2021-01-07 13:19:31 | 2ND REVIEW FBC-2017 PLUMBING |
| PERMIT- 20110733 |
| 1/7/2021 |
| |
| CODES IN EFFECT: |
| FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017 |
| FBC ACC- FLORIDA ACCESSIBILITY CODE SIXTH ADDITION 2017 |
| FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 |
| FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 |
| FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION |
| 2017 |
| FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 |
| FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION |
| 2017 |
| FS- FLORIDA STATUTES |
| FAC- FLORIDA ADMINISTRATIVE CODE |
| WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH |
| EDITION 2017 |
| |
| PLAN REVIEW RESULTS: DENIED. |
| COMMENTS FROM THE 1ST REVIEW LISTED BELOW ARE MARKED AS |
| PASSED OR FAILED. NOTES IN CAP LETTERS HAVE BEEN ADDED |
| TO SOME COMMENTS FOR CLARIFICATION. THE REQUESTED |
| NARRATIVE WHICH WOULD HELP EXPEDITE THE PLUMBING PLAN |
| REVIEW PROCESS WAS NOT SUBMITTED. PLEASE PROVIDE A |
| WRITTEN RESPOPNSE TO THE COMMENTS. |
| |
| 1) FAILED. PROVIDE PLUMBING PLANS AND SPECIFICATIONS. A |
| THOROUGH REVIEW CANNOT BE ACCOMPLISHED WITH THE |
| FOLLOWING DETAILS, DRAWINGS, SPECIFICATIONS AND |
| INFORMATION ON THE PLANS: INCOMPLETE RESPONSES-SEE |
| BELOW. |
| |
| A) PASSED. CODE COMPLIANCE DATA: PROVIDE A LIST OF |
| CURRENT CODES AND STANDARDS USED IN THE DESIGN OF THE |
| PROJECT- SECTION 107.2.1 WPB. |
| |
| B) FAILED. COMPLIANCE METHOD PER THE FLORIDA EXISTING |
| BUILDING CODE- SEE SECTION 301.3 FBC EX. |
| |
| C) FAILED. OCCUPANCY CLASSIFICATION- CHAPTER 3 FBC B. |
| |
| D) FAILED. OCCUPANCY LOAD CALCULATIONS- TABLE 1004.5 |
| FBC B. |
| |
| E) FAILED. PLUMBING FIXTURE CALCULATIONS PER TABLE |
| 403.3 FBC P. PROVIDE A SCHEDULE OF REQUIRED AND |
| PROVIDED PLUMBING FIXTURES- SECTION 107.3.5.1.3 WPB. |
| |
| F) FAILED. SANITARY AND WATER RISER LAYOUT AND RISER |
| DRAWINGS- SECTION 107.3.5.1.3 WPB. SANITARY RISER |
| DRAWING PROVIDED ONLY FOR UNIT 612. |
| |
| G) PASSED. WATER SERVICE AND BACKFLOW PREVENTION- |
| SECTION 603.1 & 604.1 FBC P, & SECTION 107.3.5.1.3 WPB. |
| PLEASE NOTE A SEPARATE PERMIT IS REQUIRED FOR WATER |
| SERVICE BACKFLOW PREVENTERS- SECTION 105.1 & 107.2.1 |
| WPB. WATER SERVICE NOW SHOWN AS EXISTING AND NO NEW |
| BACKFLOW PREVENTER. A REDLINE NOTE WILL BE ADDED TO |
| APPROVED PLANS. |
| |
| H) FAILED. WATER HEATERS AND HOT AND TEMPERED WATER |
| SYSTEMS- SECTION 107.3.5.1.3 WPB, AND SECTIONS 502.1 & |
| 607.1 FBC P. REQUIRED TEMPERED WATER FOR LAVATORY NOT |
| PROVIDED- SECTION 416.5 FBC P. |
| |
| I) FAILED. PLUMBING FIXTURE SCHEDULES- SECTION |
| 107.3.5.1.3 WPB, AND SECTION 405 FBC P. ACCESSIBLE |
| PLUMBING FIXTURES MAY BE SELECTED "BY OWNER" AS NOTED |
| ON THE PLAN HOWEVER THEY SHALL BE DESIGNATED AS |
| DEFERRED SUBMITTALS REQUIRING APPROVAL BY THE DESIGN |
| PROFESSIONALS- SECTION 107.3.4.1 WPB. |
| |
| J) PASSED. PLUMBING PIPING AND INSULATION |
| SPECIFICATIONS- SECTION 107.3.5.1.3 WPB. |
| |
| L) FAILED. ACCESSIBILITY DETAILS AND DRAWINGS IN |
| ACCORDANCE WITH SECTIONS 211, 212, 213, AND CHAPTER 6 |
| FBC ACC. SEE REQUIRED DETAILS LIST BELOW UNDER NEW |
| COMMENT #5. |
| |
| 2) DEFERRED. PROVIDE A PLUMBING SUB-PERMIT APPLICATION- |
| SECTION 105.1 WPB. THE PLUMBING SUB-PERMIT APPLICATION |
| SHALL BE SUBMITTED AND ONSITE PRIOR TO COMMENCEMENT OF |
