2020-12-31 09:20:5712/31/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. SIGNED AND SEALED DRAWINGS OR
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ARCHITECT TO BE
 USED IN ELECTRONIC PLAN REVIEW - OR - IF YOUR THEY DO
 NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE - PLEASE
 DROP OFF (CITY HALL DROPBOX) THE ORIGINAL SIGNED AND
 SEALED DOCUMENT ALONG WITH A "PLAN REVIEW REQUEST FORM"
 EXPLAINING THE REASON FOR SUBMITTING THE DOCUMENT OR
 DRAWINGS. THE PLAN REVIEW REQUEST FORM CAN BE OBTAINED
 BY EMAILING [email protected] AND ASKING FOR THE FORM.
  
 2. PLANS CALL OUT FOR A TOTAL OF FOUR PAGES, AND ONLY
 TWO ARE UPLOAD. INFORMATION ABOUT THIS REVIEW MAY BE ON
 THOSE PAGES MISSING, SO PLEASE UPLOAD SO A REVIEW CAN
 BE COMPLETED PER THE WPB AMENDMENTS TO THE FBC SEC.
 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 3. SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE MAIN
 DRAIN PER THE WPB AMENDMENTS TO FBC SEC. 107.2.1.
  
 4. PLEASE SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR
 THE MAXIMUM SYSTEM FLOW. THE PUMP'S MAXIMUM FLOW FROM
 ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN
 DETERMINING THE MAXIMUM SYSTEM FLOW RATE PER
 ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013
 EDITION ADDRESSES THE FLOW RATE IN GALLONS PER MINUTE
 (GPM). IT REQUIRES THAT THE MAXIMUM SYSTEM FLOW RATE
 DOES NOT EXCEED THE LISTED MAXIMUM FLOW RATE OF THE
 SUCTION OUTLET FITTING ASSEMBLY (DRAIN COVER). THE TDH
 CALCULATIONS MUST INCLUDE ALL THE SYSTEM COMPONENTS,
 INCLUDING SUCTION AND RETURN PIPING, FITTINGS, VALVES,
 HEATER, FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS
 EXCEPT THE PUMP. HAYWARD CALCULATOR CAN PROVIDE HELP
 WITH THE TDH.
  
 5. PLEASE IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS
 SPECIFIC TO THE PUMP BEING INSTALLED ON THIS POOL. THIS
 IS NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE
 TDH CALCULATIONS PER THE ANSI/APSP/ICC 7 - 2013 SECS.
 4.4.9, 4.4.9.1.
  
 6. THE PUMP SPECIFICATIONS ARE BLURRY; PLEASE SUBMIT
 CLEAR AND LEGIBLE SPECIFICATIONS FOR THE PUMP CURVE PER
 THE WPB AMEND. TO FBC SEC. 107.2.1.
  
 7. SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE SALT
 CHLORINATOR PER THE WPB AMENDMENTS TO FBC SEC. 107.2.1.
  
 8. SHOWS A VELOCITY CHART PER ANSI/APSP -7 SEC. 4.4.
 REFER TO THE 2013 EDITION OF APSP 7 PER THE WPB
 AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS.
  
 WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES.
 A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved