Date |
Text |
2021-04-12 17:51:23 | SIGNATURE REVIEW COMMENTS. |
| 1- SOIL TEST REPORT NEED TO HAVE THE ENGINEER'S |
| ORIGINAL SEAL AND SIGNATURE AS REQUIRED BY CHAPTER 471 |
| F.S. WHEN SUBMITTING DOCUMENTS FOR PUBLIC RECORDS. |
| PLEASE UPLOAD TO PROJECTDOX SOIL TEST REPORT WITH |
| ENGINEER'S DIGITAL SIGNATURE OR PROVIDE HARD COPY OF |
| SOIL TEST REPORT L WITH ENGINEER'S ORIGINAL SEAL AND |
| SIGNATURE. |
| |
| PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY |
| QUESTIONS REGARDING THESE COMMENTS, |
| JULIO GOMEZ |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| DEVELOPMENT SERVICES DEPARTMENT |
| BUILDING DIVISION |
| (561)805-6712 |
| [email protected] |
| |
| |
| |
| 2- PREVIOUS COMMENT REGARDING SHEET E-1: PLEASE UPLOAD |
| DRAWING WITH THE ENGINEER'S DIGITAL SIGNATURE IN THE |
| SIGNATURE FOLDER. |
| |
| SHEET E-1 HAS NOT BEEN DIGITALLY SIGNED. PLEASE HAVE |
| THE DESIGNER DIGITALLY SIGN AND SEAL THIS SHEET AND |
| SUBMIT ELECTRONICALLY OR YOU MAY BRING A COPY OF THE |
| ORIGINAL SIGNED AND SEALED PAPER COPY TO THE OFFICE. |
| |
| PER THE WPB AMENDMENTS TO THE FBC, EACH SHEET OF PLAN |
| (INCLUDING THE SUPPORTING DOCUMENTS) IS REQUIRED TO BE |
| SIGNED AND SEALED BY THE PERSON RESPONSIBLE FOR THE |
| DESIGN. A DIGITAL PLAN REQUIRES A DIGITAL SIGNATURE |
| WITH THE PROPER THIRD PARTY VERIFICATION. PROVIDE |
| CORRECTION. ALTERNATIVELY, A SIGNED/SEALED PAPER SET |
| MAY BE SUPPLIED TO THE BUILDING DEPARTMENT WHEN ALL |
| TRADES ARE APPROVED. WPB FBC 107.1; FS 471/481 |
| |
| MICHAEL EDWARDS |
| MECHANICAL EXAMINER |
| 401 CLEMATIS STREET |
| WEST PALM BEACH FL. 33401 |
| 561-805-6728 |
| [email protected] |
| |