Plan Review Notes For Permit 20111124 |
Permit Number |
20111124 |
|
Review Stop |
B |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2020-12-15 08:07:23 | LIGHT POLE | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected]. | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | AMENDMENTS | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. | | DRAWINGS DO NOT SHOW IN "ADOBE READER" AS | | DIGITALLY/ELECTRONICALLY SIGNED. - OR - IF YOUR | | ARCHITECT OR ENGINEER DOES NOT HAVE AN ELECTRONIC OR | | DIGITAL SIGNATURE ? YOU CAN DROP OFF THE ORIGINAL | | SIGNED AND SEALED DRAWINGS/DOCUMENTS TO THE FRONT DESK | | IN THE BUILDING DEPT. AT THE CITY HALL |
|