Date |
Text |
2021-02-04 15:37:02 | NEW SFR |
| REVIEWED BY ROGER MCPHERSON |
| 561-805-6716 |
| [email protected]. |
| CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 |
| AMENDMENTS |
| |
| CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 |
| 1) ONLY ROOMS USED FOR "STORAGE", "PARKING", AND |
| "BUILDING ACCESS" CAN HAVE THE FLOOR ELEVATION BELOW |
| THE "LOWEST FLOOR" ELEVATION. THE ROOM MARKED |
| "MECHANICAL ROOM" WILL NEED TO HAVE THE LOWEST FLOOR |
| ELEVATION AT 8.00 NAVD - FLOOD ZONE IS SHOWN ON DRAWING |
| A-003 AS AE 6 - THE BUILDING "LOWEST FLOOR" (FBC |
| R322.1.5) WILL NEED TO BE 8.00 NAVD PER CITY ORDINANCE |
| 4729-17 SEC. 18-33 (1). BUILDINGS AND STRUCTURES IN |
| FLOOD HAZARD AREAS NOT DESIGNATED AS COASTAL A ZONES |
| SHALL HAVE THE LOWEST FLOORS ELEVATED TO OR ABOVE THE |
| BASE FLOOD ELEVATION PLUS TWO FEET OR THE DESIGN FLOOD |
| ELEVATION, WHICHEVER IS HIGHER. (IF THE ROOM |
| DESIGNATION IS CHANGED TO "STORAGE" IT CAN REMAIN AT |
| THE PROPOSED FLOOR ELEVATION BUT WILL REQUIRE FLOOD |
| VENTS - YOU WILL NEED TO SHOW THAT THE AC EQUIPMENT |
| WILL BE ELEVATED TO THE REQUIRED ELEVATION FBC R322.1.6 |
| - YOU MAY ALSO NEED TO REVISE THE ELEVATION CERTIFICATE |
| IF YOU ADD MORE FLOOD VENTS) |
| 2) PLEASE PROVIDE COMPLETE MIAMI DADE OR FLORIDA STATE |
| PRODUCT APPROVAL FOR THE OVERHEAD GARAGE DOOR THAT IS |
| LISTED BY PRODUCT APPROVAL NUMBER ON THE DRAWINGS. |
| 3) PLEASE PROVIDE A COMPLETE MIAMI DADE OR FLORIDA |
| STATE METAL ROOFING PRODUCT APPROVAL FOR THE METAL |
| ROOFING PRODUCT APPROVAL LISTED ON THE DRAWINGS. |
| 4) PRODUCT APPROVAL FOR THE FLAT DECK ROOFING = PLEASE |
| CIRCLE THE ROOFING SYSTEM TO BE USED IN THE PRODUCT |
| APPROVAL - IF NEEDED PLEASE PROVIDE SIGNED AND SEALED |
| ADDITIONAL ATTACHMENT DETAILS FROM AN ARCHITECT OR |
| ENGINEER FOR THE ROOF ZONES 2 AND 3 WHICH MAY REQUIRE A |
| HIGHER WIND PRESSURE - SEE NOTES ON THE PRODUCT |
| APPROVAL. |
| 5) PRODUCT APPROVAL FOR THE MULL BAR (18-0205.05) HAS |
| EXPIRED - PLEASE PROVIDE AN UPDATED MULL BAR PRODUCT |
| APPROVAL. |
| 6) DRAWING "C1" SHOWS THE FFE AT 7.63 NAVD - PLEASE |
| REVISE AS THE FLOOR PLANS WERE REVISED TO SHOW 8.13 |
| NAVD |
| |
| 7) ROOFING SYSTEM AND WINDOW AND DOOR PRODUCT APPROVALS |
| MAY BE DEFERRED SUBMITTALS BY LISTING ITEMS TO BE |
| DEFERRED ON THE CONSTRUCTION DOCUMENTS - 107.3.4.1 |
| DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, |
| DEFERRED SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF |
| THE DESIGN THAT ARE NOT SUBMITTED AT THE TIME OF THE |
| APPLICATION AND THAT ARE TO BE SUBMITTED TO THE |
| BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL |
| OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF |
| THE BUILDING OFFICIAL. THE REGISTERED DESIGN |
| PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE |
| DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR |
| REVIEW BY THE BUILDING OFFICIAL. DOCUMENTS FOR DEFERRED |
| SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE REGISTERED |
| DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL |
| REVIEW THEM AND FORWARD THEM TO THE BUILDING OFFICIAL |
| WITH A NOTATION INDICATING THAT THE DEFERRED SUBMITTAL |
| DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL |
| CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED |
| SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE |
| DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE |
| BUILDING OFFICIAL. |
| |
| |
| |