2021-11-02 06:21:1211/01/21 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1) SHT. A-1.3.01 - THE SINK IN ONE OF THE TREATMENT
 ROOMS AND ONE OF THE COUPLE'S SUITES AT THE SPA SHALL
 COMPLY WITH FBC-ACCESSIBILITY SECS. 212.3, 606.1. THE
 RESPONSE NARRATIVE REFERS TO STAFFING BY "ABLE-BODIED"
 EMPLOYEES, WHICH HAS NOTHING TO DO WITH THE HEIGHT OF
 THE SINKS IN THESE ROOMS. SHOW COMPLIANCE ON THE PLANS
 WITH THE ACCESSIBILITY REQUIREMENTS FOR THE SINKS?2ND
 REQUEST.
  
 I WENT TO LOOK FOR SHEET D.2.4.02, AND IT IS MISSING.
 THE INDEX SAYS IT HAS A LOT MORE D THAN UPLOADED, SO
 THEY NEED TO BE CHECKED WITH PROJECT DOX TO SEE WHAT IS
 MISSING.
  
 2. DONE.
  
 3) SHT. P-1.1.00 - INDICATE ON THE PLAN WHAT STANDARD
 WAS USED FOR THE SIZING OF THE GREASE INTERCEPTORS.
 REFER TO FBC-PLUMBING SECS.1003.2, 1003.3.4. 2ND
 REQUEST.
  
 THE QUESTION WAS NOT ANSWERED; WE ARE LOOKING FOR THE
 STANDARD IN SIZING. WAS IT WITH THE ASME A112.14.3,
 ASME A112.14.4, ASME A112.14.6, CSA B481.3, OR PDI
 G101?
  
 4) DONE.
  
 5) SHT. P-1.5.05 - DONE AND NEW COMMENT;
  
 NEW COMMENT, WOULD YOU PLEASE LABEL THE RETURN IN THE
 LOOP WHERE THE 3/4 STARTS (HWR) TO WHERE IT GOES UP TO
 THE SECOND FLOOR PER THE WPB AMENDMENTS TO THE FBC SEC.
 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 6) SHT. P-1.5.06 DONE AND NEW COMMENT;
  
 A. THE VERBIAGE THAT IT SHALL COMPLY WITH ASSE 1024 IS
 WHAT WE LOOK FOR BUT NOT ON THE SHEET MOTIONED. WOULD
 YOU PLEASE CORRECT PER THE WPB AMENDMENTS TO THE FBC
 SEC.107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS?
  
 B. THE GUESTROOM DESIGNATED SCF REFERS TO THE 2014
 FIFTH EDITION. WOULD YOU PLEASE CORRECT PER THE WPB
 AMENDMENTS TO THE FBC SEC.107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS?
  
 7) DONE.
  
 8) DONE.
  
 9) SHT P 3.1.01 DONE AND NEW COMMENT;
  
 THERE ARE CONDENSATE LINES THAT HAVE A P-TRAP AND UNDER
 2017 FBC M307.2.4 AND P1002.1. EACH TRAP SHALL BE
 VENTED TO PERMIT THE ADMISSION OR EMISSION OF AIR SO
 THAT THE SEAL OF ANY FIXTURE TRAP SHALL NOT BE
 SUBJECTED TO A PRESSURE DIFFERENTIAL OF MORE THAN 1
 INCH OF WATER COLUMN PER THE 2017 FBC SECTION 901.2
 TRAP SEAL PROTECTION. THE CONDENSATE LINE DOES NOT SHOW
 ANY VENT TERMINATION AND LOCATION. THEY CANNOT
 TERMINATE IN A WALL AS IT HAS NO NEGATIVE OR POSITIVE
 PRESSURE TO ALLOW IT TO HAVE A DIFFERENTIAL OF ONE-INCH
 WATER COLUMN. WOULD YOU PLEASE PROVIDE DETAIL OF HOW
 THEY WILL BE VENTED PER THE WPB AMENDMENTS TO THE FBC
 SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES.
 A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGES CAN BE FOUND, WILL HELP EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved