Date |
Text |
2021-04-12 15:31:57 | ADDING SECURITY GATES |
| REVIEWED BY ROGER MCPHERSON |
| 561-805-6716 |
| [email protected]. |
| CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| AMENDMENTS |
| |
| CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 |
| 1) OVERHEAD ROLL UP GATE DRAWINGS SHOWS A WIND PRESSURE |
| OF (-10 PSF) WHICH WILL NOT MEET THE REQUIRED WIND |
| PRESSURES FOR THAT OPENING. WILL THERE BE SIGNAGE |
| PROVIDED AS TO WHEN THE ROLL UP SCREEN DOOR WILL NEED |
| TO BE IN THE ROLLED UP POSITION? FBC 2002.7 (2) WHERE |
| SCREEN ENCLOSURES ARE DESIGNED IN ACCORDANCE WITH THE |
| SCREEN REMOVAL ALTERNATES OF THIS SECTION, REMOVABLE |
| SCREEN MAY CONSIST OF REMOVABLE PANELS, RETRACTABLE |
| PANELS, OR BY DESIGNATING SPECIFIC SCREEN PANELS IN THE |
| DESIGN IN WHICH THE SCREEN IS TO BE REMOVED BY CUTTING |
| THE SCREEN. REMOVABLE PANELS SHALL BE REMOVED, |
| RETRACTABLE PANELS SHALL BE PLACED IN THE RETRACTED |
| POSITION WITHOUT INCREASING THE LOAD ON THE AFFECTED |
| AREA. SCREEN DESIGNATED IN THE DESIGN TO BE CUT SHALL |
| BE COMPLETELY CUT WHEN WIND SPEEDS ARE FORECAST TO |
| EXCEED 75 MPH. (4) WHERE SCREEN ENCLOSURES ARE DESIGNED |
| IN ACCORDANCE WITH THE SCREEN REMOVAL ALTERNATES OF |
| THIS SECTION, RETRACTABLE SCREEN PANELS, REMOVABLE |
| SCREEN PANELS, AND SCREEN PANELS IDENTIFIED TO BE CUT |
| SHALL BE CLEARLY IDENTIFIED ON ADJACENT STRUCTURAL |
| MEMBERS WITH HIGHLY VISIBLE PERMANENT LABELS, AT EACH |
| PANEL, OR BY OTHER MEANS APPROVED BY THE LOCAL BUILDING |
| DEPARTMENT. |
| 2) TRELLIS WALL SYSTEM TO BE DEFERRED. |
| |