SHALL BE ACCESSIBLE WITHOUT |
| MOVING THE APPLIANCE. |
| |
| 10. PLEASE SHOW THE TANK-LESS WATER HEATER'S LOCATION |
| AND THE LOCATION AND DISTANCE OF ANY OPERABLE DOORS OR |
| WINDOWS IN RELATION TO THE WATER HEATER. THE WATER |
| HEATER'S LOCATION SHALL COMPLY WITH THE MANUFACTURER'S |
| INSTALLATION INSTRUCTIONS PER THE WPB AMENDMENTS TO THE |
| FBC SEC. 107.2.1. INFORMATION ON CONSTRUCTION |
| DOCUMENTS. |
| |
| WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION & |
| REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES. |
| A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW |
| COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION |
| MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| THE CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR |
| PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| |
| HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA |
| |
| LUIS A. CRESPO |
| PLUMBING PLAN EXAMINER / INSPECTOR |
| EMAIL: [email protected] OFFICE: 561 805-6720 |
| |