2021-02-10 10:39:02 | NEW 8 STORY APT AND 6 STORY PARKING GARAGE |
| REVIEWED BY ROGER MCPHERSON |
| 561-805-6716 |
| [email protected] |
| CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| AMENDMENTS |
| |
| CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 |
| 1) PLEASE CLARIFY ROOF TRUSS DESIGN - ARCHITECTURAL |
| SHOWS METAL TRUSS - STRUCTURAL DRAWINGS SHOW WOOD |
| TRUSS. |
| 2) PLEASE SHOW WALL TO TRUSS STRAPPING DETAILS TO METAL |
| OR WOOD TRUSSES. |
| 3) PLEASE SHOW PLYWOOD ATTACHMENT DETAILS TO METAL |
| TRUSSES. |
| 4) PLEASE SHOW WOOD TRUSSES AS FIRE RETARDANT PER FBC |
| 603.1 |
| 5) PLEASE SHOW CLEARLY THE REQUIREMENT OF FIRE |
| RETARDANT ROOF SHEATHING FBC 603.1 |
| 6) PLEASE SHOW THE FIRE RATING DETAILS FOR THE STEEL |
| COLUMNS PER FBC TABLE 601 (2 HRS) |
| 7) PLEASE SHOW THE GARAGE AS OPEN OR ENCLOSED AND |
| PROVIDE THE CALCULATIONS FOR THE OPEN GARAGE PER FBC |
| 406.5.2 OR VENTILATION REQUIREMENTS FOR ENCLOSED GARAGE |
| PER FBC 406.6.2 |
| 8) PLEASE SHOW THE DOOR MANEUVERING CLEARANCE TO OPEN |
| THE DOOR FROM THE INSIDE OF ALL DOORS - TO EXIT THE |
| UNIT, BATHROOM ETC (18' CLEARANCE BESIDE THE DOOR). FBC |
| ACCESSIBILITY FHA REQUIREMENT 3.USABLE DOORS. |
| SECTION 100.205(C)(2) PROVIDES THAT COVERED MULTIFAMILY |
| DWELLINGS WITH A BUILDING ENTRANCE ON AN ACCESSIBLE |
| ROUTE SHALL BE DESIGNED IN SUCH A MANNER THAT ALL THE |
| DOORS DESIGNED TO ALLOW PASSAGE BY HANDICAPPED PERSONS |
| IN WHEELCHAIRS. ANSI 4.3 ANSI 4.13.6 |
| 9) DRAWING A-4.9 "UNISEX AND POWDER ROOM" KEY NOTES DO |
| NOT MATCH THE LEGEND ON THE SAME DRAWING - PLEASE |
| CORRECT. |
| 10) DRAWING A-4.8 - THE FINISH SCHEDULE IS BLANK - |
| PLEASE CORRECT. |
| 11) PLEASE PROVIDE COMPLETE MIAMI DADE OR FLORIDA STATE |
| PRODUCT APPROVALS FOR THE EXTERIOR WINDOWS. DOORS AND |
| ROOFING SYSTEMS. ALL PRODUCT APPROVALS AND SHOP |
| DRAWINGS NEED TO BE REVIEWED AND MARKED APPROVED BY THE |
| BUILDING DESIGNER OF RECORD OR LISTED BY PRODUCT |
| APPROVAL NUMBER ON THE DRAWINGS. |
| 12) PLEASE PROVIDE A SIGNED AND SEALED SOIL REPORT AS |
| NOTED ON THE DRAWINGS. |
| 13) PLEASE PROVIDE THE FLOOR/CEILING ACOUSTICAL TEST |
| REPORTS - THE FOLLOWING ACOUSTICAL TEST REPORTS ARE |
| REQUIRED: |
| |
| MANUFACTURER SPEC SHEETS ARE NOT ACCEPTABLE DUE TO |
| DISCREPANCIES BETWEEN SPEC SHEETS/BROCHURES AND TEST |
| REPORTS FOR SOME MANUFACTURERS (NOT NECESSARILY THE |
| MANUFACTURER SELECTED; THIS IS A GENERAL COMMENT) |
| |
| A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING |
| DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR |
| SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS |
| (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR |
| BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90. |
| THE TEST REPORT CANNOT INCLUDE A DROPPED GYPSUM |
| CEILING. PROVIDE A COPY OF THE TEST REPORT. |
| |
| B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN |
| DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC |
| OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN |
| IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN |
| 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH |
