Date |
Text |
2021-01-07 14:40:36 | PLAN REVIEW / BUILDING |
| CHRISTOPHER S. THROOP, C.B.O. |
| PLANS EXAMINER BUILDING - PX3169 |
| PLANS EXAMINER 1&2 FAMILY - SFP306 |
| CONSTRUCTION SERVICES DIVISION |
| TEL: 561-805-6726 |
| FAX: 561-805-6676 |
| E-MAIL: [email protected] |
| |
| CODES IN EFFECT: |
| 2017 FLORIDA BUILDING CODE, 6TH EDITION W/2017 WEST |
| PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| CHAPTER 1 ADMINISTRATION |
| 2014 NEC |
| |
| 1ST REVIEW |
| |
| RESULTS: DENIED |
| ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| |
| 1. SCOPE OF WORK APPEARS TO INCLUDE THE SUBSTANTIAL |
| DEMOLITION OF THE EXISTING STRUCTURE. PROVIDE A DEMO |
| PLAN. DETAIL WHAT IS BEIN DEMOLISHED. |
| 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS |
| SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH |
| 107.2.5. |
| |
| 2. DELETE - N/A |
| |
| 3. PROVIDE THE FINISHED FLOOR ELEVATION. |
| R403.1.7.3 FOUNDATION ELEVATION. |
| ON GRADED SITES, THE TOP OF ANY EXTERIOR FOUNDATION |
| SHALL EXTEND ABOVE THE ELEVATION OF THE STREET GUTTER |
| AT POINT OF DISCHARGE OR THE INLET OF AN APPROVED |
| DRAINAGE DEVICE A MINIMUM OF 12 INCHES (305 MM) PLUS 2 |
| PERCENT. ALTERNATE ELEVATIONS ARE PERMITTED SUBJECT TO |
| THE APPROVAL OF THE BUILDING OFFICIAL, PROVIDED IT CAN |
| BE DEMONSTRATED THAT REQUIRED DRAINAGE TO THE POINT OF |
| DISCHARGE AND AWAY FROM THE STRUCTURE IS PROVIDED AT |
| ALL LOCATIONS ON THE SITE. |
| |
| 4. PROVIDE A SOILS REPORT. |
| R401.4 SOIL TESTS. |
| WHERE QUANTIFIABLE DATA CREATED BY ACCEPTED SOIL |
| SCIENCE METHODOLOGIES INDICATE EXPANSIVE, COMPRESSIBLE, |
| SHIFTING OR OTHER QUESTIONABLE SOIL CHARACTERISTICS ARE |
| LIKELY TO BE PRESENT, THE BUILDING OFFICIAL SHALL |
| DETERMINE WHETHER TO REQUIRE A SOIL TEST TO DETERMINE |
| THE SOIL?S CHARACTERISTICS AT A PARTICULAR LOCATION. |
| THIS TEST SHALL BE DONE BY AN APPROVED AGENCY USING AN |
| APPROVED METHOD. |
| |
| 5. PRODUCT APPROVALS INCLUDE 5 DOOR PRODUCT APPROVALS, |
| 1 DOOR NOA, 3 WINDOW PRODUCT APPROVALS, 3 WINDOW NOA'S, |
| CONCRETE ROOF TILE PRODUCT APPROVALS, METAL ROOFING |
| PRODUCT APPROVALS, BAHAMA SHUTTER PRODUCT APPROVALS, |
| PANEL WALL PRODUCT APPROVALS. |
| DESIGNER SHALL REVIEW PRODUCT APPROVALS AND REMOVE ANY |
| THAT DO NOT APPLY TO THIS PROJECT. |
| DESIGNER SHALL SELECT SPECIFIC MODEL OF DOORS AND |
| WINDOWS ON PRODUCT APPROVALS. IF NON-IMPACT RATED, |
| PROVIDE OPENING PROTECTION/SHUTTER SCHEDULE AND SHUTTER |
| PRODUCT APPROVALS. |
| FBC 107.3.4 PROVIDE PRODUCT APPROVALS FOR THOSE |
| PRODUCTS WHICH ARE REGULATED BY FAC RULE 9N-3 REVIEWED |
| AND APPROVED IN WRITING BY THE DESIGNER OF RECORD. |
| SPECIFICALLY, PROVIDE WINDOW AND DOOR SUBMITTALS. |
| |
| 6. PROVIDE A WINDOW AND DOOR SCHEDULE. INCLUDE THE |
| FOLLOWING: |
| |
| 6A) WINDOW SCHEDULE |
| |
| ITEM NUMBER/LOCATION ON |
| PLAN/TYPE/MFGR./MATERIAL/GLASS/TREATMENT/ROUGH |
| OPENING/IMPACT RESISTANT Y/N/PRODUCT APPROVAL |
| NUMBER/NOA DESIGN PRESSURE RATING/OPENING REQUIRED |
| PRESSURE RATING/EGRESS REQUIRED Y/N/SHUTTER REQUIRED |
| Y/N |
| |
| 6B) DOOR SCHEDULE |
| |
| ITEM NUMBER/LOCATION ON |
| PLAN/SIZE/THICKNESS/TYPE/MFGR./MATERIAL/JAM/ |
| ROUGH OPENING/HARDWARE/NOA DESIGN PRESSURE |
| RATING/OPENING REQUIRED PRESSURE RATING/SHUTTER |
| REQUIRED Y/N |
| |
| WHEN RESUBMITING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| RE-SUBMITTAL FORM. |
| |
| PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| |
| |
| |
| |