Plan Review Notes For Permit 20110913 |
Permit Number |
20110913 |
|
Review Stop |
SIGNATURE |
Sequence Number |
2 |
|
Notes |
Date |
Text |
2021-06-24 10:50:50 | ONLY THE SIGNATURES ON DRAWINGS 1 AND 3 VERSION 2 CAN | | BE VERIFIED. ELECTRONICALLY SUBMITTED DRAWINGS ARE | | REQUIRED TO HAVE THE ARCHITECT'S OR ENGINEER'S DIGITAL | | SIGNATURE ON THEM. YOU ALSO HAVE THE OPTION TO SUBMIT | | THE SIGNED AND SEALED PAPER VERSION OF DRAWINGS. AFTER | | THE ELECTRONIC PLANS HAVE BEEN APPROVED, YOU CAN SUBMIT | | THE CORRESPONDING PAPER DRAWINGS AT THE BUILDING | | DEPARTMENT TO BE VERIFIED. THE ARCHITECT'S OR | | ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE AND SEAL IS | | REQUIRED TO BE ON THE DRAWINGS. NO PHOTOCOPY OR OTHER | | FACSIMILES OF THE SIGNATURE ARE ACCEPTABLE. FS 471 & | | 61G15, FS 481 & 61G1 | | | | |
|