Plan Review Notes For Permit 20120595 |
Permit Number |
20120595 |
|
Review Stop |
SIGNATURE |
Sequence Number |
2 |
|
Notes |
Date |
Text |
2021-03-01 09:59:33 | THE PREFAB GENERATOR PAD DRAWINGS DO NOT HAVE THE | | ENGINEER'S DIGITAL SIGNATURES. ELECTRONICALLY SUBMITTED | | DRAWINGS ARE REQUIRED TO HAVE THE ENGINEER'S DIGITAL | | SIGNATURE ON THEM. YOU ALSO HAVE THE OPTION TO SUBMIT | | THE SIGNED AND SEALED PAPER VERSION OF DRAWINGS. AFTER | | THE ELECTRONIC PLANS HAVE BEEN APPROVED, YOU CAN SUBMIT | | THE CORRESPONDING PAPER DRAWINGS AT THE BUILDING | | DEPARTMENT TO BE VERIFIED. THE ENGINEER'S ORIGINAL | | HANDWRITTEN SIGNATURE AND SEAL IS REQUIRED TO BE ON THE | | DRAWINGS. NO PHOTOCOPY OR OTHER FACSIMILES OF THE | | SIGNATURE ARE ACCEPTABLE. FS 471 & 61G15 | | | | NO SIGNATURE OF CONTRACTOR ON ELECTRIC RISER DIAGRAHM. | | CT |
|