2020-12-22 13:26:08 | REMODEL GUESTHOUSE |
| REVIEWED BY ROGER MCPHERSON |
| 561-805-6716 |
| [email protected]. |
| CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 |
| AMENDMENTS |
| |
| CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 |
| 1) SIDING IS SUBJECT TO WIND LOADS - PLEASE SHOW SIDING |
| ATTACHMENTS OR PROVIDE A PRODUCT APPROVAL FOR THE |
| SIDING - FBC R703.1.2 |
| 2) PLEASE PROVIDE COMPLETE MIAMI DADE OR FLORIDA STATE |
| PRODUCT APPROVALS FOR THE NEW EXTERIOR DOORS (SWING |
| DOORS AND OVERHEAD GARAGE DOOR) - ALL PRODUCT APPROVALS |
| NEED TO BE REVIEWED AND MARKED APPROVED BY THE BUILDING |
| DESIGNER OF RECORD. |
| 3) SIDING DETAILS AND WINDOW AND DOOR PRODUCT APPROVALS |
| MAY BE DEFERRED SUBMITTALS BY LISTING ITEMS TO BE |
| DEFERRED - 107.3.4.1 DEFERRED SUBMITTALS. FOR THE |
| PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS ARE |
| DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE NOT |
| SUBMITTED AT THE TIME OF THE APPLICATION AND THAT ARE |
| TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A |
| SPECIFIED PERIOD. DEFERRAL OF ANY |
| SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE |
| BUILDING OFFICIAL. THE REGISTERED DESIGN PROFESSIONAL |
| IN RESPONSIBLE CHARGE SHALL LIST THE DEFERRED |
| SUBMITTALS ON THE CONSTRUCTION |
| DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. |
| DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| THE DESIGN OF THE BUILDING. THE DEFERRED |
| SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE |
| DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE |
| BUILDING OFFICIAL. |
| |