Plan Review Notes For Permit 20121101 |
Permit Number |
20121101 |
|
Review Stop |
G |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2021-04-22 12:54:23 | 1) SUBMIT A FLOOR PLAN SHOWING THE PIPING FOR THE GAS | | SYSTEM. WPB AMEND. TO FBC SEC. 107.2.1. | | 2) SHT. P-3.0.07 - UNIONS ARE REQUIRED WITHIN ONE FOOT | | UPSTREAM OR DOWNSTREAM OF ALL GAS PRESSURE REGULATORS. | | FBC-FUEL GAS SEC.410.2 (7). | | 3) SHT. P-3.0.08 HAS A NAMING CONVENTION OF "NATURAL | | GAS" BUT THE PLAN IS OR A CONDENSATE RISER. PLEASE | | REVISE. | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | | | |
|