| PLUMBING WORK. A REDLINE NOTE WILL BE ADDED TO APPROVED |
| PLANS. |
| |
| 3) DEFERRED PLEASE NOTE SEPARATE PERMITS ARE REQUIRED |
| FOR GAS PIPING, IRRIGATION SYSTEM, AND WATER SERVICE |
| BACKFLOW PREVENTERS- SECTIONS 105.1 & 107.2.1 WPB. A |
| REDLINE NOTE WILL BE ADDED TO APPROVED PLANS FOR |
| IRRIGATION. THE PLANS DO APPEAR TO INDICATE NEW GAS |
| PIPING OR BACKFLOW PREVENTERS. |
| |
| NEW COMMENTS. |
| |
| 1) SHEET P2: PROVIDE SANITARY ISOMETRIC DRAWINGS FOR |
| UNITS 614, 616, 618, AND 620- SECTION 107.3.5.1.3 WPB. |
| |
| 2) P1.0, P1.1, P2.0: PROVIDE FULL OPEN SHUTOFF VALVES |
| FOR THE WATER DISTRIBUTION SUPPLY PIPES AT THE |
| ENTRANCES OF EACH UNIT- SECTION 606.1(2) FBC P. |
| |
| 3) P1.0, P1.1, P2.0: INDICATE TEMPERED WATER WILL BE |
| PROVIDED TO THE LAVATORIES USING A TEMPERATURE LIMITING |
| DEVICE (MIXING VALVE) IN ACCORDANCE WITH SECTIONS 416.5 |
| & 617.2.1 FBC P. |
| |
| 4) P2.0: PLEASE PROVIDE EQUIPMENT SCHEDULES FOR THE NEW |
| WATER HEATERS INDICATING MAKES, MODELS, AND EFFICIENCY |
| RATINGS- TABLE C404.2 FBC EC. |
| |
| 5) ACCESSIBLE PLUMBING FIXTURE DETAILS- FBC 17 ACC: |
| A) CLEAR FLOOR SPACE DIAGRAMS AND DIMENSIONS FOR THE |
| WATER CLOSETS- SECTION 604.3. |
| B) CLEAR FLOOR SPACE DIAGRAMS AND DIMENSIONS FOR THE |
| LAVATORIES- SECTION 606.2. |
| C) TURNING SPACE DIAMETERS- SECTION 304.3. |
| D) CENTERLINES OF THE WATER CLOSETS FROM THE SIDE |
| WALLS- SECTION 604.2. |
| E) HEIGHTS OF THE WATER CLOSET SEATS FROM THE FINISHED |
| FLOORS- SECTION 604.4. |
| F) HEIGHTS OF THE MIRRORS FROM THE FINISHED FLOORS TO |
| THE REFLECTIVE SURFACES- SECTION 603.3 |
| G) LOCATIONS, LENGTHS, AND MOUNTING HEIGHTS OF GRAB |
| BARS FOR THE WATER CLOSETS- SECTION 604.5 & 609.4 |
| H) LOCATIONS OF THE WATER CLOSET FLUSH CONTROLS - |
| SECTION 604.6. |
| I) CENTERLINES OF THE TOILET PAPER DISPENSER MEASURED |
| FROM THE FRONTS OF THE WATER CLOSETS- SECTION 604.7. |
| K) KNEE AND TOE CLEARANCES FOR THE LAVATORIES- SECTION |
| 606.2 |
| SHOWERS-TRANSFER TYPES. |
| L) SHOWER DIMENSIONS- SECTION 608.2.1. |
| M) CLEAR FLOOR SPACE DIAGRAM AND DIMENSIONS FOR THE |
| SHOWER- SECTION 608.2.1 |
| N) LOCATIONS, LENGTHS, AND MOUNTING HEIGHTS OF GRAB |
| BARS FOR THE ACCESSIBLE SHOWER- SECTION 608.3 AND |
| 608.3.1 |
| O) LOCATION OF CONTROL, FAUCET, AND SHOWER SPRAY IN THE |
| SHOWER- SECTION 608.5.1. |
| P) SHOWER SPRAY UNIT SPECIFICATIONS PER SECTION 608.6. |
| SHOWER- ROLL IN TYPES. |
| Q) SHOWER DIMENSIONS- SECTION 608.2.2. |
| R) CLEAR FLOOR SPACE DIAGRAM AND DIMENSIONS FOR THE |
| SHOWER- SECTION 608.2.2.1 |
| S) LOCATIONS, LENGTHS, AND MOUNTING HEIGHTS OF GRAB |
| BARS FOR THE ACCESSIBLE SHOWER- SECTION 608.3.2 AND |
| 609.4. |
| T) LOCATION OF CONTROL, FAUCET, AND SHOWER SPRAY IN THE |
| SHOWER- SECTION 608.5.2 & 608.6. |
| U) SHOWER SPRAY UNIT SPECIFICATIONS PER SECTION 608.6. |
| |
| 6) PROVIDE ENLARGED SHOWER PAN AND THRESHOLD |
| INSTALLATION DETAILS IN ACCORDANCE WITH SECTION 417.3- |
| 417.5.2 FBC P, AND SECTION 608.7 FBC ACC. |
| |
| WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| RE-SUBMITTAL FORM. PLEASE NOTE THAT ADDITIONAL PLUMBING |
| COMMENTS MAY OCCUR AFTER THE PLANS ARE SUBMITTED AND |
| REVIEWED. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL/PLUMBING PLANS EXAMINER |
| 401 CLEMATIS STREET |
| WEST PALM BEACH FL 33401 |
| 561-805-6719 |
| [email protected] |
| |