Plan Review Notes
Plan Review Notes For Permit 20110271
Permit Number 20110271
Review Stop P
Sequence Number 1
Notes
Date Text
2020-12-16 12:56:341ST REVIEW FBC-2017 PLUMBING
 PERMIT- 20110271
 12/15/2020
  
 CODES IN EFFECT:
 FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017
 FBC ACC- FLORIDA ACCESSIBILITY CODE SIXTH ADDITION 2017
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION
 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED
  
 1) SHEETS C13, L05-L08: PLEASE NOTE SEPARATE PERMITS
 AND PLANS ARE REQUIRED FOR THE POTABLE WATER SERVICE
 BACKFLOW PREVENTER, GREASE INTERCEPTOR, AND THE
 IRRIGATION SYSTEM. COMPLETE SETS OF PLANS AND
 SPECIFICATIONS ARE REQUIRED FOR REVIEW AND PERMIT
 ISSUANCE- SECTION 107.2.1 WPB.
  
 2) SHEET CS: PLEASE INCLUDE THE REQUIRED SERVICE SINK
 IN THE PLUMBING FIXTURE DATA- TABLE 403.3 FBC P.
  
 3) EQ-1, P1 & P4: THE MOP SINK AND FLOOR DRAIN BY THE
 WATER HEATER, THE FLOOR SINKS AND HUB DRAINS RECEIVING
 CONDENSATE DRAINAGE FROM REFRIGERATORS AND ICE MAKERS
 IN THE COFFEE AND TRASH AREAS, AND THE F5 HAND SINKS
 SHALL NOT CONNECT INTO THE GREASE WASTE LINE IN
 COMPLIANCE WITH SECTION 1003.3.1 FBC P. PLEASE NOTE
 THAT GREASE INTERCEPTORS AND AUTOMATIC GREASE REMOVAL
 DEVICES SHALL RECEIVE WASTE ONLY FROM FIXTURES AND
 EQUIPMENT THAT ALLOW FATS, OILS, OR GREASE TO BE
 DISCHARGED. BASED ON THE PLAN THE RESTRICTED FIXTURES
 DO NOT APPEAR TO BE SIGNIFICANT GREASE CONTRIBUTORS.
 PLEASE REVIEW THE INTERNATIONAL PLUMBING CODE- 2015
 COMMENTARY ON GREASE INTERCEPTORS FOR FURTHER
 CLARIFICATION.
  
 4) P2 & P4: PROVIDE A FULL OPEN TYPE SHUTOFF VALVE FOR
 THE 2 IN. CW WATER SERVICE/DISTRIBUTION LINE AT THE
 ENTRANCE OF THE BUILDING- SECTION 606.1(2) FBC P.
  
 5) P2 & P4: IN ACCORDANCE WITH SECTION 608.3 INDICATE
 HOW THE CSR AND FREESTYLE FILTERING SYSTEMS WILL BE
 PROTECTED AGAINST CONTAMINATION. WILL BACKFLOW
 PREVENTERS BE INSTALLED ON THE WATER SUPPLY AND FILTER
 LINES?
  
 6) P2 & P4: PROVIDE SYMBOLS TO SHOW THE LOCATIONS OF
 BACKFLOW PREVENTERS FOR SUPPLY LINES TO THE VARIOUS
 BEVERAGE DISPENSERS, ICE MAKERS, COFFEE AND CAPPUCCINO
 MACHINES, AND OTHER FIXTURES OR EQUIPMENT PERFORMING A
 SPECIAL INCLUDING THE SANITIZING EQUIPMENT AT THE MOP
 SINK- SECTION 608.3 FBC P. PLEASE NOTE THAT DETAIL
 2/P2.0 DOES NOT SHOW BACKFLOW PREVENTERS FOR THE CSRX
 LINES TO THE ICE MACHINES.
  
 7) P2, P4 & P5: PLEASE DEFINE OR EXPLAIN THE
 ABBREVIATIONS CSR AND CSRX TO CLARIFY THE FUNCTIONS OF
 THE PLUMBING LINES- SECTION 107.2.1 WPB.
  
 8) P2 & P4: PROVIDE WATER HAMMER ARRESTOR SYMBOLS FOR
 SUPPLY LINES TO THE DRINKING FOUNTAINS, ICE MAKERS,
 BEVERAGE DISPENSERS, COFFEE MACHINES, AND OTHER
 FIXTURES OR EQUIPMENT WITH QUICK CLOSING VALVES-
 SECTION 604.9 FBC P.
  
 9) P4: PROVIDE SYMBOLS TO SHOW THE REQUIRED TRAP
 PRIMERS AT FLOOR DRAINS- SECTION 1002.4.1 FBC P. PLEASE
 ADD THE DEVICES TO THE FIXTURE SPECIFICATIONS SCHEDULE
 ON P5 AND PROVIDE A DETAIL- SECTION 107.2.1 WPB.
  
 10) P2 & P4: PROVIDE A SHUT OFF VALVE FOR THE WATER
 FEED UP TO THE WCH ON THE ROOF- SECTION 606.1(4) FBC P.
  
 11) P5: PROVIDE THE EFFICIENCY RATING OF THE WATER
 HEATER AND ADD THE DATA TO THE ENERGY COMPLIANCE REPORT
 SUBMITTAL- TABLE C404.2 FBC EC.
  
 12) P1 & P5: PLEASE INCLUDE THE WATER SOFTENER AND
 BRINE TANK IN THE PLUMBING FIXTURE SPEC SCHEDULE-
 SECTION 107.2.1 WPB.
  
 13) P3 ROOF DRAIN PLAN- FBC P.
  
 A) PROVIDE ROOF DRAIN, ROOF SCUPPER, AND OVERFLOW
 SCUPPER INSTALLATION DETAILS- SECTIONS 1105.1, 1106.5,
 & 1108.1.
  
 B) PROVIDE A DETAIL SHOWING HOW THE MAIN BUILDING
 DOWNSPOUTS WILL CONNECT TO THE STORM DRAINS- 1101.6.
  
 C) SHOW THE SLOPED ROOF B AND E HORIZONTAL GUTTER RUNS
 AND SIZES- 1106.6.
  
 D) SHOW HOW THE ROOF B DOWNSPOUTS WILL TERMINATE AT THE
 ROOF SURFACES AT A1 AND A2, AND IF SOME FORM OF
 PROTECTION WILL BE PROVIDED TO MITIGATE EROSION OR
 DEGRADATION FROM THE CONCENTRATED FLOW OF WATER FROM
 DOWNSPOUTS- 1101.2, 1101.6, & 1101.7.
  
 E) PROVIDE A SIZING SCHEDULE FOR THE SECONDARY ROOF
 DRAINS- 1108.3.
  
 F) SHOW HOW THE DRAINAGE FROM ROOF E DOWNSPOUT WILL
 EITHER CONNECT TO THE STORM DRAIN SYSTEM OR TO AN
 APPROVED PLACE OF DISPOSAL- 1101.2.
  
 14) C02 SYSTEM- SECTION 107.2.1 WPB AND SECTION 1203.1
 FBC P.
  
 A) PROVIDE A C02 BOX INSTALLATION DETAIL. CLARIFY IF
 THE BOX CONTAINS THE C02 TANKS OR IF THE BOX IS A
 TRANSFER STATION FOR THE TANKS. SHOW HOW THE BOX AND
 TANKS WILL BE SECURED AND SUPPORTED.
  
 B) PLEASE SHOW THE C02 LINE RUNS THROUGH THE BUILDING
 AND HOW THE LINES WILL BE CHASED AND PROTECTED AGAINST
 DAMAGE OR LEAKAGE.
  
 C) PROVIDE A PRODUCT SUBMITTAL PACKAGE FOR THE SYSTEM.
  
 15) AC1-0 & EQ2-0: PLEASE SHOW COMPLIANCE WITH SECTIONS
 904.5.1 AND 308 (REACH RANGES) FBC ACC FOR ALL
 SELF-SERVICE SHELVES AND DISPENSING DEVICES FOR
 TABLEWARE, DISHWARE, CONDIMENTS, FOOD AND BEVERAGES,
  
 16) PLEASE PROVIDE A PRODUCT SUBMITTAL PACKAGE THAT
 INCLUDES BUT NOT IS NOT LIMITED TO THE WATER HEATER AND
 EXPANSION TANK, THE CSR AND FREESTYLE FILTERING SYSTEMS
 AND PIPING, THE WATER SOFTENER AND BRINE TANK, AND THE
 3-COMPARTMENT SINK. PLEASE NOTE THAT MANUFACTURER'S
 SPECIFICATIONS AND INSTALLATION MANUALS FOR ALL
 PLUMBING FIXTURES, EQUIPMENT, AND DEVICES MAY BE
 DEFERRED SUBMITTALS OR BE ONSITE AT TIME OF INSPECTION-
 SECTIONS 107.2.1 AND 107.3.4.1 WPB.
  
 17) ADVISORIES FOR SEPARATE PERMIT SUBMITTALS.
  
 A) BACKFLOW PREVENTER: PLEASE NOTE THAT A FL. LICENSED
 PLUMBING CONTRACTOR SHALL OBTAIN A SEPARATE PERMIT FOR
 INSTALLATION OF THE BACKFLOW PREVENTER IN ACCORDANCE
 WITH SECTION 105.1 WPB AND SEC. 90-33 WPB CODE OF
 ORDINANCES. THE DEVICE SHALL BE TESTED AND CERTIFIED BY
 THE WPB UTILITIES DEPARTMENT PRIOR TO FINAL INSPECTION
 BY THE BUILDING DEPARTMENT. PLEASE CONTACT THE WPB
 UTILITIES CENTRAL OPERATIONS DEPT.AT 561-822-2210 FOR
 FURTHER INFORMATION.
  
 B) GREASE INTERCEPTOR: SUBMITTED PLANS SHALL INCLUDE
 GREASE WATER CALCULATIONS IN ACCORDANCE WITH SECTION
 1003.3.4 FOR HYDROMECHANICAL INTERCEPTORS OR 1003.3.6
 FOR GRAVITY TYPE INTERCEPTORS. MANUFACTURER'S
 SPECIFICATIONS AND INSTALLATION MANUALS SHALL ALSO BE
 SUBMITTED FOR REVIEW.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  