Date |
Text |
2021-08-16 08:53:29 | PROVISOS: |
| 1. LIGHTING POLES ALONG ROSEMAY AVENUE SHALL MATCH THE |
| DOUBLE HEAD POLES BEING INSTALLED BY THE CITY ON EAST |
| SIDE OF ROSEMARY, AND THE POLES AND FIXTURES ALONG 2ND |
| AND 3RD SHALL MATCH THE DMP CITY STANDARD (MANUFACTURER |
| AND DESIGN). SPECS BEING PROVIDED TO APPLICANT. ALL |
| POLES ARE PURCHASE AND INSTALLATION ARE THE |
| RESPONSIBILITY OF THE DEVELOPER. |
| 2. PHOTOMETRICS ALONG ROSEMARY SHALL BE COMPLETED TO |
| ENSURE COMPLIANCE WITH MIN 06 FOOTCANDLE AT ONE FOOT |
| ABOVE THE SIDEWALK AT THE CURB SIDE. |
| 3. SIDEWALK ELEVATION SHALL BE MAINTAINED ACROSS THE |
| TWO PARKING GARAGE ENTRANCES. |
| 4.PLEASE DISCUSS WITH ENG. DEPARTMENT THE POSSIBILITY |
| TO REGRADE ON-STREET PARKING TO DRAIN TOWARDS THE |
| CENTER OR ROAD, AND RELOCATE THE GUTTER BETWEEN |
| ON-STREET PARKING AND ROAD. THE GOAL IS TO ALLOW THE |
| BULB OUTS AS A CONTINUOUS CURB. |
| 5. A MECHANICAL EQUIPMENT SCREENING PLAN SHALL BE |
| SUBMITTED FOR APPROVAL BY THE ZONIND DIVISION BEFORE |
| CONSTRUCTION STARTS. PARAPET WALL SHALLBE AS TALL AS |
| ANY ROOF TOP MECHANICAL EQUIPMENT. EQUIPMENT SHALL BE |
| GROUP TO MINIMIZE THE AREA WHERE EQUIPMENT IS LOCATED |
| AND SCREEN SHALL BE PROVIDED AROUND THE EQUIPMENT AT |
| THE MINIMUM CLEARANCE REQUIRED BY MANUFACTURER. |
| 6. PROJECT NEED TO TRANSFER 1,359 SF OF ADDITIONAL TDRS |
| TO THE SITE TO ACHIEVE THE FINAL GROSS BUILDING AREA. |