| ASTM E 492. THE TEST REPORT CANNOT INCLUDE A DROPPED |
| GYPSUM CEILING. PROVIDE A COPY OF THE TEST REPORT. |
| |
| C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE |
| BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL |
| INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID |
| DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED |
| TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE |
| 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84 |
| OR UL 723. |
| |
| 14) JOB VALUE SHOWN ON THE BUILDING PERMIT APPLICATION |
| APPEARS TO BE LOW - PLEASE PROVIDE A CONTRACT, COST |
| BREAKDOWN ETC TO VERIFY THE JOB VALUE SHOWN ON THE |
| BUILDING PERMIT APPLICATION - FBC WPB AMENDMENTS ? FOR |
| PERMITTING PURPOSES THE VALUE OF ALL LABOR AND |
| MATERIALS REQUIRED TO COMPLETE THE PROJECT ARE REQUIRED |
| TO BE INCLUDED IN THE COST. FBC 109.3 BUILDING PERMIT |
| VALUATION. FOR PERMITTING PURPOSES, VALUATION OF |
| BUILDINGS AND SYSTEMS SHALL BE TOTAL REPLACEMENT VALUE |
| TO INCLUDE STRUCTURAL, ELECTRIC, PLUMBING, MECHANICAL, |
| INTERIOR FINISH, RELATIVE SITE WORK, ARCHITECTURAL AND |
| DESIGN FEES, MARKETING COST, OVERHEAD AND PROFIT; |
| EXCLUDING ONLY LAND VALUE. VALUATION REFERENCES MAY |
| INCLUDE THE LATEST PUBLISHED DATA OF NATIONAL |
| CONSTRUCTION COST ANALYSIS SERVICES (MARSHALL ? SWIFT, |
| MEANS, ETC.) AS PUBLISHED BY INTERNATIONAL CODE |
| CONGRESS. FINAL BUILDING PERMIT VALUATION SHALL BE SET |
| BY THE BUILDING OFFICIAL. |
| 15) PLEASE FILL OUT THE THRESHOLD INSPECTOR FORMS AND |
| PROVIDE THE REQUIRED DOCUMENTS - SEE THE "GUIDELINES |
| AND POLICIES FOR PROJECTS CONCERNING THRESHOLD/SPECIAL |
| INSPECTORS AND RESIDENT INSPECTORS" - YOU CAN EMAIL |
| ([email protected]) FOR A COPY OF THE GUIDELINES. |
| 16) ROOFING SYSTEMS, WINDOW / DOOR PRODUCT APPROVALS |
| AND FLOOR/CEILING ASSEMBLY ACOUSTICAL TEST REPORTS MAY |
| BE DEFERRED SUBMITTALS BY LISTING ITEMS TO BE DEFERRED |
| ON THE CONSTRUCTION DOCUMENTS - FBC WPB 107.3.4.1 |
| DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, |
| DEFERRED SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF |
| THE DESIGN THAT ARE NOT SUBMITTED AT THE TIME OF THE |
| APPLICATION AND THAT ARE TO BE SUBMITTED TO THE |
| BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL |
| OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF |
| THE BUILDING OFFICIAL. THE REGISTERED DESIGN |
| PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE |
| DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR |
| REVIEW BY THE BUILDING OFFICIAL. DOCUMENTS FOR DEFERRED |
| SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE REGISTERED |
| DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL |
| REVIEW THEM AND FORWARD THEM TO THE BUILDING OFFICIAL |
| WITH A NOTATION INDICATING THAT THE DEFERRED SUBMITTAL |
| DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL |
| CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED |
| SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE |
| DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE |
| BUILDING OFFICIAL. |
| |